Fla. Admin. Code Ann. R. 62-600.705 - Collection/Transmission Systems
(1) An applicant
for a wastewater treatment facility permit shall provide a power outage
contingency plan with the submittal of the facility's application for a new
permit, permit renewal, or substantial permit revision. The power outage
contingency plan shall describe the general program and protocols to mitigate
the impacts of power outages on the facility's collection/transmission system
and pump stations, including any applicable mutual aid agreements. A copy of
the power outage contingency plan, including any updates or revisions, shall be
submitted with subsequent facility applications for permit renewal or
substantial permit revision.
(2)
Domestic wastewater facilities shall act to prevent sanitary sewer overflows
and underground pipe leaks for all collection/transmission systems under
control of the facility and shall meet the requirements in this section for
those systems.
(a) The facility permittee for
a wastewater treatment facility permit shall develop a pipe assessment, repair,
and replacement action plan, referred to hereafter in this sections as the
"collection system action plan" or "plan, " with at least a 5-year planning
horizon for all collection/transmission systems under the utility's control to
mitigate sanitary sewer overflows and underground pipe leaks to the extent
technically and economically feasible. The detail of the plan shall be
consistent with the complexity of the system based on the best professional
judgement of the individual signing the plan. Any portion of the plan requiring
"engineering, " as defined by Chapter 471, F.S., shall be certified by a
professional engineer registered in the State of Florida. An electronic summary
of the collection system action plan shall be submitted to the Department with
the facility permit application for any new permit, permit renewal, or
substantial permit revision. A copy of the plan or portions of the plan shall
be provided within 7 days of request by the Department. The collection system
action plan shall meet the following requirements:
1. The plan shall provide a deliberate,
proactive approach to evaluating or surveying the pipes, manholes, pump
stations, tanks, and other equipment for the collection/transmission systems
under the facility's control during the 5-year planning horizon period. This
shall be accomplished in an economically feasible manner. The collection system
action plan shall set goals for evaluating percentages of the
collection/transmission system annually through the use of one or more
investigative techniques such as camera inspections, smoke testing, data
analytics, flow isolation, focused electrode leak location, direct observation,
and sonar imaging, water chemistry, and solids analysis, or through use of flow
monitoring determine the amounts of infiltration, inflow, and leakages. The
plan shall set a minimum goal of performing basic evaluations for at least 25
percent of the collection/transmission system during the plan's five-year
planning horizon, unless the permittee demonstrates based on economic
feasibility, the age or performance of the collection/transmission system or
repairs, replacements, maintenance activities, and other upgrades conducted
therein that a lower percentage will achieve the requirements of subsection
62-600.410(6),
F.A.C., and the goals for infiltration, inflow, and leakages shall be below the
amounts considered excessive under Rule
62-604.500, F.A.C.
2. The plan shall be based on inflow and
infiltration studies and leakage surveys conducted by the facility permittee or
designee. When the initial inflow and infiltration studies and leakage surveys
indicate that inflow, infiltration, or leakage is excessive, then the plan
shall also be based on any follow-up sanitary sewer evaluation surveys. The
facility permittee may propose an alternative metric to these requirements
which the Department shall accept upon a demonstration by the facility
permittee that the alternative metric is at least as effective in
characterizing the collection/transmission system and determining the actions
needed to prevent sanitary sewer overflows.
3. The plan shall provide contact information
for the facility and utility of those responsible for implementing the
collection system action plan.
4.
The plan shall include a map and inventory of the collection/transmission
system. The plan for facilities with a permitted capacity of 1 million gallons
per day (mgd) or greater shall incorporate the use of a computerized geographic
information systems (GIS) map and an electronic maintenance management system
or other electronic inventory of the collection/transmission systems under
control of the facility, which shall include the following information to the
extent technically and economically practicable:
a. For each section of pipe, manholes, and
pump stations, a component identification tracking number, the location, length
of portion, size and diameter, type of pipe or construction, age, inspection
information, and maintenance information.
b. Any climatic and geologic data determined
necessary by the facility permittee to help identify appropriate maintenance
and repair actions, such as geologic and topographic information; hydrologic
information including seasonal high water table information prepared by the
facility permittee, United States Geological Survey or other governmental
entity; regional rainfall data collected by the facility permittee or other
governmental entity; and groundwater quality monitoring associated with the
collection/transmission system, if conducted.
c. Information regarding any
collection/transmission system flows, overflows, bypasses, verified odor
complaints, corrosion data, past inflow and infiltration analysis results, past
leakage surveys, population served, and industries served.
5. The plan shall include adaptive
maintenance and repair plans including general facility program and protocols
regarding routine maintenance, cleaning activities, and protocol for emergency
repairs.
6. The plan shall address
record keeping for all items in the collection system action plan.
7. The plan shall describe measures taken, if
any, for limiting the presence of fats, oils, grease, wet wipes, sand, and grit
to the collection/transmission system, as well as a root control
program.
8. The plan shall describe
measures taken, if any, such as any sewer ordinances or any programs
established by the applicable county or municipality in accordance with
sections 125.569 and
166.0481, F.S., to minimize
inflow and infiltration from individual service connections or sanitary sewer
laterals, including for single-family residences, to the extent addressing such
inflow and infiltration is determined necessary to prevent sanitary sewer
overflows and redressable within the authority of the facility
permittee.
9. The plan shall
identify, by no later than the first new permit, permit renewal, or substantial
permit revision application after December 21, 2025, all satellite collection
systems connected to the facility collection system including the name of each
satellite collection system, the ownership type of each identified satellite
collection system, a unique identifier number for each satellite collection
system, whether the satellite collection system is under the control of the
facility, and population served by the satellite collection system, The plan
shall describe the measures taken, if any, to require or encourage
owners/operators of satellite collection systems to minimize inflow and
infiltration from their satellite collection systems that cause or contribute
to sanitary sewer overflows in the facility's collection system.
10. The plan shall describe the resiliency of
the collection/transmission systems that considers sea-level rise and the
planned or completed flood mitigation and stormwater control actions, if any,
by the facility permittee or governmental entities that the facility permittee
identified as reducing the potential for inflow and infiltration into the
facility permittee's collection/transmission system.
(b) The facility permittee shall submit an
annual report summarizing the collection system action plan implementation to
the Department no later than June 30 of the year following the close of the
fiscal year covered by the report. The report shall be submitted electronically
to the applicable district office or delegated local program. The annual report
shall address or include the following, at a minimum:
1. A summary of the collection/transmission
system-related assessments (e.g. evaluations, investigations, studies, and
surveys) conducted including the percentage of the collection/transmission
system assessed during the year and the cumulative percentage investigated to
date during the 5-year planning horizon of the collection system action plan;
the methods used for the assessments; the results of the assessments; and any
estimates of inflow, infiltration, and leakages.
2. Any repairs, replacements, maintenance
activities, expansions and other upgrades, which the facility permittee
identifies as significant, conducted during the year and planned for the
upcoming year based on the performance and identified needs of the
collection/transmission system.
3.
After December 21, 2025, the identification of any new satellite collection
systems added to the system including the name of each satellite collection
system, the ownership-type of each satellite collection system, a unique
identifier number for each satellite collection system, whether the satellite
system is under the control of the facility, and the estimated population
served by each satellite collection system..
4. Information regarding the annual
expenditures dedicated to the inflow and infiltration studies and the
collection system action plan; expenditures dedicated to pipe assessment,
repair, and replacement; and expenditures designed to limit the presence of
fats, oils, grease, roots, wet wipes, sand, and grit in the facility's
collection/transmission system.,
5.
Details of facility revenues and expenditures including any substantial
increase or decrease of annual expenditures from identified cost projections to
address system needs related to inflow and infiltration studies; model plans
for pipe assessment, repair, and replacement; and pipe assessment, repair, and
replacement required or identified by the collection system action
plan.
6. Additional activities and
information that the facility permittee identifies as relevant to the
prevention of sanitary sewer overflows and underground pipe leakages, such as
public education campaigns regarding the proper disposal of wet wipes, flood
mitigation measures, stormwater control projects, and other relevant actions
identified by the facility permittee.
(3) An applicant may use an alternative to a
requirement in subsection
62-600.705(2).
F.A.C., if the applicant:
(a) Demonstrates to
the Department that the proposed alternative assures at least the same level of
protection to the environment and public health; and,
(b) The alternative is submitted and approved
with an application for a new facility permit, permit renewal, or substantial
permit revision.
(4)
Facility permittees meeting the stated goals of their pipe assessment, repair,
and replacement action plans shall be eligible for ten year permits in
accordance with Section
403.087, F.S.
(5) Substantial compliance with subsection
62-600.705(2),
F.A.C., will be used as evidence in mitigation for the purposes of assessing
penalties under Department rules.
(6) Owners/operators of publicly owned
satellite collection systems with a flow of 100, 000 gallons per day (gpd) or
greater, or serving a population of 1000 or more, shall develop a collection
system action plan in accordance with Rule
62-600.705, F.A.C. The plan
shall be prepared no later than five years after (effective date of rule). The
owner/operator of the satellite collection system shall notify the Department
and the treatment facility which receives the satellite collection system's
flow when the plan has been prepared. This plan shall be reviewed annually by
the owner/operator of the satellite collection system and updated at least
every five years. The plan shall be made available for inspection within 7 days
of request by the Department.
Notes
Rulemaking Authority 403.051, 403.061, 403.086, 403.087, 403.088 FS. Law Implemented 403.021, 403.051, 403.061, 403.087, 403.088, 403.0881 FS.
Ratified by Ch. 2023-308, LOF.
New 6-28-23.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.