Ariz. Admin. Code § R18-12-951 - General Requirements
A.
Implementation of requirements. Owners and operators shall comply with the
requirements of this Article for UST systems with field-constructed tanks and
airport hydrant systems as follows:
1. For
UST systems installed on or before January 1, 2020, the requirements are
effective according to the following schedule:
|
Requirement |
Effective Date |
|
Upgrading UST systems; general operating requirements; and operator training |
March 1, 2020 |
|
Release detection |
March 1, 2020 |
|
Release reporting, response, and investigation; closure; financial responsibility and notification (except as provided in subsection (B) of this Section) |
January 1, 2020 |
2.
For UST systems installed after January 1, 2020, the requirements apply at
installation.
B. All
owners of previously deferred UST systems shall submit a notification form
under R18-222 to the Department and shall demonstrate financial responsibility
at the time of submission of the notification form.
C. Except as provided in
R18-12-952, owners and operators
shall comply with the requirements of Articles 1 through 5 and 9 of this
Chapter.
D. In addition to the
codes of practice listed in
R18-12-281, owners and operators
may use military construction criteria, such as "Unified Facilities Criteria
(UFC) 3-460-01, Petroleum Fuel Facilities Design, With Change 2," revised
6/17/15, when designing, constructing, and installing airport hydrant systems
and UST systems.