Haw. Code R. § 11-23-09 - Siting and pre-conatruction reouirements
(a) Any
new injection well, other than subclass 0 injection wells, shall be sited
beyond an area which extends at least one-guarter mile from any part of a
drinking water source. This includes not only the surface expression of the
water supply well, tunnel or spring, but also all portions of the subsurface
collection System which may extend laterally, either at right or inclined
angles to the ground surface. The area of protection shall be delineated by a
reasonably smooth curve drawn to connect the points extending one-guarter mile
beyond the most extensive portions of the drinking water source and its
collection system.
(b) Where the
surface expression of an existing drinking water source drawing from an
artesian aquifer is located in an exempted caprock aquifer, a new injection
well, other than a subclass D injection well, shall be located, in addition to
subsection (a) of this section, outside an area measuring one-half mile wide,
which is bisected by a line running hydrologically upgradient from the surface
expression of the drinking water source to the UIC boundary line. This
condition also applies to any future drinking water source which may be sited
in an exempted aquifer.
(c) For a
proposed injection well which is sited mauka of the UIC boundary line, in
addition to meeting the minimum distance requirement in subsection (a) of this
section, the department shall require the applicant to submit water quality
data representative of local conditions as part of the application. Where water
quality data is lacking or insufficient to determine the areal water quality,
the department may require the applicant to collect representative water
samples from the injection well during construction. The samples shall be
collected and analyzed, in accordance with Standards and methods established in
chapter 11-20, entitled "Rules Relating To Potable Water Systems". The
parameters for which values shall be identified are, at least, the following:
(1) Chloride concentration,
(2) Total dissolved solids (TOS),
and
(3) Coliform - Total; if found,
then fecal and Streptococcus determinations.
(d) The variety of injection wells and their
uses dictate a variety of construction designs consistent with those uses, and
precludes specific construction Standards for each type of injection well
outlined in this chapter. However, an injection well shall be designed for its
intended use, in accordance with good engineering practices as recommended by
the Honolulu Board of Water Supply's "Water System Standards", dated March,
1977.
(e) Vertical migration
resulting in undesirabla mixing of fluids from aquifers of substantially
different water guality (due to improper well construction or use of an
injection well) shall be prevented by preserving the integrity of the confining
zone or zones by grouting or some other method acceptable to the
department.
(f) If a large void,
such as a lava tube or Solution cavity, is encountered during drilling, where
the drill rod drops more than three feet, measures shall be taken to prevent
unacceptable migration of the injected fluids. The owner shall either verify
that the void does not slope inland or construct the well in such a manner that
wastes are not injected directly into the void. For the first option, a test
boring which verifies the void's inclination inland of the wellsite shall be
drilled. For the second option, the section of the well casing which passes
through the void shall be without openings. Either the perforated casing shall
be replaced with solid casing, or the holes in the casing shall be sealed by
grouting or in some other manner approved by the department. The owner shall
notify the department to arrange discussion and approval of any corrective
actions. Scheduling of the procedures shall be arranged so that the
departmental staff may observe the remedial Operations. The final
responsibility for remedial design, implementation and Performance shall rest
with the Consulting engineer.
(g)
Departmental staff shall have the right to enter property during normal working
hours, without advance notification, for the purpose of observing injection
well construct.ion methods and progress.