40 CFR Appendix Table 1 to Subpart LLL of Part 63 - Table 1 to Subpart LLL of Part 63—Applicability of General Provisions
Table 1 to Subpart LLL of Part 63—Applicability of General Provisions
Citation | Requirement | Applies to subpart LLL | Explanation |
---|---|---|---|
63.1(a)(1)–(4) | Applicability | Yes | |
63.1(a)(5) | No | [Reserved]. | |
63.1(a)(6)–(8) | Applicability | Yes | |
63.1(a)(9) | No | [Reserved]. | |
63.1(a)(10)–(14) | Applicability | Yes | |
63.1(b)(1) | Initial Applicability Determination | No | § 63.1340 specifies applicability. |
63.1(b)(2)–(3) | Initial Applicability Determination | Yes | |
63.1(c)(1) | Applicability After Standard Established | Yes | |
63.1(c)(2) | Permit Requirements | Yes | Area sources must obtain Title V permits. |
63.1(c)(3) | No | [Reserved]. | |
63.1(c)(4)–(5) | Extensions, Notifications | Yes | |
63.1(c)(6) | Reclassification | Yes | |
63.1(d) | No | [Reserved]. | |
63.1(e) | Applicability of Permit Program | Yes | |
63.2 | Definitions | Yes | Additional definitions in § 63.1341. |
63.3(a)–(c) | Units and Abbreviations | Yes | |
63.4(a)(1)–(3) | Prohibited Activities | Yes | |
63.4(a)(4) | No | [Reserved]. | |
63.4(a)(5) | Compliance date | Yes | |
63.4(b)–(c) | Circumvention, Severability | Yes | |
63.5(a)(1)–(2) | Construction/Reconstruction | Yes | |
63.5(b)(1) | Compliance Dates | Yes | |
63.5(b)(2) | No | [Reserved]. | |
63.5(b)(3)–(6) | Construction Approval, Applicability | Yes | |
63.5(c) | No | [Reserved]. | |
63.5(d)(1)–(4) | Approval of Construction/Reconstruction | Yes | |
63.5(e) | Approval of Construction/Reconstruction | Yes | |
63.5(f)(1)–(2) | Approval of Construction/Reconstruction | Yes | |
63.6(a) | Compliance for Standards and Maintenance | Yes | |
63.6(b)(1)–(5) | Compliance Dates | Yes | |
63.6(b)(6) | No | [Reserved]. | |
63.6(b)(7) | Compliance Dates | Yes | |
63.6(c)(1)–(2) | Compliance Dates | Yes | |
63.6(c)(3)–(4) | No | [Reserved]. | |
63.6(c)(5) | Compliance Dates | Yes | |
63.6(d) | No | [Reserved]. | |
63.6(e)(1)–(2) | Operation & Maintenance | No | See § 63.1348(d) for general duty requirement. Any reference to § 63.6(e)(1)(i) in other General Provisions or in this subpart is to be treated as a cross-reference to § 63.1348(d). |
63.6(e)(3) | Startup, Shutdown Malfunction Plan | No | Your operations and maintenance plan must address periods of startup and shutdown. See § 63.1347(a)(1). |
63.6(f)(1) | Compliance with Emission Standards | No | Compliance obligations specified in subpart LLL. |
63.6(f)(2)–(3) | Compliance with Emission Standards | Yes | |
63.6(g)(1)–(3) | Alternative Standard | Yes | |
63.6(h)(1) | Opacity/VE Standards | No | Compliance obligations specified in subpart LLL. |
63.6(h)(2) | Opacity/VE Standards | Yes | |
63.6(h)(3) | No | [Reserved]. | |
63.6(h)(4)–(h)(5)(i) | Opacity/VE Standards | Yes | |
63.6(h)(5)(ii)–(iv) | Opacity/VE Standards | No | Test duration specified in subpart LLL. |
63.6(h)(6) | Opacity/VE Standards | Yes | |
63.6(h)(7) | Opacity/VE Standards | Yes | |
63.6(i)(1)–(14) | Extension of Compliance | Yes | |
63.6(i)(15) | No | [Reserved]. | |
63.6(i)(16) | Extension of Compliance | Yes | |
63.6(j) | Exemption from Compliance | Yes | |
63.7(a)(1)–(3) | Performance Testing Requirements | Yes | § 63.1349 has specific requirements. |
63.7(b) | Notification period | Yes | Except for repeat performance test caused by an exceedance. See § 63.1353(b)(6). |
63.7(c) | Quality Assurance/Test Plan | Yes | |
63.7(d) | Testing Facilities | Yes | |
63.7(e)(1) | Conduct of Tests | No | See § 63.1349(e). Any reference to 63.7(e)(1) in other General Provisions or in this subpart is to be treated as a cross-reference to § 63.1349(e). |
63.7(e)(2)–(4) | Conduct of tests | Yes | |
63.7(f) | Alternative Test Method | Yes | |
63.7(g) | Data Analysis | Yes | |
63.7(h) | Waiver of Tests | Yes | |
63.8(a)(1) | Monitoring Requirements | Yes | |
63.8(a)(2) | Monitoring | No | § 63.1350 includes CEMS requirements. |
63.8(a)(3) | No | [Reserved]. | |
63.8(a)(4) | Monitoring | No | Flares not applicable. |
63.8(b)(1)–(3) | Conduct of Monitoring | Yes | |
63.8(c)(1)–(8) | CMS Operation/Maintenance | Yes | Temperature and activated carbon injection monitoring data reduction requirements given in subpart LLL. |
63.8(d) | Quality Control | Yes, except for the reference to the SSM Plan in the last sentence | |
63.8(e) | Performance Evaluation for CMS | Yes | |
63.8(f)(1)–(5) | Alternative Monitoring Method | Yes | Additional requirements in § 63.1350(l). |
63.8(f)(6) | Alternative to RATA Test | Yes | |
63.8(g) | Data Reduction | Yes | |
63.9(a) | Notification Requirements | Yes | |
63.9(b)(1)–(5) | Initial Notifications | Yes | |
63.9(c) | Request for Compliance Extension | Yes | |
63.9(d) | New Source Notification for Special Compliance Requirements | Yes | |
63.9(e) | Notification of performance test | Yes | Except for repeat performance test caused by an exceedance. See § 63.1353(b)(6). |
63.9(f) | Notification of VE/Opacity Test | Yes | Notification not required for VE/opacity test under § 63.1350(e) and (j). |
63.9(g) | Additional CMS Notifications | Yes | |
63.9(h)(1)–(3) | Notification of Compliance Status | Yes | |
63.9(h)(4) | No | [Reserved]. | |
63.9(h)(5)–(6) | Notification of Compliance Status | Yes | |
63.9(i) | Adjustment of Deadlines | Yes | |
63.9(j) | Change in Previous Information | Yes | |
63.9(k) | Electronic reporting procedures | Yes | Only as specified in § 63.9(j). |
63.10(a) | Recordkeeping/Reporting | Yes | |
63.10(b)(1) | General Recordkeeping Requirements | Yes | |
63.10(b)(2)(i)–(ii) | General Recordkeeping Requirements | No | See § 63.1355(g) and (h). |
63.10(b)(2)(iii) | General Recordkeeping Requirements | Yes | |
63.10(b)(2)(iv)–(v) | General Recordkeeping Requirements | No | |
63.10(b)(2)(vi)–(ix) | General Recordkeeping Requirements | Yes | |
63.10(c)(1) | Additional CMS Recordkeeping | Yes | PS–8A supersedes requirements for THC CEMS. |
63.10(c)(1) | Additional CMS Recordkeeping | Yes | PS–8A supersedes requirements for THC CEMS. |
63.10(c)(2)–(4) | No | [Reserved]. | |
63.10(c)(5)–(8) | Additional CMS Recordkeeping | Yes | PS–8A supersedes requirements for THC CEMS. |
63.10(c)(9) | No | [Reserved]. | |
63.10(c)(10)–(15) | Additional CMS Recordkeeping | Yes | PS–8A supersedes requirements for THC CEMS. |
63.10(d)(1) | General Reporting Requirements | Yes | |
63.10(d)(2) | Performance Test Results | Yes | |
63.10(d)(3) | Opacity or VE Observations | Yes | |
63.10(d)(4) | Progress Reports | Yes | |
63.10(d)(5) | Startup, Shutdown, Malfunction Reports | No | See § 63.1354(c) for reporting requirements. Any reference to § 63.10(d)(5) in other General Provisions or in this subpart is to be treated as a cross-reference to § 63.1354(c). |
63.10(e)(1)–(2) | Additional CMS Reports | Yes | |
63.10(e)(3) | Excess Emissions and CMS Performance Reports | Yes | Exceedances are defined in subpart LLL. |
63.10(e)(3)(v) | Due Dates for Excess Emissions and CMS Performance Reports | No | § 63.1354(b)(9) specifies due date. |
63.10(e)(3)(vii) and (viii) | Excess Emissions and CMS Performance Reports | No | Superseded by 63.1354(b)(10). |
63.10(f) | Waiver for Recordkeeping/Reporting | Yes | |
63.11(a)–(b) | Control Device Requirements | No | Flares not applicable. |
63.12(a)–(c) | State Authority and Delegations | Yes | |
63.13(a)–(c) | State/Regional Addresses | Yes | |
63.14(a)–(b) | Incorporation by Reference | Yes | |
63.15(a)–(b) | Availability of Information | Yes |
[80 FR 44791, July 27, 2015, as amended at 83 FR 35135, July 25, 2018; 83 FR 38036, Aug. 3, 2018; 85 FR 73898, Nov. 19, 2020]