§ 162.161-7 Inspections at production.

(a) The system must be inspected in accordance with this section and 46 CFR 159.007-1 through 159.007-13, and tested using any additional tests that the Commandant (CG-5214) may deem necessary to maintain control of quality and to ensure compliance with this subpart.

(b) The manufacturer must:

(1) Institute procedures to maintain control over the materials used, over the manufacturing of the systems, and over the finished systems;

(2) Admit the independent laboratory inspector and any representative of the Coast Guard to any place where work is being done on systems and any place where parts or complete systems are stored;

(3) Allow the independent laboratory inspector and any representative of the Coast Guard to take samples of systems for tests prescribed by this subpart; and

(4) Conduct a leakage test on each system cylinder-valve assembly in accordance with subsections 57.1 through 57.4.2 of UL 2166 (incorporated by reference, see § 162.161-2) for halocarbon systems or subsection 55.4 of UL 2127 (incorporated by reference, see § 162.161-2) for inert gas systems.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.

United States Code
Presidential Documents

Executive Order ... 12234

Executive Order ... 12777

Title 46 published on 2015-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 46 CFR Part 162 after this date.

  • 2015-10-16; vol. 80 # 200 - Friday, October 16, 2015
    1. 80 FR 62466 - Shipping; Technical, Organizational, and Conforming Amendments
      GPO FDSys XML | Text
      Final rule.
      This final rule is effective October 16, 2015.
      46 CFR Parts 2, 5, 11, 107, 113, 114, 117, 125, 159, 162, 175, and 180