Ga. Comp. R. & Regs. R. 391-3-28-.16 - Management of Augmented Flows
(1) Definitions. Notwithstanding the
definitions provided in
391-3-28-.02, the following terms
as used in this rule shall be interpreted in accordance with definitions as set
forth in the relevant sections of the Flint River Drought Protection Act and as
defined herein:
(a) "Permittee" means any
person holding a valid surface water withdrawal permit within the affected
areas issued pursuant to Code Section
12-5-31 which provides for the
withdrawal of surface water.
(b)
"Vulnerable aquatic life" means any species found in the affected areas that is
dependent, for any portion of its lifecycle, on the aquatic ecosystem and that
has been listed as threatened, endangered, or is proposed in the Federal
Register for listing under the federal Endangered Species Act (16 U.S.C.
1531
et seq.).
(2) Director Notification. Once a
state funded augmentation project has been permitted to operate for the sole
purpose of maintaining the minimum stream flows sufficient to protect habitat
critical for vulnerable aquatic life within the affected areas, the Director
shall inform specified downstream permittees about the project. In addition,
notifications to specified downstream permittees to let the flow provided by
the augmentation project pass his or her point of withdrawal shall be conducted
in accordance with section (4).
(3)
Permittees Subject to Notification.
(a) The
specifics of such notifications, including those permittees subject to the
notification, are defined by site-specific characteristics. Therefore, once any
such augmentation project is sited but before it begins operation, the Director
shall, based on the project purpose, location, design and planned operations,
specify all of the permittees downstream of each project that may be subject to
such notifications.
(b) When
specifying such permittees and preparing such notifications, the Director may
consider the following:
1.The best available
modeling and monitoring data for the relevant project location, watershed,
stream reaches, and tributaries;
2.The best available information on
occurrence and habitat for vulnerable aquatic species;
3.The date the project is expected to
commence operation;
4.The distance
downstream for which protection of augmented flows is appropriate;
5.The degree to which protection of augmented
flows will assist in mitigating the effects of droughts, provide ecological or
other environmental benefits, and ensure sustainable, long-term access to water
resources for existing and future water users;
6.Available climatic data and
information;
7.The hydrology of the
relevant stream reaches including, but not limited to, any surface water and
groundwater interactions arising from the Flint River Basin's karst
geology;
8.The location of
tributaries downstream of the project and the amount of flow such tributaries
contribute to the relevant stream reach;
9.The potential for water loss from the
relevant stream reaches that may occur due to evaporation and/or other
factors;
10.The potential for water
gain that may occur due to precipitation, inflows from other tributaries and/or
other factors;
11.The number and
type of permitted withdrawals that may impact flows in the relevant stream
reaches;
12.Meteorological
conditions or other circumstances that may result in surface water flows
greater than the flow provided by the project which would continue to be
subject to withdrawal in accordance with the permittee's water withdrawal
permit; and
13.Any other data or
information the Director deems relevant.
(c) When specifying the permittees subject to
the notification required by (b) above, the Director shall also establish those
permittees that shall not be subject to such notification.
(4) Notification of Onset, and Conclusion, of
Augmentation and Notification Contents. Those permittees who are required to
let the flow provided by the augmentation project pass his or her point of
withdrawal shall be notified by the Director of the onset, and conclusion, of
each period of augmentation.
(a) The
notification to each permittee of the onset of each period of augmentation
shall contain at a minimum:
1.The location of
the upstream augmentation project;
2.The amount of augmented flow the project is
expected to provide, and the proportion of that flow a permit holder must let
pass their point of withdrawal;
3.The distance downstream of the flow
augmentation project to which the notification applies; and
4.The procedure for the permittee to quantify
the amount of flow in the relevant stream reach and determine if that flow is
greater than the flow that the permit holder must let pass their point of
withdrawal and is therefore subject to withdrawal in accordance with the
permittee's withdrawal permit. Procedures may include but are not limited to
accessing online information from appropriate water monitoring gages.
(b) As provided in subsection (d)
of Code Section
12-5-546.2, the Director's
notification shall also contain notice of opportunity for a hearing and shall
be served by certified mail, return receipt requested, to the most recent
address provided by the permittee. Any permittee to whom such notification is
directed shall comply therewith immediately, but shall be afforded a hearing
within five business days of the Director's receipt of a petition filed by such
permittee. Such hearing shall be before an administrative law judge of the
Office of State Administrative Hearings and shall be conducted in accordance
with subsection (c) of Code Section
12-2-2. Based upon findings
adduced at such hearing, the notification shall be modified, reversed, or
continued by the Director.
(5) The permit holder responsible for
operation of any state funded augmentation project operated for the sole
purpose of maintaining the minimum stream flows sufficient to protect habitat
critical for vulnerable aquatic life within the affected areas shall, as part
of the process of permitting water withdrawal under this rule and under the
Rules for Groundwater Use, 391-3-2, specify the vulnerable aquatic life of
concern, design flows under specific conditions, and other parameters relevant
to the specific site. The permit holder responsible for operation of such
project shall inform the Director when such project becomes operational as well
as at the onset, and conclusion, of each period of augmentation conducted to
maintain minimum stream flows sufficient to protect habitat critical for
vulnerable aquatic life within the affected areas. Information to be submitted
at the onset of each period of augmentation includes the following:
(a) Amount of augmented flow the project is
expected to provide; and
(b) Any
other information or data the Director determines is needed to allow
specification of affected downstream permittees and preparation of
notifications during specified periods of the project's
operations.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.