Haw. Code R. § 11-264-52 - Content of contingency plan
(a) The contingency
plan must describe the actions facility personnel must take to comply with
sections 11-264-51 and 11-264-56 in response to fires, explosions, or any
unplanned sudden or non-sudden release of hazardous waste or hazardous waste
constituents to air, soil, or surface water at the facility.
(b) If the owner or operator has already
prepared a Spill Prevention, Control, and Countermeasures (SPCC) Plan in
accordance with 40 CFR part 112, or 5 CFR part 1510, or some other emergency or
contingency plan, he need only amend that plan to incorporate hazardous waste
management provisions that are sufficient to comply with the requirements of
this chapter.
(c) The plan must
describe arrangements agreed to by County police departments, fire departments,
hospitals, contractors, and State and County emergency response teams to
coordinate emergency services, pursuant to section 11-264-37.
(d) The plan must list names, addresses, and
phone numbers (office and home) of all persons qualified to act as emergency
coordinator (see section 11-264-55), and this list must be kept up to date.
Where more than one person is listed, one must be named as primary emergency
coordinator and others must be listed in the order in which they will assume
responsibility as alternates. For new facilities, this information must be
supplied to the director at the time of certification, rather than at the time
of permit application.
(e) The plan
must include a list of all emergency equipment at the facility (such as fire
extinguishing systems, spill control equipment, communications and alarm
systems (internal and external), and decontamination equipment), where this
equipment is required. This list must be kept up to date. In addition, the plan
must include the location and a physical description of each item on the list,
and a brief outline of its capabilities.
(f) The plan must include an evacuation plan
for facility personnel where there is a possibility that evacuation could be
necessary. This plan must describe the signal(s) to be used to begin
evacuation, evacuation routes, and alternate evacuation routes (in cases where
the primary routes could be blocked by releases of hazardous waste or
fires).
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.