Fla. Admin. Code Ann. R. 62-761.800 - Out-of-Service and Closure Requirements
(1)
Out-of-service storage tank systems.
(a)
Storage tank systems that are taken out-of-service, as required in this
subsection, shall continue to be maintained in accordance with this chapter
unless otherwise noted herein.
(b)
Facility owners and operators of out-of-service storage tank systems shall:
1. Continue to operate and maintain corrosion
protection in accordance with subsection
62-761.700(2),
F.A.C.,
2. Continue to maintain and
demonstrate financial responsibility pursuant to Rule
62-761.420, F.A.C.,
3. Leave vent lines open and functioning,
4. Remove all regulated substances
so that no more than one inch in depth or 0.3 percent by weight of regulated
substances remains in the storage tank,
5. Secure or close off the system to outside
access,
6. Register the storage
tank system out-of-service in accordance with Rule
62-761.400, F.A.C.; and,
7. Perform a visual inspection
annually, not to exceed 12 months of every component of a storage tank system
that contains, transfers, or stores, or is designed to contain, transfer, or
store regulated substances, that can be visually inspected. Each annual visual
inspection of the storage tank system shall be documented as to its condition
pursuant to Rule 62-761.710, F.A.C., and will be
deemed timely if performed within the same calendar month in which the test is
due. Any visual inspection of a storage tank system that reveals uncontrolled
pitting corrosion, structural damage, leakage, or other similar problems is
considered a positive response. The positive response shall be recorded as part
of the release detection records and reported and investigated as an incident
pursuant to Rule 62-761.430, F.A.C. If it is
determined that a release has occurred while the system is out-of-service; and,
a. The incident investigation reveals a
release has led to a discharge while the storage tank system is out-of-service
and storing regulated substances at no more than one inch in depth or 0.3
percent by weight of total system capacity, then the response to the discharge
shall be in accordance with paragraphs
62-761.440(6)(a), (b), (e), (f), and
(g), F.A.C. Repairs shall be made within 365
days of the discharge discovery in accordance with paragraphs
62-761.700(1)(a), (c), and
(d), F.A.C. If the system cannot be repaired
within 365 days after the discovery of the discharge, then it shall be
permanently closed pursuant to subsection
62-761.800(2),
F.A.C.
b. The incident
investigation reveals a release has not led to a discharge while the storage
tank system is out-of-service, then repairs shall be made in accordance with
paragraphs 62-761.700(1)(a), (c), and
(d), F.A.C., prior to bringing the storage
tank system back into service.
(c) Facility owners and operators of
out-of-service storage tank systems shall monitor the interstice and the liquid
level in the storage tank annually but not to exceed 12 months, unless the tank
system contains no regulated substances. The annual test will be deemed timely
if performed within the same calendar month in which the test is due. Records
of these inspections shall be maintained in accordance with subsection
62-761.710(2),
F.A.C. In the event that liquid in excess of one inch, or 0.3 percent by
weight, in the storage tank or any liquid, other than condensate, in the
interstice is discovered, facility owners and operators must follow the
procedures for incidents pursuant to Rule
62-761.430, F.A.C.
(d) The following inspections and testing
requirements are not required while the storage tank system is properly
out-of-service:
1. Monthly visual inspections
in accordance with paragraph
62-761.600(1)(e),
F.A.C.,
2. Semiannual inspections
of piping and dispenser sumps that use electronic release detection methods in
accordance with paragraph
62-761.600(1)(e),
F.A.C.,
3. Monthly inspection of
electronic release detection devices in accordance with paragraph
62-761.600(1)(g),
F.A.C., and
4. Release detection
device annual operability testing, containment and interstitial integrity
testing, and annual overfill protection device testing; however, all
aforementioned testing shall be current in accordance with this chapter and
indicate proper operation before adding regulated substances to the storage
tank system. In addition, storage tank systems installed after January 11,
2017, that have been out-of-service for more than 730 days shall perform
interstitial integrity testing of the storage tank and integral piping before
adding regulated substances to the storage tank system.
(e) Storage tank systems with secondary
containment, not requiring repairs pursuant to Rule
62-761.700, F.A.C., shall only
be designated as out-of-service for a maximum of 10 continuous years. Upon
expiration of this time period, the storage tank system must be closed in
accordance with subsection
62-761.800(2)(b),
F.A.C.
(2) Closure of
storage tank systems.
(a) The following
storage tank systems must be closed in accordance with the provisions of this
subsection:
1. A storage tank system that
fails to meet or, if required, is not modified to meet the Storage Tank System
Requirements of Rule 62-761.500, F.A.C., within 90
days of discovery.
2. A storage
tank system that requires repair pursuant to Rule
62-761.700, F.A.C., but is not
repaired within 90 days to operate in accordance with the requirements of this
chapter shall be taken out-of-service. If the system is not repaired within 365
days after being taken out-of-service, it shall be permanently
closed.
3. A storage tank system
where financial responsibility is not maintained and demonstrated, pursuant to
Rule 62-761.420, F.A.C., within 90
days of termination of the financial mechanism.
(b) Closure of storage tank systems shall be
performed by:
1. Conducting a Closure
Integrity Evaluation as defined in subsection
62-761.200(10),
F.A.C., and completing the Closure Integrity Evaluation Report Form for USTs
62-761.900(7)
(Closure Integrity Report), incorporated by reference in paragraph
62-761.405(2)(c),
F.A.C. The form shall be submitted in writing or electronic format to the
appropriate county,
2. Removing all
liquids and accumulated sludges. The removal and disposal of all liquids and
accumulated sludges may be required according to other local, state, and
federal requirements,
3. Removing
by a Certified Contractor or disconnecting and capping all integral
piping,
4. Removing and disposing
of a storage tank by a Certified Contractor, or in-place closure by filling the
storage tank with a solid inert material of sufficient density to prevent a
structural collapse of the closed storage tank, shall be in accordance with the
following copyright protected documents, hereby adopted and incorporated by
reference, and available from the addresses provided, regardless of the date of
installation of the storage tank system: Closure of Underground
Petroleum Storage Tanks, API Recommended Practice 1604, 4th Edition,
February 2021, available for inspection at the Department of Environmental
Protection or the Department of State address provided in subsection
62-761.210(1),
F.A.C., or from the publisher at API, 1220 L Street, N.W. Washington, DC 20005,
(202)682-8000, or the publisher's website at http://www.api.org/; and Temporarily
Out of Service, Closure in Place, or Closure by Removal of Underground Storage
Tanks, NFPA 30 (Annex C), 2021 Edition, available at the Department of
Environmental Protection or the Department of State address provided in
subsection 62-761.210(1),
F.A.C., or from the publisher at NFPA, 1 Batterymarch Park, Quincy,
Massachusetts 02169-7471, (800)344-3555, or at the publisher's website at
www.nfpa.org/. In lieu of in-place closure
or removal, a storage tank may be used to store liquids other than regulated
substances in accordance with API Recommended Practice 1604, 4th Edition,
February 2021. Owners and operators are advised that other federal, state, or
local requirements apply that regulate these activities; and,
5. Properly closing monitoring wells
associated with closed systems that are not being used for site assessment
purposes.
6. Once a storage tank
system has been properly closed pursuant to subsections
62-761.800(2) and
(3), F.A.C., and the Closure Report or the
Limited Closure Report Form for USTs
62-761.900(8),
incorporated by reference in subsection
62-761.420(2),
F.A.C., has been submitted to and approved by the county or the Department, the
facility owner shall update the facility's registration status within 10 days
to indicate the storage tank system as closed in accordance with subsection
62-761.400(2),
F.A.C.
(3)
Closure Integrity Report, Closure Report, and Limited Closure Report
Requirements.
(a) Closure Integrity Report.
1. A Closure Integrity Evaluation, as defined
in subsection 62-761.200(10),
F.A.C., must be performed no more than 45 days prior to closure, replacement,
or change in service from a regulated substance to a non-regulated substance
for all double-walled storage tanks, double-walled integral piping, piping
sumps, dispenser sumps, and spill containment systems that are in contact with
the soil. A Closure Integrity Report must be completed to document the findings
of the Closure Integrity Evaluation.
2. A Closure Integrity Evaluation requires a
visual assessment of the interstitial space of double-walled tanks, integral
piping, piping sumps, dispenser sumps, and spill containment systems that are
in contact with the soil to determine if there are any products or pollutants
or any water other than condensate present within the interstice. For storage
tank system components where the interstitial space cannot be visually
inspected, other methods approved by the manufacturer, PEI RP 1200-17, or the
Department such as vacuum, pressure, or inert gases may be used instead of
visual observations.
3. A Closure
Integrity Evaluation for single-walled piping sumps, dispenser sumps, and spill
containment systems that are in contact with the soil requires a hydrostatic
test or another test approved by the manufacturer.
4. The county must be provided with a copy of
the Closure Integrity Report as part of the notification process pursuant to
subsection 62-761.405(2),
F.A.C.
5. A failed Closure
Integrity Evaluation requires the reporting of the failed evaluation as an
incident in accordance with subsection
62-761.405(3),
F.A.C., and the investigation of the incident in accordance with subsection
62-761.430, F.A.C. If sampling
is necessary to determine whether a discharge has occurred, then an
investigation shall be conducted during closure in accordance with
Instructions for Conducting Sampling During Underground Storage Tank
Closure, July 2019 Edition, hereby adopted and incorporated by
reference, and available at
http://www.flrules.org/Gateway/reference.asp?No=Ref-11121,
or the Department address given in paragraph
62-761.210(1)(e),
F.A.C., or the Department's website at
https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-system-rules-forms-and-reference,
regardless of the date of installation of the storage tank system or system
component being closed.
6. The
owner or operator who does not or elects not to conduct a Closure Integrity
Evaluation, in accordance with paragraph
62-761.800(3)(a),
F.A.C., before the storage tank system or system component has been removed or
closed in-place, regardless of the date of installation of the storage tank
system or system component, shall conduct an investigation at the time of
closure in accordance with Instructions for Conducting Sampling During
Underground Storage Tank Closure, July 2019
Edition.
(b) Closure
Report. In cases where an investigation is conducted at the time of closure in
accordance with Instructions for Conducting Sampling During Underground
Storage Tank Closure, July 2019 Edition, a Closure Report shall be
submitted in writing or electronic format to the County within 60 days of
completion of the system or system component closure, replacement, or change in
service from a regulated substance to a non-regulated substance. The Closure
Report shall be prepared in accordance with Instructions for Conducting
Sampling During Underground Storage Tank Closure, July 2019
Edition.
(c) Limited Closure
Report. Form 62-761.900(8),
Limited Closure Report Form for USTs shall be submitted in writing or
electronic format to the county within 60 days of completion of the closure,
replacement, or change in service from a regulated substance to a non-regulated
substance in cases where:
1. A Closure
Integrity Evaluation passed,
2. A
failed Closure Integrity Evaluation was investigated prior to closure and it
was demonstrated that a discharge did not occur, or
3. A Closure Integrity Evaluation or Closure
Report were not required because the closure only involved storage tank system
components that were not in contact with the
soil.
Notes
Rulemaking Authority 376.303 FS. Law Implemented 376.303, 376.30716 FS.
New 12-10-90, Formerly 17-761.800, Amended 9-30-96, 7-13-98, 6-21-04, 1-11-17, 10-13-19, 6-25-23.