Ga. Comp. R. & Regs. R. 391-3-24-.10 - Standards for Conducting Renovation Activities
(1) Renovator responsibilities. Certified
renovators are responsible for ensuring compliance with all renovations to
which they are assigned. A certified renovator:
(a) Must perform all of the tasks described
in this Rule and must either perform or direct workers who perform all of the
tasks described in this Rule.
(b)
Must provide training to workers on the work practices they will be using in
performing their assigned tasks.
(c) Must be physically present at the work
site when the signs required by this Rule are being posted, while the work area
containment required by this Rule is being established, and while the work area
cleaning required by this Rule is being performed.
(d) Must regularly direct work being
performed by other individuals to ensure that the work practices are being
followed, including maintaining the integrity of the containment barriers and
ensuring that dust or debris does not spread beyond the work area.
(e) Must be available, either on-site or by
telephone, at all times that renovations are being conducted.
(f) When requested by the party contracting
for renovation services, must use an acceptable test kit to determine whether
components to be affected by the renovation contain lead-based paint.
(g) Must have with them at the work site,
copies of their Division issued renovator certificate.
(h) Must prepare the records required by Rule
391-3-24-.11.
(2) Dust sampling technician
responsibilities. When performing optional dust clearance sampling, a certified
dust sampling technician:
(a) Must collect
dust samples in accordance with Rule
391-3-24-.06, must send the
collected samples to a laboratory recognized by EPA under TSCA section 405(b),
and must compare the results to the clearance levels in accordance with Rule
391-3-24-.07.
(b) Must have with them at the work site,
copies of their Division issued dust sampling technician certificate.
(3) Standards for renovation
activities. Renovations must be performed by certified renovation firms using
at least one (1) certified renovator while conducting renovations. The
responsibilities of certified firms and certified renovators are set forth in
Rule 391-3-24-.10.
(a) Occupant protection. Firms must post
signs clearly defining the work area and warning occupants and other persons
not involved in renovation activities to remain outside of the work area. To
the extent practicable, these signs must be in the primary language of the
occupants. These signs must be posted before beginning the renovation and must
remain in place and readable until the renovation and the post-renovation
cleaning verification has been completed. If warning signs have been posted in
accordance with Rule
391-3-24-.08 additional signs are
not required by this Section.
(b)
Containing the work area. Before beginning the renovation, the firm must
isolate the work area so that no dust or debris leaves the work area while the
renovation is being performed. In addition, the firm must maintain the
integrity of the containment by ensuring that any plastic or other impermeable
materials are not torn or displaced, and taking any other steps necessary to
ensure that no dust or debris leaves the work area while the renovation is
being performed. The firm must also ensure that containment is installed in
such a manner that it does not interfere with occupant and worker egress in an
emergency.
1. Interior renovations. The firm
must:
(i) Remove all objects from the work
area, including furniture, rugs, and window coverings, or cover them with
plastic sheeting or other impermeable material with all seams and edges taped
or otherwise sealed.
(ii) Close and
cover all ducts opening in the work area with taped-down plastic sheeting or
other impermeable material.
(iii)
Close windows and doors in the work area. Doors must be covered with plastic
sheeting or other impermeable material. Doors used as an entrance to the work
area must be covered with plastic sheeting or other impermeable material in a
manner that allows workers to pass through while confining dust and debris to
the work area.
(iv) Cover the floor
surface, including installed carpet, with taped-down plastic sheeting or other
impermeable material in the work area 6 feet beyond the perimeter of surfaces
undergoing renovation or a sufficient distance to contain the dust, whichever
is greater.
(v) Use precautions to
ensure that all personnel, tools, and other items, including the exteriors of
containers of waste, are free of dust and debris before leaving the work
area.
2. Exterior
renovations. The firm must:
(i) Close all
doors and windows within 20 feet of the renovation. On multi-story buildings,
close all doors and windows within 20 feet of the renovation on the same floor
as the renovation, and close all doors and windows on all floors below that are
the same horizontal distance from the renovation.
(ii) Ensure that doors within the work area
that will be used while the job is being performed are covered with plastic
sheeting or other impermeable material in a manner that allows workers to pass
through while confining dust and debris to the work area.
(iii) Cover the ground with plastic sheeting
or other disposable impermeable material extending 10 feet beyond the perimeter
of surfaces undergoing renovation or a sufficient distance to collect falling
paint debris, whichever is greater, unless the property line prevents 10 feet
of such ground covering.
(iv) In
certain situations, the renovation firm must take extra precautions in
containing the work area to ensure that dust and debris from the renovation
does not contaminate other buildings or other areas of the property or migrate
to adjacent properties.
(c) Prohibited and restricted practices. The
work practices listed below shall be prohibited or restricted during a
renovation as follows:
1. Open-flame burning
or torching of lead-based paint is prohibited.
2. The use of machines that disturb
lead-based paint through high-speed operation such as sanding, grinding, power
planing, needle gun, abrasive blasting, or sandblasting, is prohibited unless
such machines are used with HEPA exhaust control.
3. Operating a heat gun on lead-based paint
is permitted only at temperatures below 1100 degrees Fahrenheit.
(d) Waste from renovations.
1. Waste from renovation activities must be
contained to prevent releases of dust and debris before the waste is removed
from the work area for storage or disposal. If a chute is used to remove waste
from the work area, it must be covered.
2. At the conclusion of each work day and at
the conclusion of the renovation, waste that has been collected from renovation
activities must be stored under containment, in an enclosure, or behind a
barrier that prevents release of dust and debris out of the work area and
prevents access to dust and debris.
3. When the firm transports waste from
renovation activities, the firm must contain the waste to prevent release of
dust and debris.
(e)
Cleaning the work area. After the renovation has been completed, the firm must
clean the work area until no dust, debris or residue remains.
1. Interior and exterior renovations. The
firm must:
(i) Collect all paint chips and
debris and, without dispersing any of it, seal this material in a heavy-duty
bag, and
(ii) Remove the protective
sheeting. Mist the sheeting before folding it, fold the dirty side inward, and
either tape shut to seal or seal in heavy-duty bags. Sheeting used to isolate
contaminated rooms from non-contaminated rooms must remain in place until after
the cleaning and removal of other sheeting. Dispose of the sheeting as
waste.
2. Additional
cleaning for interior renovations. The firm must clean all objects and surfaces
in the work area and within 2 feet of the work area in the following manner,
cleaning from higher to lower:
(i) Walls.
Clean walls starting at the ceiling and working down to the floor by either
vacuuming with a HEPA vacuum or wiping with a damp cloth, and
(ii) Remaining surfaces. Thoroughly vacuum
all remaining surfaces and objects in the work area, including furniture and
fixtures, with a HEPA vacuum. The HEPA vacuum must be equipped with a beater
bar when vacuuming carpets and rugs, and
(iii) Wipe all remaining surfaces and objects
in the work area, except for carpeted or upholstered surfaces, with a damp
cloth. Mop uncarpeted floors thoroughly, using a mopping method that keeps the
wash water separate from the rinse water, such as the 2-bucket mopping method,
or using a wet mopping system.
(4) Standards for post-renovation cleaning
verification
(a) Interiors.
1. A certified renovator must perform a
visual inspection to determine whether dust, debris or residue is still
present. If dust, debris or residue is present, these conditions must be
removed by re-cleaning and another visual inspection must be
performed.
2. After a successful
visual inspection, a certified renovator must:
(i) Verify that each windowsill in the work
area has been adequately cleaned, using the following procedure.
(1) Wipe the windowsill and window trough
with a wet disposable cleaning cloth that is damp to the touch. If the cloth
matches or is lighter than the cleaning verification card, the windowsill and
window trough have been adequately cleaned.
(2) If the cloth does not match and is darker
than the cleaning verification card, re-clean the windowsill and window trough
as directed in this Section, then either use a new cloth or fold the used cloth
in such a way that an unused surface is exposed, and wipe the surface again. If
the cloth matches or is lighter than the cleaning verification card, the
windowsill and window trough have been adequately cleaned.
(3) If the cloth does not match and is darker
than the cleaning verification card, wait for 1 hour or until the surface has
dried completely, whichever is longer.
(4) After waiting for the windowsill and
window trough to dry, wipe the windowsill and window trough with a dry
disposable cleaning cloth. After this wipe, the windowsill and window trough
have been adequately cleaned.
(ii) Wipe uncarpeted floors and countertops
within the work area with a wet disposable cleaning cloth. Floors must be wiped
using an application device with a long handle and a head to which the cloth is
attached. The cloth must remain damp at all times while it is being used to
wipe the surface for post-renovation cleaning verification. If the surface
within the work area is greater than 40 square feet, the surface within the
work area must be divided into roughly equal sections that are each less than
40 square feet. Wipe each such section separately with a new wet disposable
cleaning cloth. If the cloth used to wipe each section of the surface within
the work area matches or is lighter than the cleaning verification card, the
surface has been adequately cleaned.
(1) If
the cloth used to wipe a particular surface section does not match and is
darker than the cleaning verification card, re-clean that section of the
surface as directed in this Section, then use a new wet disposable cleaning
cloth to wipe that section again. If the cloth matches or is lighter than the
cleaning verification card, that section of the surface has been adequately
cleaned.
(2) If the cloth used to
wipe a particular surface section does not match and is darker than the
cleaning verification card after the surface has been re-cleaned, wait for 1
hour or until the entire surface within the work area has dried completely,
whichever is longer.
(3) After
waiting for the entire surface within the work area to dry, wipe each section
of the surface that has not yet achieved post-renovation cleaning verification
with a dry disposable cleaning cloth. After this wipe, that section of the
surface has been adequately cleaned.
3. When the work area passes the
post-renovation cleaning verification, remove the warning signs.
(b) Exteriors. A certified
renovator must perform a visual inspection to determine whether dust, debris or
residue is still present on surfaces in and below the work area, including
windowsills and the ground. If dust, debris or residue is present, these
conditions must be eliminated and another visual inspection must be performed.
When the area passes the visual inspection, remove the warning signs.
(5) Optional dust clearance
testing. Cleaning verification need not be performed if the contract between
the renovation firm and the person contracting for the renovation or another
Federal, State, Territorial, Tribal, or local law or regulation requires:
(a) The renovation firm to perform dust
clearance sampling at the conclusion of a renovation covered by this
subpart.
(b) The dust clearance
samples are required to be collected by a certified inspector, risk assessor or
dust sampling technician.
(c) The
renovation firm is required to re-clean the work area until the dust clearance
sample results are below the clearance standards in Rule
391-3-24-.07.
(6) Activities conducted after
post-renovation cleaning verification. Activities that do not disturb
lead-based paint, such as applying paint to walls that have already been
prepared, are not regulated by this subpart if they are conducted after
post-renovation cleaning verification has been performed.