Fla. Admin. Code Ann. R. 62C-39.010 - Release Procedures
(1) Upon completion
of reclamation requirements in an area, the operator shall notify the
Department and provide a map which specifically delineates the completed area.
The notice shall be an executed copy of DEP Form 53-032(16), incorporated by
reference in Rule 62C-39.014, F.A.C.
(2) Within 60 days after receipt of the
notification, the Department shall notify the operator in writing as to whether
or not an inspection will be made. The Department's notification shall include
the date the inspection will occur if an inspection is scheduled.
(3) Within 30 days after the inspection, the
Department shall either release the completed area from further reclamation
requirements or give written notice to the operator of the deficiencies which
must be corrected before a release can be granted.
(4) If the Department notifies the operator
that the area will not be inspected, the area shall be released from
reclamation requirements at the end of the second year after receipt of the
operator's notification.
(5) If an
operator wishes to resume mining operations within a released area, the area to
be disturbed shall be considered to be an undisturbed area for the purposes of
this chapter and notification shall be made in accordance with the full
provisions of this chapter.
Notes
Rulemaking Authority 378.404 FS. Law Implemented 378.404 FS.
New 1-19-89, Formerly 16C-39.010.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.