40 CFR Part 60 - Subpart VVVV - Standards of Performance for Large Municipal Waste Combustors
-
Introduction (§§ 60.5680 - 60.5685)
-
Applicability (§§ 60.5690 - 60.5725)
- § 60.5690 Does this subpart apply to my municipal waste combustor?
- § 60.5695 What is a new municipal waste combustor?
- § 60.5700 Does this subpart allow any exemptions?
- § 60.5705 Do other new source performance standards also apply to my municipal waste combustor?
- § 60.5710 What authorities to enforce these federal new source performance standards can the Administrator delegate to a state agency?
- § 60.5715 How are these new source performance standards structured?
- § 60.5720 Do all five components of these new source performance standards apply at the same time?
- § 60.5725 Are there different subcategories of municipal waste combustors within this subpart?
-
Preconstruction Requirements: Materials Separation Plan (§§ 60.5730 - 60.5785)
- § 60.5730 Who must submit a materials separation plan?
- § 60.5735 What is a materials separation plan?
- § 60.5740 What steps must I complete for my materials separation plan?
- § 60.5745 What must I include in my draft materials separation plan?
- § 60.5750 How do I make my draft materials separation plan available to the public?
- § 60.5755 When must I accept comments on the materials separation plan?
- § 60.5760 Where and when must I hold a public meeting on my draft materials separation plan?
- § 60.5765 What must I do with any public comments I receive during the public comment period on my draft materials separation plan?
- § 60.5770 What must I do with my revised materials separation plan?
- § 60.5775 What must I include in the public meeting on my revised materials separation plan and siting analysis?
- § 60.5780 What must I do with any public comments I receive on my revised materials separation plan?
- § 60.5785 How do I submit my final materials separation plan?
-
Preconstruction Requirements: Siting Analysis (§§ 60.5790 - 60.5830)
- § 60.5790 Who must submit a siting analysis?
- § 60.5795 What is a siting analysis?
- § 60.5800 What steps must I complete for my siting analysis?
- § 60.5805 What must I include in my siting analysis?
- § 60.5810 How do I make my siting analysis available to the public?
- § 60.5815 When must I accept comments on the siting analysis and revised materials separation plan?
- § 60.5820 Where and when must I hold a public meeting on the siting analysis?
- § 60.5825 What must I do with any public comments I receive during the public comment period on my siting analysis?
- § 60.5830 How do I submit my siting analysis?
-
Good Combustion Practices: Operator Training (§§ 60.5835 - 60.5860)
- § 60.5835 What types of training must I do?
- § 60.5840 Who must complete the operator training course? By when?
- § 60.5845 Who must complete the site-specific training course?
- § 60.5850 What site-specific training must I provide?
- § 60.5855 What information must I include in the site-specific operating manual?
- § 60.5860 Where must I keep the site-specific operating manual?
-
Good Combustion Practices: Operator Certification (§§ 60.5865 - 60.5875)
- § 60.5865 What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
- § 60.5870 After the required date for operator certification, who may operate the municipal waste combustor?
- § 60.5875 What if all the certified operators must be temporarily offsite?
-
Good Combustion Practices: Operating Requirements (§§ 60.5880 - 60.5885)
-
Continuous Emission Monitoring (§§ 60.5905 - 60.5955)
- § 60.5905 What types of continuous emission monitoring must I perform?
- § 60.5910 What continuous emission monitoring systems must I install for gaseous pollutants?
- § 60.5915 How are the data from the continuous emission monitoring systems used?
- § 60.5920 How do I make sure my continuous emission monitoring systems are operating correctly?
- § 60.5925 What is my schedule for evaluating continuous emission monitoring systems?
- § 60.5930 What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
- § 60.5935 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
- § 60.5940 How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
- § 60.5945 What is required for my continuous opacity monitoring system and how are the data used?
- § 60.5950 What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
- § 60.5955 What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
-
Stack Testing (§§ 60.5960 - 60.5985)
- § 60.5960 What types of stack tests must I conduct?
- § 60.5965 How are the stack test data used?
- § 60.5970 What schedule must I follow for the stack testing?
- § 60.5975 What procedures and test methods must I use to stack test?
- § 60.5980 May I conduct stack testing less often?
- § 60.5985 May I conduct continuous monitoring or sampling in lieu of stack testing?
-
Other Monitoring Requirements (§§ 60.5990 - 60.6015)
- § 60.5990 Must I meet other requirements for continuous monitoring?
- § 60.5995 How do I monitor the load of my municipal waste combustor?
- § 60.6000 How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
- § 60.6005 How do I monitor the injection rate of activated carbon?
- § 60.6010 What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems?
- § 60.6015 What requirements must I meet for estimating my municipal waste combustor capacity?
-
Recordkeeping (§§ 60.6020 - 60.6050)
- § 60.6020 What records must I keep?
- § 60.6025 Where must I keep my records and for how long?
- § 60.6030 What records must I keep for the materials separation plan and siting analysis?
- § 60.6035 What records must I keep for operator training and certification?
- § 60.6040 What records must I keep for stack tests?
- § 60.6045 What records must I keep for continuously monitored pollutants or parameters?
- § 60.6050 What records must I keep for municipal waste combustors that use activated carbon?
-
Reporting (§§ 60.6055 - 60.6110)
- § 60.6055 What reports must I submit before I submit my notice of construction?
- § 60.6060 What must I include in my notice of construction?
- § 60.6065 What reports must I submit after I submit my notice of construction and in what form?
- § 60.6070 What are the appropriate units of measurement for reporting my data?
- § 60.6075 When must I submit the initial performance test report?
- § 60.6080 What must I include in my initial performance test report?
- § 60.6085 When must I submit the annual report?
- § 60.6090 What must I include in my annual report?
- § 60.6095 What must I do if I am out of compliance with the requirements of this subpart?
- § 60.6100 If a semiannual report is required, when must I submit it?
- § 60.6105 What must I include in the semiannual out-of-compliance reports?
- § 60.6110 Can reporting dates be changed?
-
Air Curtain Incinerators That Burn 100 Percent Wood Waste, Clean Lumber, and/or Yard Waste (§§ 60.6115 - 60.6135)
- § 60.6115 What is an air curtain incinerator?
- § 60.6120 What is yard waste?
- § 60.6125 What are the emission limits for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
- § 60.6130 How must I monitor opacity for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
- § 60.6135 What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
-
Equations (§ 60.6140)
-
Definitions (§ 60.6145)
- Table 1 to Subpart VVVV—Large Municipal Waste Combustor Carbon Monoxide Limits
- Table 2 to Subpart VVVV—Emission Limitations for New Large Municipal Waste Combustors
- Table 3 to Subpart VVVV of Part 60—Requirements for Continuous Emission Monitoring Systems (CEMS)
- Table 4 to Subpart VVVV—Performance Test Requirements for Compliance With Emissions Limits under § 60.5895
Source:
91 FR 11833, Mar. 10, 2026, unless otherwise noted.