Fla. Admin. Code Ann. R. 62-815.0105 - Modification to the Project Boundary
Modifications to the boundary of a project site selected for conceptual approval will be considered by the Governing Body on a case-by-case basis. The following procedures are established to guide the submission and review of boundary modification requests.
(1) A written request for boundary
modification must be submitted and contain the items listed below. The request
must be transmitted with an original signature cover letter on local government
letterhead, signed by the appropriate local government official or
administrator, binding the local government to fulfill the commitments made in
the request for boundary modification.
(a) An
explanation of how the proposed modification complies with the intent and
purpose of the project as stated in the original application;
(b) An explanation of why the requested
boundary change was not contained in the original application;
(c) An explanation of the effect on the
overall project if the requested modification is not approved; and,
(d) An addendum to the original application
form FCT/P2000 showing any additions and/or deletions resulting from the
proposed boundary modification to the information required by Rules 62-815.004
and 62-815.008,
F.A.C.
(2) Following
receipt of a request for boundary modification, Trust staff shall conduct a
preliminary review to determine if the information provided includes the
required items listed in paragraphs
62-815.0105(1)(a)
-(d), F.A.C. Trust staff will notify the local government key contact of any
additional information or clarification that is needed to complete the staff
review.
(3) Trust staff shall
prepare a written evaluation report for consideration and approval by the
governing body following the same review procedures used to evaluate the
original application. The report will contain the following:
(a) Whether the proposed boundary
modification is consistent with the purpose and intent of the original
application;
(b) Whether the
proposed boundary modification would facilitate the acquisition of the overall
project site;
(c) Whether the
proposed boundary modification would change the evaluation report score if it
had been part of the original application. If so, would the revised score and
rank result in any change in the funding status of the project;
(d) Whether the Trust has funds available to
cover the additional project costs and that the increase in the Trust grant
award would not exceed the award limit contained in subsection
62-815.0031(8),
F.A.C.
(4) A Trust staff
may conduct a site visit to verify representations made in the boundary
modification request before final approval of the boundary
change.