Ariz. Admin. Code § R18-2-1404 - Frequency of Conformity Determinations
A. Conformity determinations and conformity
redeterminations for transportation plans, TIPs, and FHWA or FTA projects shall
be made according to the requirements of this Section and the applicable
implementation plan.
B. Each new
transportation plan shall be found to conform before the transportation plan is
approved by the MPO or accepted by USDOT.
C. All transportation plan revisions shall be
found to conform before the transportation plan revisions are approved by the
MPO or accepted by USDOT, unless the revision merely adds or deletes exempt
projects listed in
R18-2-1434 and has been made in
accordance with the notification provisions contained in
R18-2-1405 . The conformity
determination shall be based on the transportation plan and the revision taken
as a whole.
D. An existing
conformity determination shall lapse unless conformity of existing
transportation plans is redetermined:
1. By
May 25, 1995, unless previously redetermined consistent with 40 CFR 51, subpart
T.
2. Within 18 months after EPA
approval of an implementation plan revision which either:
a. Establishes or revises a
transportation-related emissions budget (as required by CAA §§
175A(a), 182(b)(1), 182(c)(2)(A), 182(c)(2)(B), 187(a)(7), 189(a)(1)(B), and
189(b)(1)(A); and §§ 192(a) and 192(b), for nitrogen dioxide);
or
b. Adds, deletes, or changes
TCMs.
3. Within 18
months after EPA promulgation of an implementation plan which establishes or
revises a transportation-related emissions budget or adds, deletes, or changes
TCMs.
E. In any case,
conformity determinations shall be made no less frequently than every three
years, or the existing conformity determination will lapse.
F. A new TIP shall be found to conform before
the TIP is approved by the MPO or accepted by USDOT.
G. A TIP amendment requires a new conformity
determination for the entire TIP before the amendment is approved by the MPO or
accepted by USDOT, unless the amendment merely adds or deletes exempt projects
listed in R18-2-1434 and has been made in
accordance with the notification procedures under
R18-2-1405.
H. After an MPO adopts a new or revised
transportation plan, TIP conformity shall be redetermined by the MPO and USDOT
within six months from the date of adoption of the plan, unless the new or
revised plan merely adds or deletes exempt projects listed in
R18-2-1434 . Otherwise, the
existing conformity determination for the TIP shall lapse.
I. In any case, TIP conformity determinations
shall be made no less frequently than every three years or the existing TIP
conformity determination shall lapse.
J. FHWA or FTA projects shall be found to
conform before they are adopted, accepted, approved, or funded. Conformity
shall be redetermined for any FHWA or FTA project if none of the following
major steps has occurred within the most recent three-year period:
1. NEPA process completion,
2. Start of final design,
3. Acquisition of a significant portion of
the right-of-way,
4. Approval of
the plans, specifications, and estimates.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.