Article 26 - INTERCONNECTION OF DISTRIBUTED GENERATION FACILITIES
- § R14-2-2601 - Definitions
- § R14-2-2602 - Applicability
- § R14-2-2603 - Types of Generating Facilities
- § R14-2-2604 - Customer Rights and Responsibilities
- § R14-2-2605 - Utility Rights and Responsibilities
- § R14-2-2606 - Easements and Rights-of-Way
- § R14-2-2607 - Insurance
- § R14-2-2608 - Non-Circumvention
- § R14-2-2609 - Designation of Contact Persons
- § R14-2-2610 - Minor Modifications
- § R14-2-2611 - Certification
- § R14-2-2612 - No Additional Requirements
- § R14-2-2613 - Disconnection from or Reconnection with the Distribution System
- § R14-2-2614 - Application and Generating Facility General Requirements
- § R14-2-2615 - Screens
- § R14-2-2616 - Pre-Application Report
- § R14-2-2617 - Level 1 Super Fast Track
- § R14-2-2618 - Level 2 Fast Track
- § R14-2-2619 - Level 3 Study Track
- § R14-2-2620 - Supplemental Review
- § R14-2-2621 - Utility Site Inspection; Approval for Parallel Operation
- § R14-2-2622 - Interconnection to a Secondary Spot Network System
- § R14-2-2623 - Expedited Interconnection Process
- § R14-2-2624 - Disconnect Switch Requirements
- § R14-2-2625 - Advanced Inverter Requirements
- § R14-2-2626 - Utility Reporting Requirements
- § R14-2-2627 - Electric Cooperatives
- § R14-2-2628 - Interconnection Manuals