40 CFR Part 60 - Subpart WWWW - Emission Guidelines and Compliance Times for Large Municipal Waste Combustors Constructed on or Before January 23, 2024
-
Introduction (§§ 60.6250 - 60.6295)
- § 60.6250 What is the purpose of this subpart?
- § 60.6255 Am I affected by this subpart? What authorities does the EPA Administrator retain?
- § 60.6260 Is a state plan required for all states?
- § 60.6265 What must I include in my state plan?
- § 60.6270 Is there an approval process for my state plan?
- § 60.6275 What if my state plan is not approvable?
- § 60.6280 Is there an approval process for a negative declaration letter?
- § 60.6285 What compliance schedule must I include in my state plan?
- § 60.6290 Are there any state plan requirements for this subpart that supersede the requirements specified in subpart B?
- § 60.6295 Does this subpart directly affect municipal waste combustor owners and operators in my state?
-
Applicability of State Plans (§§ 60.6300 - 60.6310)
-
Model Rule—Increments or Progress (§§ 60.6330 - 60.6385)
- § 60.6330 What are my requirements for meeting increments of progress and achieving final compliance?
- § 60.6335 When must I complete each increment of progress?
- § 60.6340 What must I include in the notifications of achievement of my increments of progress?
- § 60.6345 When must I submit the notifications of achievement of increments of progress?
- § 60.6350 What if I do not meet an increment of progress?
- § 60.6355 How do I comply with the increment of progress for submittal of a control plan?
- § 60.6360 How do I comply with the increment of progress for awarding contracts?
- § 60.6365 How do I comply with the increment of progress for initiating onsite construction?
- § 60.6370 How do I comply with the increment of progress for completing onsite construction?
- § 60.6375 How do I comply with the increment of progress for achieving final compliance?
- § 60.6380 What must I do if I close my municipal waste combustor and then restart my municipal waste combustor?
- § 60.6385 What must I do if I plan to permanently close my municipal waste combustor and not restart it?
-
Model Rule—Good Combustion Practices: Operator Training (§§ 60.6390 - 60.6415)
- § 60.6390 What types of training must I do?
- § 60.6395 Who must complete the operator training course? By when?
- § 60.6400 Who must complete the site-specific training course?
- § 60.6405 What site-specific training must I provide?
- § 60.6410 What information must I include in the site-specific operating manual?
- § 60.6415 Where must I keep the site-specific operating manual?
-
Model Rule—Good Combustion Practices: Operator Certification (§§ 60.6420 - 60.6430)
- § 60.6420 What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
- § 60.6425 After the required date for operator certification, who may operate the municipal waste combustor?
- § 60.6430 What if all the certified operators must be temporarily offsite?
-
Model Rule—Good Combustion Practices: Operating Requirements (§§ 60.6435 - 60.6440)
-
Model Rule—Emission Limits (§§ 60.6445 - 60.6455)
-
Model Rule—Continuous Emission Monitoring (§§ 60.6460 - 60.6510)
- § 60.6460 What types of continuous emission monitoring must I perform?
- § 60.6465 What continuous emission monitoring systems must I install for gaseous pollutants?
- § 60.6470 How are the data from the continuous emission monitoring systems used?
- § 60.6475 How do I make sure my continuous emission monitoring systems are operating correctly?
- § 60.6480 What is my schedule for evaluating continuous emission monitoring systems?
- § 60.6485 What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
- § 60.6490 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
- § 60.6495 How do I convert my 1-hour arithmetic averages into appropriate averaging times and units?
- § 60.6500 What is required for my continuous opacity monitoring system and how are the data used?
- § 60.6505 What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
- § 60.6510 What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
-
Model Rule—Stack Testing (§§ 60.6515 - 60.6540)
- § 60.6515 What types of stack tests must I conduct?
- § 60.6520 How are the stack test data used?
- § 60.6525 What schedule must I follow for the stack testing?
- § 60.6530 What procedures and test methods must I use to stack test?
- § 60.6535 May I conduct stack testing less often?
- § 60.6540 May I conduct continuous monitoring or sampling in lieu of stack testing?
-
Model Rule—Other Monitoring Requirements (§§ 60.6545 - 60.6570)
- § 60.6545 Must I meet other requirements for continuous monitoring?
- § 60.6550 How do I monitor the load of my municipal waste combustor?
- § 60.6555 How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
- § 60.6560 How do I monitor the injection rate of activated carbon?
- § 60.6565 What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems?
- § 60.6570 What requirements must I meet for estimating my municipal waste combustor capacity?
-
Model Rule—Recordkeeping (§§ 60.6575 - 60.6600)
- § 60.6575 What records must I keep?
- § 60.6580 Where must I keep my records and for how long?
- § 60.6585 What records must I keep for operator training and certification?
- § 60.6590 What records must I keep for stack tests?
- § 60.6595 What records must I keep for continuously monitored pollutants or parameters?
- § 60.6600 What records must I keep for municipal waste combustors that use activated carbon?
-
Model Rule—Reporting (§§ 60.6605 - 60.6650)
- § 60.6605 What reports must I submit and in what form?
- § 60.6610 What are the appropriate units of measurement for reporting my data?
- § 60.6615 When must I submit the initial performance test report?
- § 60.6620 What must I include in my initial performance test report?
- § 60.6625 When must I submit the annual report?
- § 60.6630 What must I include in my annual report?
- § 60.6635 What must I do if I am out of compliance with the requirements of this subpart?
- § 60.6640 If a semiannual report is required, when must I submit it?
- § 60.6645 What must I include in the semiannual out-of-compliance reports?
- § 60.6650 Can reporting dates be changed?
-
Model Rule—Air Curtain Incinerators That Burn 100 Percent Wood Waste, Clean Lumber, and Yard Waste (§§ 60.6655 - 60.6680)
- § 60.6655 What is an air curtain incinerator?
- § 60.6660 What is yard waste?
- § 60.6665 What are the emission limits for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
- § 60.6670 How must I monitor opacity for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
- § 60.6675 What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
- § 60.6680 What equations must I use?
-
Definitions (§ 60.6685)
- Table 1 to Subpart WWWW of Part 60—Model Rule—Compliance Schedules and Increments of Progress
- Table 2 to Subpart WWWW—Municipal Waste Combustor Carbon Monoxide Guidelines
- Table 3 to Subpart WWWW of Part 60—Model Rule—Emission Limits for Existing Large Municipal Waste Combustors
- Table 4 to Subpart WWWW of Part 60—Requirements for Continuous Emission Monitoring Systems (CEMS)
- Table 5 to Subpart WWWW—Performance Test Requirements for Compliance With Emissions Limits Under § 60.6450
Source:
91 FR 11860, Mar. 10, 2026, unless otherwise noted.