(a)
General Provisions.
(1) All drilling for oil
and gas on State oil and gas leases shall be conducted in accordance with the
provisions of this Section
2128.
(2) Prior to the commencement of drilling
operations on any well, each well drilling proposal shall be approved by the
Staff.
(3) Prior to the
commencement of drilling operations on any well, the lessee shall obtain all
necessary permits and approvals required by all applicable laws and
regulations. The lessee shall file copies of those permits and approvals and
related documents with the State Lands Commission prior to the commencement of
drilling operations. The lessee shall abide by the terms of those permits and
approvals, including but not limited to, any required notifications prior to
the lessee's commencement of drilling operations.
(b) Field Drilling Rules. When sufficient
geological and engineering information has been compiled on a lease from
exploratory and initial development well drilling, the lessee may make
application to the Staff for the establishment of field drilling rules. After
the Staff has established field drilling rules, subsequent development well
drilling shall be drilled in accordance with these rules. Field drilling rules
may include but may not be limited to those relative to casing setting depths,
casing cementing requirements and blowout prevention equipment.
(c) Well Site Investigation. Prior to
commencing drilling operations on any well from a mobile drilling rig, the
lessee shall investigate the conditions of the ocean floor and near sub-bottom
including sediment characteristics in the area of the proposed well site. The
investigation shall be adequate to (1) ascertain the presence of shallow
geological anomalies and gather other information to be used as an aid in the
design of a safe well drilling and casing program, and (2) determine the
presence and location of significant cultural resources. A report of the
findings and provisions for mitigating any problems disclosed by the
investigation shall be provided to and must be approved by the Staff. Where a
number of wells are proposed to be drilled, the area of study may be expanded
to cover all the well sites. The plan(s) of investigation shall be in
accordance with guidelines provided by the Staff.
(d) Drilling Program. Prior to drilling a
well the lessee shall submit with the drilling proposal a detailed
well-drilling program to the State Lands Commission that shall include but may
not be limited to, the following information:
(1) Well location map; proposed well course;
detailed drilling procedures; casing and cementing program; blowout prevention
program; drilling mud program; directional survey program; electrical logging,
mud logging and sampling programs; and well testing procedures.
(A) In all exploratory well drilling
proposals, the lessee shall provide in the detailed drilling procedures a
description and depth of the possible drilling hazards that might be
encountered in drilling the well. The drilling hazards shall include, but may
not be limited to, possible unstable bottom sediments, shallow gas-charged
sediments, zones of lost circulation, oil and gas bearing zones, and abnormal
pressured zones.
(B) In drilling
operations using a mobile drilling rig, the lessee shall provide in the
detailed drilling procedures an operational program which describes procedures
and personnel assignments to be employed for rig and personnel safety while
drilling the hole for and running the surface casing string(s). The program
shall cover, but may not be limited to, requirements and procedures for testing
and use of the diverter system; establishment of safe penetration rates;
monitoring of mud returns for indication of gas and loss of circulation;
evaluation of drilling breaks; evaluation of severity of gas shows or kicks;
stand-by liquid mud and use in well control; emergency plugging of the well;
safeguards while removing the drilling riser for running and cementing the
casing string(s); precautionary measures for fire prevention; and, emergency
movement of drilling rig off location.
(2) Specifications and performance data of
drilling rig; critical operations and curtailment plan; oil spill contingency
plan, and hydrogen sulfide contingency plan.
(e) Well Casing Requirements.
(1) All wells shall be cased and cemented in
such a manner as to protect all zones that contain oil, gas, or fresh water, so
as to provide well control during drilling operations.
(2) The casing setting depths shall be based
upon all relevant geological and engineering factors, including the presence of
shallow geological anomalies, the presence or absence of hydrocarbons,
formation fracture gradients, formation pore pressures, water depth, and zones
of lost circulation or of other unusual characteristics. Casing setting depths
below the second surface casing shall be justified by calculations of the
competency of the preceding casing seat to withstand anticipated mud weights,
as well as the pressure generated by simulated well kicks from known or
potential gas bearing zones, taking into consideration actual or estimated
reservoir pressures, formation fracture gradients, minimum programmed mud
weights and anticipated kick volumes.
In situations where formation fracture gradients are not
known, a formation leak-off or predetermined equivalent mud weight test shall
be conducted to obtain estimated formation fracture gradients for use in the
calculations. These tests shall be conducted after drilling a maximum of 50
feet of new hole below the shoe of the second surface casing and intermediate
casing strings. Additional tests should be performed as the drilling progresses
in order to verify the competency of the formation to withstand anticipated
pressures, and to further refine casing setting depths. The results of all the
tests shall be recorded on the driller's log and reported to the Staff.
The known and estimated factors and calculations used to
determine the casing setting depths, as well as the casing design safety
factors and specifications shall be shown in the casing and cementing program
required in Section
2128(d)(1).
(3) The lessee shall utilize current
technological methods during drilling operations to aid in the prediction of
possible abnormal pressured zones in order to minimize the potential for the
development of a formation flow or kick.
(4) All casing shall be new pipe or the
equivalent and shall be inspected by the lessee in a manner approved by the
Staff. The inspection shall be sufficient to detect transverse and longitudinal
defects, to determine wall thickness, pipe eccentricity and grade uniformity,
and shall include a 100 percent thread check of the exposed threads. Casing
inspection reports shall be maintained by the lessee in its district office for
a period of five years, and shall be available to the Staff.
(5) Except in cases where casing requirements
have been established by field drilling rules or where geological and
engineering factors indicate that a different program should be used, the
following casing and setting-depth requirements shall be included in all well
casing programs. All depths refer to true vertical depth (TVD) below the ocean
floor or ground level unless otherwise specified. In order of normal
installation the casing strings are identified as conductor, first and second
surface, intermediate, and production casing.
(A) Conductor Casing (Referred to as drive or
structural casing in USGS Order No. 2). This casing shall be set by drilling,
driving, or jetting to a depth of approximately 100 feet below the ocean floor
or ground level in order to support unconsolidated sediments and thereby
provide hole stability for initial drilling operations. If drilled or jetted
in, the fluid circulated to the ocean floor shall be of a type that will not
pollute the ocean environment.
(B)
First Surface Casing (Referred to as conductor casing in USGS Order No. 2).
This casing shall be set at a depth between 300 feet and 500 feet below the
ocean floor; provided, however, that this casing shall be set before drilling
into shallow formations known to contain oil or gas or, if unknown, upon
encountering such formations.
(C)
Second Surface Casing (Referred to as surface casing in USGS Order No. 2). This
casing shall be set at a depth between 1,000 feet and 1,200 feet below the
ocean floor, but may be set as deep as 1,500 feet in the event the first
surface casing is set at least 450 feet below the ocean floor.
(D) Intermediate Casing. Intermediate casing
shall be set in accordance with the requirements of Section
2128(e)(2).
Notwithstanding these requirements, the Staff may specify the use and the
setting depth of the intermediate casing. Also, protective casing shall be set
at any depth below the second surface casing when required by well conditions
such as abnormal pressure, loss of circulation, hole problems, and for the
protection of productive zones while performing deeper drilling.
A blank liner may be used as intermediate casing provided
the existing casing string is of adequate strength for conducting deeper
drilling. The top of the liner shall overlap a minimum of 100 feet into the
next larger casing string. The lap shall be tested by a fluid entry or pressure
test to determine whether a seal between the liner top and next larger string
has been achieved. The test shall be recorded on the driller's log. If the test
indicates an improper seal, the top of the liner shall be squeezed with cement
and retested.
(E) Production
Casing. This casing shall be set before completing the well for production. A
blank or combination liner may be run and cemented as production casing
providing the existing casing string is of adequate strength for the safe
conduct of production operations. The overlap requirement and the testing of
the seal between the liner top and next larger casing string shall be conducted
as specified in Section
2128(e)(5) d for
intermediate liners. The surface casing shall not be used as production
casing.
(f)
Casing Cementing Requirements.
(1) The lessee
shall utilize appropriate cementing technology and casing equipment in order to
achieve adequate cement fillup and bonding on all casing cementing
operations.
(2) The conductor (if
drilled or jetted) and surface casing strings shall be cemented with sufficient
cement to fill the annular space back to the surface or ocean floor. Cement
fill shall be verified by the observation of cement returns. The cementing
operation may be considered adequate if cement is circulated to the surface or
ocean floor within the range of the calculated hole volume. In the event that
cement returns are not obtained or cement channeling occurs during cementing of
the surface casing strings, the lessee shall run a temperature and/or cement
bond survey and/or pressure test the casing shoe to evaluate the adequacy of
the cement job. If the casing string is thereby determined to be inadequately
cemented, the lessee shall recement the casing string or perform other
operations as approved by the Staff to ensure the competency of the cement
job.
(3) The intermediate casing
string(s) shall be cemented with sufficient cement to fill the annular space a
minimum of 200 feet into the preceding larger casing string. The protective and
production casing strings shall be cemented in a manner such that cement will
cover or isolate zones of unusually high or low pressure and zones containing
hydrocarbons. Sufficient cement shall be used to provide annular fillup at
least 500 feet above the zones to be covered or isolated or above the casing
shoe in cases where zonal coverage is not required. A cement bond survey shall
be run following primary cementing of the intermediate, protective, and
production casing strings to aid in determining whether each string is cemented
in accordance with this Section
2128(f)(3). If a
casing string is thereby determined not be adequately cemented, the lessee
shall recement the casing string as necessary to achieve annular fillup and
isolation of zones. If following a primary cementing operation, it has been
determined without the aid of a cement bond survey that remedial cementing is
necessary, the running of such survey may be deferred until after recementing.
The lessee shall verify the adequacy of the remedial cementing operations by
running a cement bond survey or by other methods approved by the
staff.
(4) A copy of each
temperature and cement bond survey shall be filed immediately with the
Staff.
(5) After cementing any of
the above casing strings, drilling shall not be commenced until after a time
lapse of:
(A) 24 hours; or
(B) Sufficient time for the cement to reach a
compressive strength of at least 500 pounds per square inch for the bottom 20
percent of the casing string. To determine the time that a minimum compressive
strength of 500 pounds per square inch has been attained, the operator shall
pretest the cement slurry at the projected hole temperature and pressure at the
cementing depth in accordance with API recommended
procedures.
(g)
Pressure Testing of Casing. Prior to drilling out the plug after cementing, all
casing strings except the conductor casing shall be pressure tested to at least
the minimum pressure shown in the table below. In the event that the cement is
under-displaced, the pressure test shall be conducted after drilling out cement
to at least the float collar depth. This test shall not exceed 70% of the
minimum internal yield pressure for the casing. If during the test, the
pressure declines more than 10 percent in 30 minutes, or if there is any
indication of a leak, corrective measures shall be taken so that a satisfactory
test is obtained.
| Casing
String |
Minimum Surface Pressure Test
(psi) |
| First
Surface.......................... |
..........................200 |
| Second
Surface.......................... |
..........................1,000 |
| Intermediate.......................... |
..........................1,500
or 0.2 psi/ft., whichever is greater |
| Protective.......................... |
..........................1,500
or 0.2 psi/ft., whichever is greater |
| Liner and Liner
Lap.......................... |
..........................1,500 or 0.2
psi/ft., whichever is greater |
| Production.......................... |
..........................1,500
or 0.2 psi/ft., whichever is greater |
All casing pressure tests shall be recorded on the
driller's log.
(h)
Directional Surveys. Each well shall be drilled in accordance with the approved
well course.
Except as otherwise provided in field drilling rules, all
wells drilled into the leased lands shall be directionally surveyed as drilling
progresses giving both inclination and azimuth measurements. Directional survey
shots shall be taken below the setting depth of the conductor casing string at
intervals not exceeding 250 feet during the normal course of drilling and at
intervals not exceeding 60 feet in angle changing portions of the hole. A
multishot directional survey shall be run at casing setting depths and/or at
total depth.
Results of directional and inclination survey shots shall
be reported promptly to the Staff. Copies of all composite and multishot
directional surveys shall be filed with the Staff.
(i) Blowout Prevention Equipment
Requirements. Blowout prevention equipment systems consist of several component
systems that function to operate the blowout preventers and to assist in well
control under varying rig and well conditions. These systems include the
blowout preventers, closing unit, kill and choke lines, choke manifold, fill-up
line, diverter, marine riser, and auxiliary equipment.
Blowout prevention equipment shall be installed, used,
maintained, and tested in a manner necessary to assure well control throughout
the drilling, completion or abandonment of a well.
All portions of a blowout prevention system shall be
designed so that alternate methods of well control are available in the event
of failure of any one portion of the system. If one component of the system
that is vital to well control becomes inoperative, drilling operations shall be
suspended as soon as possible without danger to the well until the inoperative
equipment is repaired or replaced.
Unless stated otherwise below, the following requirements
pertaining to blowout prevention equipment shall apply to both surface and
subsea equipment installations.
All blowout prevention systems shall include the
following:
(1) Blowout Preventers.
(A) There shall be a specified minimum number
of annular and ram-type preventers on each casing string as tabulated below. On
surface installations one preventer shall be a blind ram and on subsea
installations one preventer shall be a blind shear ram. Pipe rams shall be
provided to fit the pipe in use. Locking devices shall be provided on all
ram-type preventers. On subsea installations a remotely operated or automatic
locking system shall be required.
| 1. Surface Installations: |
|
| Conductor.......................... |
..........................1-Diverter
System |
| First
Surface.......................... |
..........................1-Annular |
|
|
1-Pipe Rams |
|
|
1-Blind Ram |
| Second
Surface.......................... |
..........................1-Annular |
|
|
2-Pipe Rams |
|
|
1-Blind Ram |
| Intermediate.......................... |
..........................1-Annular |
|
|
2-Pipe Rams |
|
|
1-Blind Ram |
| 2. Subsea Installations: |
|
| Conductor.......................... |
..........................1-Diverter
System |
| First
Surface.......................... |
..........................1-Annular |
|
|
1-Pipe Ram |
|
|
1-Blind Shear Ram |
| Second
Surface.......................... |
..........................2-Annular |
|
|
3-Pipe Rams |
|
|
1-Blind Shear Ram |
| Intermediate.......................... |
..........................2-Annular |
|
|
3-Pipe Rams |
|
|
1-Blind Shear Ram |
(B)
In floating drilling operations a bypass valve located on the bottom of the
riser may be employed to direct returns to the ocean floor when the formation
competency at the conductor setting depth is not adequate to permit circulation
of drilling fluids to the vessel.
(C) All blowout preventers and wellhead
assemblies shall have a working pressure exceeding the anticipated surface
pressure to which it may be subjected. The lessee shall submit in the blowout
prevention program required in Section
2128(d) (1) the
anticipated surface pressure of the well and its method of determination for
each casing string.
(D)
Notwithstanding the working pressure requirements determined in (1)b above, all
blowout preventers that are used while drilling the hole for surface or
intermediate casing shall have a minimum working pressure rating of 2000 psi
(2M), except for diverter systems or annular preventers used on the
conductor.
(2) Closing
Unit System. The closing unit system shall incorporate the following general
specifications:
(A) An accumulator unit
having a minimum usable hydraulic fluid operating volume, with pumps
inoperative, to close all blowout prevention units and still retain a 50
percent volumetric operating reserve at 1200 psi.
(B) A fluid reservoir with a capacity equal
to approximately twice the usable fluid capacity of the accumulator
system.
(C) The capability to close
each ram type preventer within 30 seconds. Closing time shall not exceed 30
seconds for annular preventers size 20 inches and smaller, and 45 seconds for
annular preventers larger than 20 inches.
(D) A dual pump system having a discharge
pressure equivalent to the rated working pressure of the closing unit. Each
pump system shall have an independent alternate source of power and be equipped
with automatic switches that activate the pumps when the closing unit manifold
pressure drops below 90 percent of the accumulator operating pressure. With the
accumulator system removed from service, each pump system shall be capable of
closing the annular preventer on the drill pipe being used, plus be capable of
opening the hydraulically operated choke line valve and of obtaining a minimum
of 200 psi pressure above accumulator precharge on the closing unit manifold
within two minutes or less.
(E)
There shall be one master control panel which contains a manifold capable of
operating and monitoring all of the functions of the closing unit system. All
of the controls and gauges in the panel shall be clearly marked and arranged in
the same sequence as the valves and the other equipment in the blowout
preventer stack which they control. In addition to the master control panel,
there shall be a second "remote" or 'mini" panel capable of operating all of
the functions of the closing unit system. One of the two panels shall be
located at the driller's station and the other at least 50 feet from the
centerline of the wellbore. Each of the two control panels shall be capable of
controlling the hydraulic manifold but the actual hydraulic manifold shall be
located away from the rig floor. The driller's control panel shall have a power
source independent of the accumulator pump system, or be designed so that in
the event of complete destruction of the panel, inter-connecting cable or hose,
there would be no interference with the operation of the accumulator pump
system.
(F) In addition to the
above requirements, closing unit systems for subsea blowout equipment
installations shall include the following:
1.
The blowout preventer stack shall be equipped with duplicate subsea control
pods, each of which shall contain all of the required pilot valves and
regulators necessary to operate all blowout preventer stack functions. The
control hose bundles may be hydraulic or electro-hydraulic. If hydraulic, the
pilot hoses contained within the bundle shall have a minimum internal diameter
of
3/16 inch and
the power hose shall have a minimum internal diameter of 1 inch. If
electro-hydraulic, the electric signal cables may be run integral with the
hydraulic power hose or may be run separately. The hose reels shall be so
designed that a minimum of four subsea hydraulic functions are operable while
running or pulling the blowout preventer stack.
2. The subsea blowout preventer stack shall
contain an accumulator volume sufficient to close one annular-type preventer
and to open the riser connection without recharge from the surface.
3. The Staff may require that the subsea
blowout preventer stack be equipped with an emergency shut-in system that on
signal from the surface, will shut in the well in the event the drill vessel
loses contact with the stack and the primary blowout prevention control system
is lost.
(3)
Kill and Choke Lines. The blowout preventer stack shall contain a drilling
spool or equivalent connections in the blowout preventer body to provide for
separate kill and choke lines. Each kill and choke line shall have a master
valve located next to the stack followed by a control valve. Both valves shall
be full-opening. The master valve shall not be used for normal opening or
closing on flowing fluids.
On surface installations, the control valve on the choke
line shall be remotely controllable. On subsea installations, the valves on
both the kill and choke lines shall be hydraulically operated. One of the
valves on each line shall be "fail-safe" in the closed position. The kill and
choke lines on the subsea installation shall be connected through the surface
choke manifold to permit pumping into the well through either line.
All connections for valves and fittings shall be flanged,
welded or clamped. All lines, including flexible lines, valves and flow
fittings shall have a working pressure rating at least equal to the rated
working pressure of the blowout preventer stack in use.
On surface installations the kill line, valves and fittings
shall have a minimum diameter of 2 inch nominal. The choke line, valves, and
fittings shall have a minimum diameter of 3 inch nominal. On subsea
installations both kill and choke line assemblies shall have a minimum diameter
of 3 inch nominal.
(4) Choke
Manifold. A choke manifold shall be installed on the drilling rig and be so
located that it is readily accessible to drilling personnel.
The choke manifold design shall consider such factors as
anticipated formation and surface pressures, method of well control to be
employed, surrounding environment, corrosivity, volume, toxicity, and
abrasiveness of fluids.
The portion of the manifold subject to well and/or pump
pressure shall have a working pressure equal to the rated working pressure of
the blowout preventer stack in use. All connections for valves and fittings
shall be flanged, welded or clamped.
The choke manifold shall be equipped with a minimum of two
adjustable chokes, one of which shall be remotely controlled. These chokes
shall be isolated by at least one valve on each side to allow for repairs or
replacement. All valves shall be full-opening. There shall be at least one
bleed line with a minimum diameter of 3 inch nominal. The lines downstream of
the chokes shall have a minimum diameter of 2 inch nominal. All lines shall be
securely anchored and connected in such a manner as to permit flow to a mud/gas
separator, vent lines, or to production facilities or emergency storage. Two
vent lines shall be provided if necessary to accomplish the downwind diversion.
The choke manifold shall be equipped with accurate pressure gauges so that all
control operations can be properly monitored.
The choke manifold for a subsea installation shall be
equipped with duplicate adjustable choke systems to permit control through
either the choke or kill line in addition to a remotely controlled adjustable
choke, and to provide tie-is for both drilling fluid and high pressure pump
systems.
A choke control station shall be provided that includes all
monitors necessary to furnish a complete overview of the well control
situation.
(5) Fill-up Line.
A fill-up line shall be installed on top of the blowout preventer stack on
surface installations and on top of the marine riser on subsea
installations.
(6) Diverter System.
A diverter system shall be installed on the well prior to drilling below the
conductor casing for the purpose of directing flowing formation fluids from the
well safely away from the rig and personnel.
Low-pressure annular preventers, rotating heads or special
diverters may be used for the diversion of well fluids. All such equipment
shall be able to pack-off around the kelly, drill string and casing if run
through the diverter. There shall be two diverter vent lines to permit
diversion of well fluids while minimizing back pressure on the well. All vent
lines shall be at least 6 inch nominal diameter unless otherwise justified by
engineering analysis. The two vent lines shall be installed in a manner to
accomplish downwind diversion. Valves on the vent lines shall be full-opening
and so designed that the proper valve automatically opens when the diverter is
activated or can be opened by remote control from the driller's control panel.
A description and diagram of the diverter system and information justifying the
sizing of vent lines shall be included in the blowout prevention program
required in Section
2128(d)(1).
(7) Marine Riser. The marine riser system and
its component parts that are employed in drilling operations from mobile
drilling rigs shall conform to the design, operation, inspection and
maintenance specifications set forth in Sections
6 B and 11 of the "API Recommended
Practices for Blowout Prevention Equipment Systems, API RP 53, First Edition,
February 1976, reissued February 1978," or subsequent revisions thereto that
are approved by the Staff.
(8)
Auxiliary Equipment.
(A) The following
auxiliary equipment shall be provided and maintained as operationally ready at
all times. Any equipment that may be subjected to well pressures shall have a
working pressure rating at least equal to the rated working pressure of the
blowout preventer stack in use.
1. A kelly
cock shall be installed below the swivel and a full-opening lower kelly valve
shall be installed below the kelly. The lower kelly valve shall have an outer
diameter such that it may be run through the blowout preventers and the last
casing string cemented in the well. A wrench to fit each valve shall be
maintained at a conspicuous location readily accessible to the drilling
crew.
2. A full-opening drill pipe
safety valve shall be available on the rig floor at all times and shall be
equipped to screw into any drill string member in use. This valve shall have an
outer diameter such that it may be run through the blowout preventers and the
last casing string cemented in the well.
3. An inside blowout preventer, drill pipe
float valve, or drop-in check valve shall be available on the rig floor at all
times for use in kick-control and stripping operations. The valve, sub, or
profile nipple shall be equipped to screw into any drill string member in
use.
4. A safety valve shall be
readily available on the rig floor and shall be equipped to screw into the
casing string that is being run into the well.
(B) A subsea test tree shall be used in the
blowout preventer stack while performing drill stem or production tests from
mobile drilling rigs.
(j) Pressure Testing, Operational Testing,
Inspection and Maintenance of Blowout Prevention Equipment.
(1) Pressure Testing of Blowout Prevention
Equipment.
(A) Ram-type blowout preventers and
related control equipment used in surface and subsea installations shall be
tested at the rated working pressure of the preventer stack, wellhead, or 70%
of the internal yield pressure of the casing, whichever is the lesser.
Annular-type preventers shall be tested at 70 percent of this pressure
requirement. Both types of preventers and related control equipment shall be
tested at low pressure, 200-300 psi. These tests shall be performed as follows:
1. When installed on the well.
2. After setting each casing
string.
3. Before drilling into any
known or suspected high pressure zone.
4. At least once a week while
drilling.
5. Following repairs or
replacement that necessitates breaking any pressure seal in the
system.
(B) In addition,
the subsea blowout prevention system shall be stump-tested on the drilling rig
to the applicable rated working pressure before the equipment is installed on
the well. The test record shall include the opening and closing times and the
hydraulic fluid volumes required for each function.
(C) Diverters shall be tested to their rated
working pressure when installed on the well.
(D) The blowout preventer equipment pressure
testing procedure shall be alternated between control panel stations and shall
be conducted at staggered intervals in order to allow each drilling crew to
perform the tests. On subsea installations alternate control pods may be used
on successive test periods.
(E) The
kelly cock, lower kelly valve, drill pipe safety valve, and inside blowout
preventer shall be tested at the same time and pressure as the ram-type blowout
preventers.
(F) The testing of all
blowout preventer equipment shall be properly recorded in the driller's
log.
(2) Operational
Testing of Blowout Prevention Equipment.
(A)
Ram-type and annular-type blowout preventers and diverters shall be actuated to
test for proper functioning on each round trip of the drill pipe, but not more
than once every 24 hours during normal drilling operations. Each choke manifold
valve and choke, subsea kill and choke line valve, kelly cock, lower kelly
valve, and drill pipe safety valve shall be operated daily.
(B) During the operational tests the choke
manifold and subsea kill and choke line valves shall be flushed with water to
ensure that plugging does not occur. The diverter and vent lines shall be
checked daily for plugging as a result of drill cuttings or other
debris.
(C) The actuation of
preventers and other remotely controlled equipment shall be alternated between
control panel stations and shall be conducted at staggered intervals to allow
each drilling crew to operate the equipment. On subsea installations alternate
control pods may be used on successive operational tests.
(D) A closing unit pump capability test, and
accumulator precharge-pressure and closing tests shall be conducted before
testing the blowout preventer stack on a well. The tests shall be performed in
accordance with the requirements set forth in Section
5 A of the "API Recommended
Practices for Blowout Prevention Equipment Systems, API RP 53, First Edition,
February 1978," or subsequent revisions thereof that are approved by the
Staff.
(E) The emergency shut-in
system for the subsea blowout preventer stack described in Section
2128(i)(2) F3.
shall be tested when installed on a well and at least once every two weeks
thereafter. In the test, the emergency shut-in system shall activate at least
one blowout preventer function.
(F)
All operational tests shall be properly recorded in the driller's
log.
(3) Inspection and
Maintenance of Blowout Prevention Equipment. All blowout prevention equipment
systems shall be inspected and maintained in accordance with the manufacturer's
recommended procedures. All systems shall be visually inspected at least once
each day. Subsea blowout preventer and riser systems may be inspected by use of
divers or television equipment. Any necessary equipment repair or replacement
shall be accomplished without delay; however, full consideration shall be given
to well safety before starting any work.
(k) Supervision and Training.
(1) The lessee shall provide on-site company
supervision (company toolpusher) of drilling operations on a 24-hour basis. At
least one member of the drilling crew or the toolpusher shall maintain
rig-floor surveillance at all times, unless the well is secured with blowout
preventers, bridge plugs, or cement plugs.
(2) Except as provided below in Section
2128(k)(3), the
lessee and drilling contractor personnel engaged in drilling operations on
State oil and gas leases located on State tide and submerged lands shall be
trained and qualified in well-control equipment, operations and techniques in
accordance with the provisions of the USGS Outer Continental Shelf Standard
"Training and Qualifications of Personnel in Well-Control Equipment and
Techniques for Drilling on Offshore Locations," No. T 1 (GSS-OCS-T1), First
Edition, December 1977, and subsequent revisions thereto that are approved by
the Staff. Written certification shall be filed with the Staff on compliance
with this provision before commencing drilling operations.
(3) Additional requirements to be included in
subsection 3.6 of document GSS-OCS-T1 aforesaid are:
(A) A well control drill plan shall be
prepared by the lessee for each well drilling proposal and shall be submitted
for Staff approval along with the blowout prevention program that is required
in Section
2128(d)(1). The
plan shall also stipulate the total time allotted for the crew to complete each
type of operational drill.
(B) Well
control drills shall be held for each crew on a daily basis until each crew
demonstrates its ability to effect proper closure of the well within the time
established by the well control drill plan. Thereafter, the drills may be held
on a weekly basis for each crew as set forth in subsection 3.6 of document
GSS-OCS-T1 aforesaid.
(l) Hydrogen Sulfide.
(1) When drilling operations are planned
which will penetrate reservoirs known or expected to contain hydrogen sulfide
(H2S), or in those areas where the presence of
H2S is unknown, or upon encountering
H2S, the preventive measures and the operating practices
set forth in U.S.G.S. Outer Continental Shelf Standard, "Safety Requirements
for Drilling Operations in a Hydrogen Sulfide Environment," No. 1 (GSS-OCS-1)
Second Edition, June 1979, or subsequent revisions thereto that are approved by
the Staff, shall be followed.
(2)
The lessee shall submit to the Staff for its approval, a hydrogen sulfide
contingency plan for each well proposal as required in Section
2128(d)(2).
(m) Mud Program. The characteristics, use,
and testing of drilling mud properties, and the related procedures to be
followed during drilling operations, shall be designed so as to prevent loss of
well control. Adequate quantities of mud materials shall be maintained at the
drill-site and shall be readily accessible for use in well control.
(1) Mud Control
(A) Before starting out of the hole with the
drill pipe, the mud shall be circulated with the drill pipe just off bottom,
until the mud is properly conditioned. Proper conditioning requires, at a
minimum, circulation to the extent that the annulus volume is displaced to
insure that the hole is clean and zonal pressures are being controlled by the
mud column. When pulling the drill pipe, the annulus shall be filled with mud
so that the mud level does not drop below a calculated depth of 100 feet. The
number of stands of drill pipe and drill collars that may be pulled before
stopping to fill the hole and their equivalent mud displacement volumes shall
be calculated and posted at the driller's station. A mechanical, volumetric, or
electronic device shall be utilized for accurate measurement of the amount of
mud used to fill the hole.
(B) A
degasser and mud/gas separator shall be employed on all wells unless not
required by field rules. This equipment shall be installed on the mud system
prior to commencement of drilling operations, and shall be maintained for use
throughout the drilling and completion of the well.
(2) Mud Quantities.
(A) The lessee shall include in the drilling
mud program a tabulation by well depths of the minimum quantities of mud
material to be maintained at the drill-site. The minimum quantities of mud
material required shall be at least equal to the capacity of the downhole and
active surface mud system. Sufficient weight material shall be maintained in
order to condition the reserve mud to the maximum density programmed.
(B) A daily inventory of the mud materials
shall be recorded and maintained at the drill-site. Drilling operations shall
be suspended whenever the required minimum quantities of mud materials are not
maintained at the drill-site.
(3) Mud-Testing Equipment.
(A) Mud-testing equipment shall be maintained
on the drilling rig at all times, and mud tests that are consistent with good
operating practice shall be performed at least once each 8-hour period while
drilling, or more frequently if conditions warrant.
Continuous mud-logging equipment shall be employed on all
exploratory drilling.
(B)
The following mud-system monitoring equipment shall be installed (with
indicators located at the driller's station) and used throughout the period of
drilling, after setting and cementing the conductor casing:
1. Recording mud pit level indicator (volume
totalizing type) to determine mud pit volume gains and losses. This indicator
shall include a visual audio warning device.
2. Mud-volume measuring device for accurately
determining mud volumes that are required to fill the hole on trips.
3. Mud-return or full-hole indicator to
determine when returns have been obtained, when returns occur unintentionally,
and to determine that returns are approximately equal to the pump discharge
rate.
4. Gas-detection equipment to
monitor the drilling mud returns.
(n) Drilling Practices.
(1) The volume of mud required to fill the
hole shall be carefully observed, and if at any time there is an indication of
swabbing or influx of formation fluids, the necessary safety device(s) shall be
installed on the drill pipe. The drill pipe shall be run to bottom and the mud
properly conditioned to stabilize the well. The mud shall not be circulated and
conditioned except on or near bottom, unless well conditions prevent the
running of pipe to bottom.
(2) The
lessee shall post at the driller's station, for each casing string, the maximum
pressure that is allowed to build up against the blowout preventers before
controlling the pressure by bleeding through the choke.
(3) The rate of pulling or running drill pipe
shall be controlled to ensure that the hole is not being swabbed or that
formations exposed to the well bore will not be broken down. Special
precautions shall be observed to prevent swabbing when full-hole tools are
employed.
(4) All formation fluid
that is produced during drlllstem testing shall be directed to the producing or
test facilities, and that remaining in the drill string after drillstem testing
shall be reverse-circulated from the drill pipe. The mud shall be adequately
conditioned prior to pulling the drillstem test tools.
(o) Drilling Inspection. Staff may perform
inspections of drilling operations on each rig to verify that the operations
are being conducted in accordance with these regulations and the approved
well-drilling program.
(p)
Redrilling and Deepening. Drilling operations to redrill or deepen a well shall
be conducted in accordance with the foregoing drilling regulations and the
additional regulations listed below.
(1) A
well shall not be redrilled or deepened unless it is determined that the casing
exposed in the well will provide adequate strength for the proposed drilling
and for subsequent production operations. Where well conditions permit, a
casing inspection survey, indicating remaining wall thickness and internal
diameter, shall be run to determine the condition of the casing and whether or
not it is of adequate strength.
(2)
If it is not possible to run a casing inspection survey, the casing shall be
pressure tested to at 70% of minimum internal yield pressure or 1.25 times the
anticipated surface pressure that it might be subjected to either during the
drilling operations or subsequent production operations (including injection),
or to the amount stipulated in Section
2128(g), whichever
is greater.
(3) If the casing
inspection survey indicates that the casing strength is adequate, then the
casing also shall be pressure tested as stipulated above in Section
2128(p)(2).
(4) In the event it is determined that the
condition of the casing is inadequate, drilling shall not be initiated until
corrective measures approved by the Staff are taken by the lessee. This shall
include testing of the casing to the maximum pressure stipulated above in
Section
2128(p)(2).
(5) A copy of the casing inspection survey
shall be filed immediately with the Staff.
(6) Prior to redrilling or deepening a well
the lessee shall demonstrate to the Staff that the casing is adequately
cemented above the point of new drilling. In the event it is thereby determined
that the casing is not adequately cemented, the lessee shall properly recement
the casing. The lessee shall verify the adequacy of the remedial cementing
operations by running a cement bond survey or by other methods approved by the
Staff.
(7) Prior to redrilling a
well, all oil, gas and water zones exposed in the well below the kickoff depth
shall be properly abandoned in accordance with the plugging and abandonment
regulations in Section
2128(q).
(8) If a well is to be redrilled or deepened
to a zone(s) having a pressure significantly higher or lower than that of the
shallower producing zone(s), which drilling might cause lost circulation and
thereby endanger the well, the shallower producing zones shall be squeeze
cemented or cased and cemented, prior to penetrating the lower
zone(s).
(q) Plugging and
Abandonment of Wells. Before any work is commenced to abandon any well, the
lessee shall file with the Staff a written notice of intention to abandon the
well. The notice shall show the condition of the well and proposed method of
abandonment. Written approval shall be obtained from the Staff prior to
commencement of abandonment operations.
In the case of a newly drilled dry hole or where other
approved operations on a well are in progress, the lessee may commence plugging
operations by securing oral approval from the Staff as to the abandonment
procedure and the time that plugging operations are to begin. Prior to
requesting oral approval, the lessee shall furnish the Staff a description of
the mechanical condition of the well, an electric log, a description of all oil
and gas shows and tests, and any other well data necessary for review of the
abandonment procedure. The lessee shall immediately file a written notice with
the Staff of its intention to abandon the well in confirmation of the approved
abandonment procedure.
The lessee shall plug and abandon all wells in accordance
with the following minimum requirements:
(1) Permanent Abandonment.
(A) Isolation of Zones in Open Hole. In open
hole portion of the well, cement plugs shall be spaced to extend from 100 feet
below to 100 feet above each oil or gas bearing zone or zone that is productive
of hydrocarbons elsewhere in a field, and a cement plug at least 200 feet long
shall be placed across the intrazone freshwater-saltwater interface, so as to
isolate fluids in the strata in which they are found and to prevent them from
migrating into other strata.
(B)
Isolation of Open Hole from Casing. Where there is open hole below the casing,
a cement plug shall be placed in the deepest casing string by 1. or 2. below,
or, in the event lost circulation conditions exist or are anticipated, the plug
may be placed in accordance with 3. below:
1.
A cement plug placed by displacement method so as to extend from 100 feet below
to 100 feet above the casing shoe.
2. A cement retainer with effective
back-pressure control set not less than 50 feet, nor more than 100 feet, above
the casing shoe with a cement plug calculated to extend from 100 feet below the
casing shoe to 50 feet above the retainer.
3. A permanent type bridge plug set within
150 feet above the casing shoe with 50 feet of cement placed on top of the
bridge plug. This plug shall be tested prior to placing subsequent
plugs.
(C) Plugging or
Isolating Perforated Intervals. A cement plug shall be placed opposite all open
perforations not previously squeezed with cement. This plug shall extend from
100 feet below to 100 feet above the perforated interval.
(D) Isolation of Zones Behind Uncemented
Casing. All oil, gas or fresh water-bearing zones located behind casing in the
uncemented portion of the hole shall be squeeze cemented so as to isolate
fluids in the strata in which they occur.
(E) Isolating Zones Behind Cemented Casing.
Inside cemented casing, a 100 foot cement plug shall be placed above each oil
or gas zone and above the shoe of the intermediate or second surface casing. A
cement plug at least 200 feet long also shall be placed across the intrazone
freshwater-saltwater interface.
(F)
Junk in Hole or Collapsed Casing. In the event that junk cannot be removed from
the hole and the hole below the junk is not properly plugged, cement plugs
shall be placed as follows:
1. Sufficient
cement shall be squeezed through the junk to isolate the lower oil, gas, or
fresh water zones and 100 feet of cement placed on top of the junk.
2. If the top of the junk is opposite
uncemented casing, the casing annulus immediately above the junk shall be
cemented with sufficient cement to insure isolation of the lower
zones.
(G) Plugging of
Casing Stubs. If casing is cut and recovered, a cement plug shall be placed so
as to extend from 100 feet within the casing stub to 100 feet above the top of
the casing stub.
1. If the stub extends up
into the next larger casing string, then a retainer may be set 50 feet above
the top of the stub and cement placed 150 feet below and 50 feet above the
retainer. If the foregoing methods cannot be used, a bridge plug shall be set
50 feet above the top of the stub and capped with 50 feet of cement.
2. If the stub is below the next larger
string, plugging of the open hole interval above the stub shall be accomplished
in accordance with Section
2128(q)(1)(A),
and, in addition, a cement plug shall be placed so as to extend from 100 feet
below to 100 feet above the casing shoe that is exposed above the stub in
accordance with Section
2128(q)(1)(B).
(H) Plugging of Annular Space. No casing
annular space that extends to the ocean floor shall be left open to drilled
hole below. If this condition exists, 200 feet of the annulus immediately above
the shoe of the preceding casing string shall be plugged with cement. If an
uncemented inner casing string is cut and recovered to accomplish this
requirement, the casing stub shall be plugged in accordance with Section
2128(q)(1)(G).
(I) Surface Plug Requirement. A cement plug
of at least 100 feet, with the top of the plug not more than 150 feet or less
than 50 feet below the ocean floor, shall be placed in the well. Prior to the
placement of the surface plug all inside casing strings which are uncemented at
the surface plugging depth shall be cut and recovered. Casing cutting methods
shall be employed that will not damage the well casing so as to prevent reentry
of the well.
(J) Testing of Plugs.
The location and hardness of all cement plugs shall be tested by placement of
drill string weight (10,000 pounds minimum) on the plug, and by application of
pump circulation. A cement plug placed on top of a previously tested bridge
plug or retainer need not be tested.
(K) Mud. Each of the respective intervals of
the hole between the various plugs shall be filled with mud fluid of sufficient
density to exert hydrostatic pressure exceeding the greatest formation pressure
encountered while drilling such intervals.
(L) Clearance of Location. All casing and
conductor shall be severed and removed from not more than 5 feet below the
ocean floor, unless other plans are approved by the Staff. The ocean floor
shall be cleared of any other obstructions. A method shall be employed to sever
or cut the casing that will not damage the well casing so as to prevent reentry
of the well.
(M) Record of
Abandonment. All plugging and abandonment operations shall be recorded on the
driller's log.
(2)
Temporary Abandonment
(A) Any drilling well
which is to be temporarily abandoned shall be mudded and cemented as required
for permanent abandonment except that the requirements of Section
2128(q)(1), (E), (H), (I), and
(L) shall thereupon be deferred. When casing
extends above the ocean floor, a mechanical bridge plug (retrievable or
permanent) shall be set in the casing between 15 and 200 feet below the ocean
floor.
(B) The use of a bridge plug
to temporarily exclude an interval when recompleting a well is not permitted,
unless the Staff approves in advance adequate plans for its future recovery and
proper abandonment of the zone.
(r) Daily Drilling Reports. The lessee shall
provide daily telephone reports of drilling activities as required by the
Staff.
(s) Log and History of Well.
(1) The lessee shall keep a careful and
accurate log, core record, and history of the drilling of each well.
(2) The lessee shall provide field copies of
electric logs and other surveys as necessary for the Staff to expeditiously
approve subsequent well operations.
(3) Within 60 days following the completion,
abandonment, or the suspension of operations of any well, the lessee shall file
with the Staff copies of all logs, including electric logs, surveys, drilling
records, well histories, core records and related information as measured and
recorded for the wells drilled by the lessee into the leased
lands.