Ariz. Admin. Code § R14-2-2605 - Utility Rights and Responsibilities
A.
A Utility shall interconnect a Generating Facility to the Distribution System,
subject to the requirements of this Article and of the Utility's
Interconnection Manual.
B. A
Utility has the right to expect prompt, reasonable, and professional responses
from a Customer during the Interconnection process.
C. A Utility shall require that an
interconnected Generating Facility:
1. Not
present any hazards to Utility personnel, other Utility consumers, or the
public;
2. Minimize the possibility
of damage to the Utility and to other Utility consumers' equipment;
3. Not adversely affect the quality of
service to other Utility consumers; and
4. Not hamper efforts to restore a feeder to
service when a Clearance is required.
D. A Utility shall notify a Customer if there
is reason to believe that operation of the Customer's Generating Facility has
caused disruption or deterioration of service to other Utility consumers served
from the Distribution System or that such operation has caused damage to the
Distribution System.
E. A Utility
shall make its Interconnection Manual, standard Application, and
Interconnection Agreements readily available to an Applicant in print and
online formats.
F. Following the
receipt of an Application, a Utility shall review the Generating Facility to
ensure it complies with the applicable screens in R14-2-2615 . If the Generating
Facility design does not comply with the applicable screens in R-14-2-2615, an
Interconnection Study may be required. Before the Utility undertakes any
Interconnection Study or system upgrades that will be charged to the Applicant,
the Utility shall provide the Applicant a detailed estimate of the cost, an
outline of the proposed work, supporting data, and justification for the
proposed work. If the results of an Interconnection Study necessitate
additional Interconnection Facilities or upgrades, the Utility shall provide
written notice to the Applicant of the Utility's intent to install the
Interconnection Facilities or upgrades. The Applicant shall pay the Utility for
Interconnection Facilities or upgrades identified in the Interconnection Study
except for those unrelated to the Generating Facility installation. The Utility
shall provide the results of the Interconnection Study to the
Applicant.
G. A Utility may not
disapprove Interconnection of a Generating Facility that satisfies the
requirements of this Article and the Utility's Interconnection
Manual.
H. If additional
Interconnection Facilities or upgrades are needed to accommodate a Generating
Facility, and the Interconnection Facilities or upgrades will benefit the grid,
the Utility shall reduce the charge of the Interconnection Facilities or
upgrades to the Customer by the amount of benefits to the grid that are readily
quantifiable by the Utility. A Utility shall not reject an Application on the
basis of existing Distribution System conditions that are deficient, or charge
a Customer for Interconnection Facilities or upgrades that are overdue or that
will soon be required to ensure compliance with Good Utility
Practice.
I. A Utility shall
process each Application on a nondiscriminatory basis.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.