3 AAC 52.495 - Electric service reliability rules
(a) To the extent
necessary to calculate and report reliability indices as required under
3
AAC 52.490 - 3 AAC 52.495, an electric utility shall
comply with IEEE Standard 1366, IEEE Guide for Electric Power Distribution
Reliability Indices, revised as of May 14, 2012 (IEEE 1366-2012) and adopted by
reference. If there is a conflict between any provision in IEEE Standard 1366
and 3 AAC 52.490 - 3 AAC 52.495, the
provisions of
3
AAC 52.490 - 3 AAC 52.495 govern.
(b) An electric utility shall include both
"distribution system" outages and "interruptions caused by events outside of
the distribution system" as defined in IEEE Standard 1366 in the electric
utility's record keeping, calculations, reporting, and filing as required under
3
AAC 52.490.
(c) Except as provided in (d) of this
section, an electric utility shall keep an accurate record of each outage that
affects one or more customers. Each record must contain at least
(1) the date and time the outage occurred; if
the exact time is unknown, the beginning of an outage is recorded as the
earlier of an automatic alarm or the reported initiation time;
(2) the date and time service was
restored;
(3) the number of
customers affected by the outage; and
(4) the cause of the outage, if
known.
(d) For outages
after which an electric utility cannot obtain accurate data, the electric
utility shall make reasonable estimates.
(e) An electric utility shall retain for at
least five full calendar years the records associated with (c) of this
section.
(f) Using records
collected under (c) and (d) of this section, after December 31 of each year an
electric utility shall calculate the system average interruption duration index
(SAIDI), system average interruption frequency index (SAIFI), and customer
average interruption duration index (CAIDI) for the previous reporting period.
These indices are to be calculated for
(1)
the certificated service area; and
(2) each reliability reporting
area.
(g) When accurate
data is not available, an electric utility may use estimates in calculating
actual SAIDI, SAIFI, or CAIDI indices required under (f) of this
section.
Notes
Authority: AS 42.05.141
AS 42.05.151
AS 42.05.291
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.