47 CFR 25.132 - Verification of earth station antenna performance standards.

Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 25.132 Verification of earth station antenna performance standards.

(a)

(1) Except for applications for 20/30 GHz earth stations and applications subject to the requirement in paragraph (b)(3) of this section, applications for transmitting earth stations in the Fixed-Satellite Service, including feeder-link stations, must include certification that the applicant has reviewed the results of a series of radiation pattern tests performed by the antenna manufacturer on representative equipment in representative configurations, and the test results demonstrate that the equipment meets the off-axis gain standards in § 25.209, measured in accordance with paragraph (b)(1) of this section. The licensee must be prepared to submit the radiation pattern measurements to the Commission on request.

(2) Applications for transmitting GSO FSS earth stations operating in the 20/30 GHz band must include the antenna measurements specified in § 25.138(d) and (e). Applications for transmitting NGSO FSS earth stations operating in the 20/30 GHz band must include the antenna measurements specified in § 25.138(d).

(b)

(1) For purposes of paragraph (a)(1) of this section, the following measurements on a production antenna performed on calibrated antenna range, as a minimum, must be made at the bottom, middle and top of each allocated frequency band:

(i) Co-polarized patterns in the E- and H-planes for linear-polarized antennas or in two orthogonal cuts for circularly-polarized antennas:

(A) In the azimuth plane, plus and minus 7 degrees and plus and minus 180 degrees from beam peak.

(B) In the elevation plane, 0 to 45 degrees from beam peak.

(ii) Cross-polarization patterns in the E- and H-planes for linear-polarized antennas or in two orthogonal cuts for circularly-polarized antennas, plus and minus 9 degrees from beam peak.

(iii) Main beam gain.

(2) The FCC envelope specified in § 25.209 shall be superimposed on each pattern. The minimum tests specified above are recognized as representative of the performance of the antenna in most planes although some increase in sidelobe levels should be expected in the spar planes and orthogonal spar planes.

(3) Except as provided in paragraph (d) of this section, applicants seeking authority to operate a Fixed-Satellite Service earth station pursuant to the requirements in § 25.218, § 25.220, § 25.221, § 25.222, § 25.223, § 25.226, or § 25.227 must submit a copy of the manufacturer's range test plots of the antenna gain patterns specified in paragraph (b)(1) of this section.

(c) The tests specified in paragraph (b) of this section are normally performed at the manufacturer's facility; but for those antennas that are very large and only assembled on-site, on-site measurements may be used for product qualification data. If on-site data is to be used for qualification, the test frequencies and number of patterns should follow, where possible, the recommendations in paragraph (b) of this section, and the test data is to be submitted in the same manner as described in paragraph (a) of this section.

(d) For each new or modified transmitting antenna over 3 meters in diameter, except antennas subject to measurement under § 25.138(d), the following on-site verification measurements must be completed at one frequency on an available transponder in each frequency band of interest and submitted to the Commission.

(1) Co-polarized patterns in the elevation plane, plus and minus 7 degrees, in the transmit band.

(2) Co-polarized patterns in the azimuth and elevation planes, plus and minus 7 degrees, in the receive band.

(3) System cross-polarization discrimination on-axis. The FCC envelope specified in § 25.209 shall be superimposed on each pattern. The transmit patterns are to be measured with the aid of a co-operating earth station in coordination with the satellite system control center under the provisions of § 25.272.

(e) Certification that the tests required by paragraph (c) of this section have been satisfactorily performed shall be provided to the Commission in notification that construction of the facilities has been completed as required by § 25.133.

(f) Antennas less than 3 meters in diameter and antennas on simple (manual) drive mounts that are operated at a fixed site are exempt from the requirements of paragraphs (c) and (d) of this section provided that a detailed technical showing is made that confirms proper installation, pointing procedures, and polarization alignment and manufacturing quality control. These showing must also include a plan for periodic testing and field installation procedures and precautions.

(g) Records of the results of the tests required by this section must be maintained at the antenna site or the earth station operator's control center and be available for inspection.

[58 FR 13419, Mar. 11, 1993, as amended at 69 FR 5710, Feb. 6, 2004; 70 FR 32253, June 2, 2005; 72 FR 50028, Aug. 29, 2007; 74 FR 47102, Sept. 15, 2009; 74 FR 57098, Nov. 4, 2009; 78 FR 14926, Mar. 8, 2013; 79 FR 8318, Feb. 12, 2014]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 47 published on 2015-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR Part 25 after this date.

  • 2015-11-06; vol. 80 # 215 - Friday, November 6, 2015
    1. 80 FR 68815 - Review of Foreign Ownership Policies for Broadcast, Common Carrier and Aeronautical Radio Licensees
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Proposed rule.
      Submit comments on or before December 21, 2015, and replies on or before January 20, 2016. The NPRM contains potential information collection requirements subject to the PRA, Public Law 104-13. OMB, the general public, and other Federal agencies are invited to comment on the potential new and modified information collection requirements contained in this NPRM. If the information collection requirements are adopted, the Commission will submit the appropriate documents to OMB for review under Section 3507(d) of the PRA. OMB, the general public, and other Federal agencies will again be invited to comment on the new and modified information collection requirements adopted by the Commission.
      47 CFR Parts 1, 25, 73, and 74