49 CFR Subpart L - Subpart L—Operations
- § 192.601 Scope.
- § 192.603 General provisions.
- § 192.605 Procedural manual for operations, maintenance, and emergencies.
- § 192.607 Verification of Pipeline Material Properties and Attributes: Onshore steel transmission pipelines.
- § 192.609 Change in class location: Required study.
- § 192.610 Change in class location: Change in valve spacing.
- § 192.611 Change in class location: Confirmation or revision of maximum allowable operating pressure.
- § 192.612 Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets.
- § 192.613 Continuing surveillance.
- § 192.614 Damage prevention program.
- § 192.615 Emergency plans.
- § 192.616 Public awareness.
- § 192.617 Investigation of failures and incidents.
- § 192.619 Maximum allowable operating pressure: Steel or plastic pipelines.
- § 192.620 Alternative maximum allowable operating pressure for certain steel pipelines.
- § 192.621 Maximum allowable operating pressure: High-pressure distribution systems.
- § 192.623 Maximum and minimum allowable operating pressure; Low-pressure distribution systems.
- § 192.624 Maximum allowable operating pressure reconfirmation: Onshore steel transmission pipelines.
- § 192.625 Odorization of gas.
- § 192.627 Tapping pipelines under pressure.
- § 192.629 Purging of pipelines.
- § 192.631 Control room management.
- § 192.632 Engineering Critical Assessment for Maximum Allowable Operating Pressure Reconfirmation: Onshore steel transmission pipelines.
- § 192.634 Transmission lines: Onshore valve shut-off for rupture mitigation.
- § 192.635 Notification of potential rupture.
- § 192.636 Transmission lines: Response to a rupture; capabilities of rupture-mitigation valves (RMVs) or alternative equivalent technologies.