Haw. Code R. § 11-270-42 - Permit modification at the request of the permittee
(a) Class 1 modifications.
(1) Except as provided in paragraph (a)(2),
the permittee may put into effect Class 1 modifications listed in Appendix I of
this section under the following conditions:
(i) The permittee must notify the director
concerning the modification by certified mail or other means that establish
proof of delivery within seven calendar days after the change is put into
effect. This notice must specify the changes being made to permit conditions or
supporting documents referenced by the permit and must explain why they are
necessary. Along with the notice, the permittee must provide the applicable
information required by sections 11-270-13 through 11-270-21, 11-270-62, and
11-270-63.
(ii) The permittee must
send a notice of the modification to all persons on the facility mailing list,
maintained by the director in accordance with subparagraph 11-271-10(c)(1)(ix),
and the appropriate units of State and County government, as specified in
subparagraph 11-271-10(c) (1) (x). This notification must be made within ninety
calendar days after the change is put into effect. For the Class 1
modifications that require prior director approval, the notification must be
made within ninety calendar days after the director approves the
request.
(iii) Any person may
request the director to review, and the director may for cause reject, any
Class 1 modification. The director must inform the permittee by certified mail
that a Class 1 modification has been rejected, explaining the reasons for the
rejection. If a Class 1 modification has been rejected, the permittee must
comply with the original permit conditions.
(2) Class 1 permit modifications identified
in Appendix I by an asterisk may be made only with the prior written approval
of the director.
(3) For a Class 1
permit modification, the permittee may elect to follow the procedures in
subsection 11-270-42(b) for Class 2 modifications instead of the Class 1
procedures. The permittee must inform the director of this decision in the
notice required in paragraph 11-270-42(b)(1).
(b) Class 2 modifications.
(1) For Class 2 modifications, listed in
Appendix I of this section, the permittee must submit a modification request to
the director that:
(i) Describes the exact
change to be made to the permit conditions and supporting documents referenced
by the permit;
(ii) Identifies that
the modification is a Class 2 modification;
(iii) Explains why the modification is
needed; and
(2) The permittee must send a notice of the
modification request to all persons on the facility mailing list maintained by
the director and to the appropriate units of State and local government as
specified in subparagraph 11-271-10(c)(1)(x) and must publish this notice in a
major local newspaper of general circulation. This notice must be mailed and
published within seven days before or after the date of submission of the
modification request, and the permittee must provide to the director evidence
of the mailing and publication. The notice must include:
(i) Announcement of a sixty day comment
period, in accordance with paragraph 11-270-42(b)(5), and the name and address
of a department contact to whom comments must be sent;
(ii) Announcement of the date, time, and
place for a public meeting held in accordance with paragraph
11-270-42(b)(4);
(iii) Name and
telephone number of the permittee's contact person;
(iv) Name and telephone number of a
department contact person;
(v)
Location where copies of the modification request and any supporting documents
can be viewed and copied; and
(vi)
The following statement: "The permittee's compliance history during the life of
the permit being modified is available from the Department of Health contact
person.''
(3) The
permittee must place a copy of the permit modification request and supporting
documents in a location accessible to the public in the vicinity of the
permitted facility.
(4) The
permittee must hold a public meeting no earlier than fifteen days after the
publication of the notice required in paragraph (b)(2) and no later than
fifteen days before the close of the sixty day comment period. The meeting must
be held to the extent practicable in the vicinity of the permitted
facility.
(5) The public shall be
provided sixty days to comment on the modification request. The comment period
will begin on the date the permittee publishes the notice in the local
newspaper. Comments should be submitted to the department contact identified in
the public notice.
(6)
(i) No later than ninety days after receipt
of the modification request, the director must:
(A) Approve the modification request, with or
without changes, and modify the permit accordingly;
(B) Deny the request;
(C) Determine that the modification request
must follow the procedures in subsection 11-270-42(c) for Class 3 modifications
for the following reasons:
(1) There is
significant public concern about the proposed modification; or
(2) The complex nature of the change requires
the more extensive procedures of Class 3.
(D) Approve the request, with or without
changes, as a temporary authorization having a term of up to one-hundred and
eighty days, or
(E) Notify the
permittee that he or she will decide on the request within the next thirty
days.
(ii) If the
director notifies the permittee of a thirty day extension for a decision, the
director must, no later than one-hundred and twenty days after receipt of the
modification request:
(A) Approve the
modification request, with or without changes, and modify the permit
accordingly;
(B) Deny the request;
or
(C) Determine that the
modification request must follow the procedures in subsection 11-270-42(c) for
Class 3 modifications for the following reasons:
(1) There is significant public concern about
the proposed modification; or
(2)
The complex nature of the change requires the more extensive procedures of
Class 3.
(D) Approve the
request, with or without changes, as a temporary authorization having a term of
up to one-hundred and eighty days.
(iii) If the director fails to make one of
the decisions specified in subparagraph (b)(6)(ii) by the one-hundred and
twentieth day after receipt of the modification request, the permittee is
automatically authorized to conduct the activities described in the
modification request for up to one-hundred and eighty days, without formal
department action. The authorized activities must be conducted as described in
the permit modification request and must be in compliance with all appropriate
standards of chapter 11-265. If the director approves, with or without changes,
or denies the modification request during the term of the temporary or
automatic authorization provided for in subparagraph (b)(6)(i), (ii), or (iii),
such action cancels the temporary or automatic authorization.
(iv)
(A) In
the case of an automatic authorization under subparagraph (b) (6) (iii), or a
temporary authorization under clauses (b) (6) (i) (D) or (b) (6) (ii) (D), if
the director has not made a final approval or denial of the modification
request by the date fifty days prior to the end of the temporary or automatic
authorization, the permittee must within seven days of that time send a
notification to persons on the facility mailing list, and make a reasonable
effort to notify other persons who submitted written comments on the
modification request, that:
(1) The permittee
has been authorized temporarily to conduct the activities described in the
permit modification request, and
(2) Unless the director acts to give final
approval or denial of the request by the end of the authorization period, the
permittee will receive authorization to conduct such activities for the life of
the permit.
(B) If the
owner/operator fails to notify the public by the date specified in clause
(b)(6)(iv)(A), the effective date of the permanent authorization will be
deferred until fifty days after the owner/operator notifies the
public.
(v) Except as
provided in clause (b)(6)(vii), if the director does not finally approve or
deny a modification request before the end of the automatic or temporary
authorization period or reclassify the modification as a Class 3, the permittee
is authorized to conduct the activities described in the permit modification
request for the life of the permit unless modified later under section
11-270-41 or section 11-270-42. The activities authorized under this subsection
must be conducted as described in the permit modification request and must be
in compliance with all appropriate standards of chapter 11-265.
(vi) In making a decision to approve or deny
a modification request, including a decision to issue a temporary authorization
or to reclassify a modification as a Class 3, the director must consider all
written comments submitted to the department during the public comment period
and must respond in writing to all significant comments in his or her
decision.
(vii) With the written
consent of the permittee, the director may extend indefinitely or for a
specified period the time periods for final approval or denial of a
modification request or for reclassifying a modification as a Class
3.
(7) The director may
deny or change the terms of a Class 2 permit modification request under
subparagraphs (b)(6)(i) through (iii) for the following reasons:
(i) The modification request is incomplete;
(ii) The requested modification does not comply with the appropriate
requirements of chapter 11-264 or other applicable requirements; or
(iii) The conditions of the modification fail
to protect human health and the environment.
(8) The permittee may perform any
construction associated with a Class 2 permit modification request beginning
sixty days after the submission of the request unless the director establishes
a later date for commencing construction and informs the permittee in writing
before day sixty.
(c)
Class 3 modifications.
(1) For Class 3
modifications listed in Appendix I of this section, the permittee must submit a
modification request to the director that:
(i) Describes the exact change to be made to
the permit conditions and supporting documents referenced by the
permit
(ii) Identifies that the
modification is a Class 3 modification;
(iii) Explains why the modification is
needed; and
(2) The permittee must send a notice of the
modification request to all persons on the facility mailing list maintained by
the director and to the appropriate units of State and county government as
specified in paragraph 11-271-10(c)(1)(x) and must publish this notice in a
major local newspaper of general circulation. This notice must be mailed and
published within seven days before or after the date of submission of the
modification request, and the permittee must provide to the director evidence
of the mailing and publication. The notice must include:
(i) Announcement of a sixty day comment
period, and a name and address of a department contact to whom comments must be
sent;
(ii) Announcement of the
date, time, and place for a public meeting on the modification request, in
accordance with paragraph 11-270-42(c)(4);
(iii) Name and telephone number of the permittee's contact
person;
(iv) Name and telephone
number of a department contact person;
(v) Location where copies of the modification
request and any supporting documents can be viewed and copied; and
(vi) The following statement: "The
permittee's compliance history during the life of the permit being modified is
available from the Department of Health contact person.''
(3) The permittee must place a copy of the
permit modification request and supporting documents in a location accessible
to the public in the vicinity of the permitted facility.
(4) The permittee must hold a public meeting
no earlier than fifteen days after the publication of the notice required in
paragraph (c)(2) and no later than fifteen days before the close of the sixty
day comment period. The meeting must be held to the extent practicable in the
vicinity of the permitted facility.
(5) The public shall be provided at least
sixty days to comment on the modification request. The comment period will
begin on the date the permittee publishes the notice in the local newspaper.
Comments should be submitted to the department contact identified in the
notice.
(6) After the conclusion of
the sixty day comment period, the director must grant or deny the permit
modification request according to the permit modification procedures of chapter
11-271. In addition, the director must consider and respond to all significant
written comments received during the sixty day comment period.
(d) Other modifications.
(1) In the case of modifications not
explicitly listed in Appendix I of this section, the permittee may submit a
Class 3 modification request to the department, or he or she may request a
determination by the director that the modification should be reviewed and
approved as a Class 1 or Class 2 modification. If the permittee requests that
the modification be classified as a Class 1 or 2 modification, he or she must
provide the department with the necessary information to support the requested
classification.
(2) The director
shall make the determination described in paragraph (d)(1) as promptly as
practicable. In determining the appropriate class for a specific modification,
the director shall consider the similarity of the modification to other
modifications codified in Appendix I and the following criteria:
(i) Class 1 modifications apply to minor
changes that keep the permit current with routine changes to the facility or
its operation. These changes do not substantially alter the permit conditions
or reduce the capacity of the facility to protect human health or the
environment. In the case of Class 1 modifications, the director may require
prior approval.
(ii) Class 2
modifications apply to changes that are necessary to enable a permittee to
respond, in a timely manner, to,
(A) Common
variations in the types and quantities of the wastes managed under the facility
permit,
(B) Technological
advancements, and
(C) Changes
necessary to comply with new regulations, where these changes can be
implemented without substantially changing design specifications or management
practices in the permit.
(iii) Class 3 modifications substantially
alter the facility or its operation.
(e) Temporary authorizations.
(1) Upon request of the permittee, the
director may, without prior public notice and comment, grant the permittee a
temporary authorization in accordance with this subsection. Temporary
authorizations must have a term of not more than one-hundred and eighty
days.
(2)
(i) The permittee may request a temporary
authorization for:
(A) Any Class 2
modification meeting the criteria in subparagraph (e) (3) (ii), and
(B) Any Class 3 modification that meets the
criteria in clause (e)(3)(ii)(A) or (B); or that meets the criteria in clauses
(e)(3)(ii)(C) through (E) and provides improved management or treatment of a
hazardous waste already listed in the facility permit.
(ii) The temporary authorization request must
include:
(A) A description of the activities
to be conducted under the temporary authorization;
(B) An explanation of why the temporary
authorization is necessary; and
(C)
Sufficient information to ensure compliance with chapter 11-264
standards.
(iii) The
permittee must send a notice about the temporary authorization request to all
persons on the facility mailing list maintained by the director and to
appropriate units of State and local governments as specified in paragraph
11-271-10(c)(1)(x). This notification must be made within seven days of
submission of the authorization request.
(3) The director shall approve or deny the
temporary authorization as quickly as practical. To issue a temporary
authorization, the director must find:
(i)
The authorized activities are in compliance with the standards of chapter
11-264.
(ii) The temporary
authorization is necessary to achieve one of the following objectives before
action is likely to be taken on a modification request:
(A) To facilitate timely implementation of
closure or corrective action activities;
(B) To allow treatment or storage in tanks or
containers, or in containment buildings in accordance with chapter
11-268;
(C) To prevent disruption
of ongoing waste management activities;
(D) To enable the permittee to respond to
sudden changes in the types or quantities of the wastes managed under the
facility permit; or
(E) To
facilitate other changes to protect human health and the environment.
(4) A temporary
authorization may be reissued for one additional term of up to one-hundred and
eighty days provided that the permittee has requested a Class 2 or 3 permit
modification for the activity covered in the temporary authorization, and:
(i) The reissued temporary authorization
constitutes the director's decision on a Class 2 permit modification in
accordance with clause (b) (6) (i) (D) or (b) (6) (ii) (D), or
(ii) The director determines that the
reissued temporary authorization involving a Class 3 permit modification
request is warranted to allow the authorized activities to continue while the
modification procedures of subsection (c) are conducted.
(f) Public notice of permit
modification decisions.
(1) The director
shall notify persons on the facility mailing list and appropriate units of the
State and county government within ten days of any decision under this section
to grant or deny a Class 2 or 3 permit modification request. The director shall
also notify such persons within ten days after an automatic authorization for a
Class 2 modification goes into effect under subparagraph 11-270-42(b) (6) (iii)
or (v).
(2) [Reserved]
(3) [Reserved]
(g) Newly regulated wastes and units.
(1) The permittee is authorized to continue
to manage wastes listed or identified as hazardous under chapter 11-261, or to
continue to manage hazardous waste in units newly regulated as hazardous waste
management units, if:
(i) The unit was in
existence as a hazardous waste facility with respect to the newly listed or
characterized waste or newly regulated waste management unit on the effective
date of the final rule listing or identifying the waste, or regulating the
unit;
(ii) The permittee submits a
Class 1 modification request on or before the date on which the waste or unit
becomes subject to the new requirements;
(iii) The permittee is in compliance with the
applicable standards of chapters 11-265 and 11-266;
(iv) The permittee also submits a complete
Class 2 or 3 modification request within one-hundred and eighty days of the
effective date of the rule listing or identifying the waste, or subjecting the
unit to management standards established pursuant to chapter 342J, HRS or the
rules adopted thereunder;
(v) In
the case of land disposal units, the permittee certifies that each such unit is
in compliance with all applicable requirements of chapter 11-265 for
groundwater monitoring and financial responsibility on the date twelve months
after the effective date of the rule identifying or listing the waste as
hazardous, or regulating the unit as hazardous waste management unit. If the
owner or operator fails to certify compliance with all these requirements, he
or she will lose authority to operate under this section.
(2) New wastes or units added to a facility's
permit under this subsection do not constitute expansions for the purpose of
the twenty-five percent capacity expansion limit for Class 2
modifications.
(h)
Military hazardous waste munitions treatment and disposal. The permittee is
authorized to continue to accept waste military munitions notwithstanding any
permit conditions barring the permittee from accepting off-site wastes, if:
(1) The facility was in existence as a
hazardous waste facility, and the facility was already permitted to handle the
waste military munitions, on the date when the waste military munitions became
subject to hazardous waste regulatory requirements;
(2) On or before the date when the waste
military munitions become subject to hazardous waste regulatory requirements,
the permittee submits a Class 1 modification request to remove or amend the
permit provision restricting the receipt of off-site waste munitions;
and
(3) The permittee submits a
complete Class 2 modification request within 180 days of the date when the
waste military munitions became subject to hazardous waste regulatory
requirements.
(i) Permit
modification list. The director must maintain a list of all approved permit
modifications and must publish a notice once a year in a state-wide newspaper
that an updated list is available for review.
Appendix I to section 11-270-42 -- Classification of Permit Modification
| Modifications | Class |
| A. General Permit Provisions | |
| 1. Administrative and informational changes | 1 |
| 2. Correction of typographical errors | 1 |
| 3. Equipment replacement or upgrading with functionally equivalent components (e.g., pipes, valves, pumps, conveyors, controls) | 1 |
| 4. Changes in the frequency of or procedures for monitoring, reporting, sampling, or maintenance activities by the permittee: | |
| a. To provide for more frequent monitoring, reporting, sampling, or maintenance. | 1 |
| b. Other changes | 2 |
| 5. Schedule of compliance: | |
| a. Changes in interim compliance dates, with prior approval of the director. | 11 |
| b. Extension of final compliance date. | 3 |
| 6. Changes in expiration date of permit to allow earlier permit termination, with prior approval of the director. | 11 |
| 7. Changes in ownership or operational control of a facility, provided the procedures of subsection 11-270-40(b) are followed. | 11 |
| B. General Facility Standards | |
| 1. Changes to waste sampling or analysis methods: | |
| a. To conform with agency guidance or regulations. | 1 |
| b. To incorporate changes associated with F039 (multi-source leachate) sampling or analysis methods. | 11 |
| c. To incorporate changes associated with underlying hazardous constituents in ignitable or corrosive wastes. | 11 |
| d. Other changes. | 2 |
| 2. Changes to analytical quality assurance/control plan: | |
| a. To conform with agency guidance or regulations. | 1 |
| b. Other changes | 2 |
| 3. Changes in procedures for maintaining the operating record. | 1 |
| 4. Changes in frequency or content of inspection schedules. | 2 |
| 5. Changes in the training plan: | |
| a. That affect the type or decrease the amount of training given to employees. | 2 |
| b. Other changes | 1 |
| 6. Contingency plan: | |
| a. Changes in emergency procedures (i.e.,spill or release response procedures). | 2 |
| b. Replacement with functionally equivalent equipment, upgrade, or relocate emergency equipment listed. | 1 |
| c. Removal of equipment from emergency equipment list. | 2 |
| d. Changes in name, address, or phone number of coordinators or other persons or agencies identified in the plan. | 1 |
| 7. Construction quality assurance plan: | |
| a. Changes that the CQA officer certifies in the operating record will provide equivalent or better certainty that the unit components meet the design specifications | 1 |
| b. Other changes | 2 |
| Note: When a permit modification (such as introduction of a new unit) requires a change in facility plans or other general facility standards, that change shall be reviewed under the same procedures as the permit modification. | |
| C. Ground-Water Protection | |
| 1. Changes to wells: | |
| a. Changes in the number, location, depth, or design of upgradient or downgradient wells of permitted ground-water monitoring system. | 2 |
| b. Replacement of an existing well that has been damaged or rendered inoperable, without change to location, design, or depth of the well. | 1 |
| 2. Changes in ground-water sampling or analysis procedures or monitoring schedule, with prior approval of the director. | 11 |
| 3. Changes in statistical procedure for determining whether a statistically significant change in ground-water quality between upgradient and downgradient wells has occurred, with prior approval of the director. | 11 |
| 4. Changes in point of compliance. | 12 |
| 5. Changes in indicator parameters, hazardous constituents, or concentration limits (including ACLs): | |
| a. As specified in the groundwater protection standard. | 3 |
| b. As specified in the detection monitoring program | 2 |
| 6. Changes to a detection monitoring program as required by subsection 11-264-98(j), unless otherwise specified in this appendix | 2 |
| 7. Compliance monitoring program: | |
| a. Addition of compliance monitoring program as required by paragraph 11-264-98(h)(4) and section 11-264-99 | 3 |
| b. Changes to a compliance monitoring program as required by subsection 11-264-99(k), unless otherwise specified in this appendix | 2 |
| 8. Corrective action program: | |
| a. Addition of a corrective action program as required by paragraph 11-264-99(i) (2) and section 11-264-100 | 3 |
| b. Changes to a corrective action program as required by subsection 11-264-100(h), unless otherwise specified in this Appendix | 2 |
| D. Closure | |
| 1. Changes to the closure plan: | |
| a. Changes in estimate of maximum extent of operations or maximum inventory of waste on-site at any time during the active life of the facility, with prior approval of the director | 11 |
| b. Changes in the closure schedule for any unit, changes in the final closure schedule for the facility, or extension of the closure period, with prior approval of the director | 11 |
| c. Changes in the expected year of final closure, where other permit conditions are not changed, with prior approval of the director | 11 |
| d. Changes in procedures for decontamination of facility equipment or structures, with prior approval of the director | 11 |
| e. Changes in approved closure plan resulting from unexpected events occurring during partial or final closure, unless otherwise specified in this appendix | 2 |
| f. Extension of the closure period to allow a landfill, surface impoundment or land treatment unit to receive non-hazardous wastes after final receipt of hazardous wastes under subsections 11-264-113(d) and 2 (e) | 2 |
| 2. Creation of a new landfill unit as part of closure | 3 |
| 3. Addition of the following new units to be used temporarily for closure activities: | |
| a. Surface impoundments | 3 |
| b. Incinerators | 3 |
| c. Waste piles that do not comply with subsection 11-264-250(c) | 3 |
| d. Waste piles that comply with subsection 11-264-250(c) | 2 |
| e. Tanks or containers (other than specified below) | 2 |
| f. Tanks used for neutralization, dewatering, phase separation, or component separation, with prior approval of the director | 11 |
| E. Post-Closure | |
| 1. Changes in name, address, or phone number of contact in post-closure plan | 1 |
| 2. Extension of post-closure care period | 2 |
| 3. Reduction in the post-closure care period | 3 |
| 4. Changes to the expected year of final closure, where other permit conditions are not changed | 1 |
| 5. Changes in post-closure plan necessitated by events occurring during the active life of the facility, including partial and final closure | 2 |
| F. Containers | |
| 1. Modification or addition of container units: | |
| a. Resulting in greater than 25% increase in the facility's container storage capacity, except as provided in F(1)(c) and F(4)(a) below | 3 |
| b. Resulting in up to 25% increase in the facility's container storage capacity, except as provided in F(1)(c) and F(4)(a) below | 2 |
| c. Or treatment processes necessary to treat wastes that are restricted from land disposal to meet some or all of the applicable treatment standards or to treat wastes to satisfy (in whole or in part) the standard of "use of practically available technology that yields the greatest environmental benefit'' contained in subparagraph 11-268-8(a)(2)(ii), with prior approval of the director. This modification may also involve addition of new waste codes or narrative descriptions of wastes. It is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 11 |
| 2: | |
| a. Modification of a container unit without increasing the capacity of the unit | 2 |
| b. Addition of a roof to a container unit without alteration of the containment system | 1 |
| 3. Storage of different wastes in containers, except as provided in (F)(4) below: | |
| a. That require additional or different management practices from those authorized in the permit | 3 |
| b. That do not require additional or different management practices from those authorized in the permit | 2 |
| Note: See subsection 11-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. | |
| 4. Storage or treatment of different wastes in containers: | |
| a. That require addition of units or change in treatment process or management standards, provided that the wastes are restricted from land disposal and are to be treated to meet some or all of the applicable treatment standards, or that are to be treated to satisfy (in whole or in part) the standard of "use of practically available technology that yields the greatest environmental benefit'' contained in subparagraph 11-268-8(a)(2)(ii). This modification is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 1 |
| b. That do not require the addition of units or a change in the treatment process or management standards, and provided that the units have previously received wastes of the same type (e.g., incinerator scrubber water). This modification is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 11 |
| G. Tanks | |
| 1: | |
| a. Modification or addition of tank units resulting in greater than 25% increase in the facility's tank capacity, except as provided in G(1)(c), G(1)(d), and G(1)(e) below | 3 |
| b. Modification or addition of tank units resulting in up to 25% increase in the facility's tank capacity, except as provided in G(1)(d) and G(1)(e) below | 2 |
| c. Addition of a new tank that will operate for more than ninety days using any of the following physical or chemical treatment technologies: neutralization, dewatering, phase separation, or component separation | 2 |
| d. After prior approval of the director, addition of a new tank that will operate for up to ninety days using any of the following physical or chemical treatment technologies: neutralization, dewatering, phase separation, or component separation | 11 |
| e. Modification or addition of tank units or treatment processes necessary to treat wastes that are restricted from land disposal to meet some or all of the applicable treatment standards or to treat wastes to satisfy (in whole or in part) the standard of "use of practically available technology that yields the greatest environmental benefit'' contained in subparagraph 11-268-8(a) (2) (ii), with prior approval of the director. This modification may also involve addition of new waste codes. It is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 11 |
| 2. Modification of a tank unit or secondary containment system without increasing the capacity of the unit | 2 |
| 3. Replacement of a tank with a tank that meets the same design standards and has a capacity within +/- 10% of the replaced tank provided | 1 |
| -- The capacity difference is no more than 1500 gallons, | |
| -- The facility's permitted tank capacity is not increased, and | |
| -- The replacement tank meets the same conditions in the permit. | |
| 4. Modification of a tank management practice. | 2 |
| 5. Management of different wastes in tanks: | |
| a. That require additional or different management practices, tank design, different fire protection specifications, or significantly different tank treatment process from that authorized in the permit, except as provided in (G)(5)(c) below | 3 |
| b. That do not require additional or different management practices, tank design, different fire protection specifications, or significantly different tank treatment process than authorized in the permit, except as provided in (G)(5)(d) | 2 |
| c. That require addition of units or change in treatment processes or management standards, provided that the wastes are restricted from land disposal and are to be treated to meet some or all of the applicable treatment standards or that are to be treated to satisfy (in whole or in part) the standard of "use of practically available technology that yields the greatest environmental benefit'' contained in subparagraph 11-268-8(a)(2)(ii). The modification is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | *1 |
| d. That do not require the addition of units or a change in the treatment process or management standards, and provided that the units have previously received wastes of the same type (e.g., incinerator scrubber water). This modification is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 1 |
| Note: See subsection 11-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. | |
| H. Surface Impoundments | |
| 1. Modification or addition of surface impoundment units that result in increasing the facility's surface impoundment storage or treatment capacity | 3 |
| 2. Replacement of a surface impoundment unit | 3 |
| 3. Modification of a surface impoundment unit without increasing the facility's surface impoundment storage or treatment capacity and without modifying the unit's liner, leak detection system, or leachate collection system | 2 |
| 4. Modification of a surface impoundment management practice | 2 |
| 5. Treatment, storage, or disposal of different wastes in surface impoundments: | |
| a. That require additional or different management practices or different design of the liner or leak detection system than authorized in the permit | 3 |
| b. That do not require additional or different management practices or different design of the liner or leak detection system than authorized in the permit | 2 |
| c. That are wastes restricted from land disposal that meet the applicable treatment standards or that are treated to satisfy the standard of "use of practically available technology that yields the greatest environmental benefit'' contained in subparagraph 11-269-8(a) (2) (ii), and provided that the unit meets the minimum technological requirements stated in paragraph 11-268-5(h)(2). This modification is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 1 |
| d. That are residues from wastewater treatment or incineration, provided that disposal occurs in a unit that meets the minimum technological requirements stated in paragraph 11-268-5(h)(2), and provided further that the surface impoundment has previously received wastes of the same type (for example, incinerator scrubber water). This modification is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 1 |
| 6. Modifications of unconstructed units to comply with sections 11-264-221(c), 11-264-222, 11-264-223, and 11-264-226(d) | *1 |
| 7. Changes in response action plan: | |
| a. Increase in action leakage rate | 3 |
| b. Change in a specific response reducing its frequency or effectiveness | 3 |
| c. Other changes | 2 |
| Note: See subsection 11-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes | |
| I. Enclosed Waste Piles. For all waste piles except those complying with subsection 11-264-250(c), modifications are treated the same as for a landfill. The following modifications are applicable only to waste piles complying with subsection 11-264-250(c). | |
| 1. Modification or addition of waste pile units: | |
| a. Resulting in greater than 25% increase in the facility's waste pile storage or treatment capacity | 3 |
| b. Resulting in up to 25% increase in the facility's waste pile storage or treatment capacity | 2 |
| 2. Modification of waste pile unit without increasing the capacity of the unit | 2 |
| 3. Replacement of a waste pile unit with another waste pile unit of the same design and capacity and meeting all waste pile conditions in the permit | 1 |
| 4. Modification of a waste pile management practice | 2 |
| 5. Storage or treatment of different wastes in waste piles: | |
| a. That require additional or different management practices or different design of the unit | 3 |
| b. That do not require additional or different management practices or different design of the unit | 2 |
| 6. Conversion of an enclosed waste pile to a containment building unit. | 2 |
| Note: See subsection 11-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. | |
| J. Landfills and Unenclosed Waste Piles | |
| 1. Modification or addition of landfill units that result in increasing the facility's disposal capacity | 3 |
| 2. Replacement of a landfill | 3 |
| 3. Addition or modification of a liner, leachate collection system, leachate detection system, run-off control, or final cover system | 3 |
| 4. Modification of a landfill unit without changing a liner, leachate collection system, leachate detection system, run-off control, or final cover system | 2 |
| 5. Modification of a landfill management practice | 2 |
| 6. Landfill different wastes: | |
| a. That require additional or different management practices, different design of the liner, leachate collection system, or leachate detection system | 3 |
| b. That do not require additional or different management practices, different design of the liner, leachate collection system, or leachate detection system | 2 |
| c. That are wastes restricted from land disposal that meet the applicable treatment standards or that are treated to satisfy the standard of "use of practically available technology that yields the greatest environmental benefit'' contained in subparagraph 11-268-8(a) (2) (ii), and provided that the landfill unit meets the minimum technological requirements stated in paragraph 11-268-5(h)(2). This modification is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 1 |
| d. That are residues from wastewater treatment or incineration, provided that disposal occurs in a landfill unit that meets the minimum technological requirements stated in paragraph 11-268-5(h)(2), and provided further that the landfill has previously received wastes of the same type (for example, incinerator ash). This modification is not applicable to dioxin-containing wastes (F020, F021, F022, F023, F026, F027, and F028) | 1 |
| 7. Modifications of unconstructed units to comply with sections 11-264-251(c), 11-264-252, 11-264-253, 11-264-254(c), 11-264-301(c), 11-264-302, 11-264-303(c), and 11-264-304 | *1 |
| 8. Changes in response action plan: | |
| a. Increase in action leakage rate | 3 |
| b. Change in a specific response reducing its frequency or effectiveness | 3 |
| c. Other changes | 2 |
| Note: See subsection 11-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. | |
| K. Land Treatment | |
| 1. Lateral expansion of or other modification of a land treatment unit to increase areal extent | 3 |
| 2. Modification of run-on control system | 2 |
| 3. Modify run-off control system | 3 |
| 4. Other modifications of land treatment unit component specifications or standards required in permit | 2 |
| 5. Management of different wastes in land treatment units: | |
| a. That require a change in permit operating conditions or unit design specifications | 3 |
| b. That do not require a change in permit operating conditions or unit design specifications | 2 |
| Note: See subsection 11-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes | |
| 6. Modification of a land treatment unit management practice to: | |
| a. Increase rate or change method of waste application | 3 |
| b. Decrease rate of waste application | 1 |
| 7. Modification of a land treatment unit management practice to change measures of pH or moisture content, or to enhance microbial or chemical reactions | 2 |
| 8. Modification of a land treatment unit management practice to grow food chain crops, to add to or replace existing permitted crops with different food chain crops, or to modify operating plans for distribution of animal feeds resulting from such crops | 3 |
| 9. Modification of operating practice due to detection of releases from the land treatment unit pursuant to paragraph 11-264-278(g)(2) | 3 |
| 10. Changes in the unsaturated zone monitoring system, resulting in a change to the location, depth, number of sampling points, or replace unsaturated zone monitoring devices or components of devices with devices or components that have specifications different from permit requirements | 3 |
| 11. Changes in the unsaturated zone monitoring system that do not result in a change to the location, depth, number of sampling points, or that replace unsaturated zone monitoring devices or components of devices with devices or components having specifications different from permit requirements | 2 |
| 12. Changes in background values for hazardous constituents in soil and soil-pore liquid | 2 |
| 13. Changes in sampling, analysis, or statistical procedure | 2 |
| 14. Changes in land treatment demonstration program prior to or during the demonstration | 2 |
| 15. Changes in any condition specified in the permit for a land treatment unit to reflect results of the land treatment demonstration, provided performance standards are met, and the director's prior approval has been received | 11 |
| 16. Changes to allow a second land treatment demonstration to be conducted when the results of the first demonstration have not shown the conditions under which the wastes can be treated completely, provided the conditions for the second demonstration are substantially the same as the conditions for the first demonstration and have received the prior approval of the director | 11 |
| 17. Changes to allow a second land treatment demonstration to be conducted when the results of the first demonstration have not shown the conditions under which the wastes can be treated completely, where the conditions for the second demonstration are not substantially the same as the conditions for the first demonstration | 3 |
| 18. Changes in vegetative cover requirements for closure | 2 |
| L. Incinerators, Boilers, and Industrial Furnaces: | |
| 1. Changes to increase by more than 25% any of the following limits authorized in the permit: A thermal feed rate limit, a feedstream feed rate limit, a chlorine/chloride feed rate limit, a metal feed rate limit, or an ash feed rate limit. The director will require a new trial burn to substantiate compliance with the regulatory performance standards unless this demonstration can be made through other means. | 3 |
| 2. Changes to increase by up to 25% any of the following limits authorized in the permit: A thermal feed rate limit, a feedstream feed rate limit, a chlorine/chloride feed rate limit, a metal feed rate limit, or an ash feed rate limit. The director will require a new trial burn to substantiate compliance with the regulatory performance standards unless this demonstration can be made through other means. | 2 |
| 3. Modification of an incinerator, boiler, or industrial furnace unit by changing the internal size or geometry of the primary or secondary combustion units, by adding a primary or secondary combustion unit, by substantially changing the design of any component used to remove HCl/Cl2, metals, or particulate from the combustion gases, or by changing other features of the incinerator, boiler, or industrial furnace that could affect its capability to meet the regulatory performance standards. The director will require a new trial burn to substantiate compliance with the regulatory performance standards unless this demonstration can be made through other means. | 3 |
| 4. Modification of an incinerator, boiler, or industrial furnace unit in a manner that would not likely affect the capability of the unit to meet the regulatory performance standards but which would change the operating conditions or monitoring requirements specified in the permit. The director may require a new trial burn to demonstrate compliance with the regulatory performance standards. | 2 |
| 5. Operating requirements: | |
| a. Modification of the limits specified in the permit for minimum or maximum combustion gas temperature, minimum combustion gas residence time, oxygen concentration in the secondary combustion chamber, flue gas carbon monoxide and hydrocarbon concentration, maximum temperature at the inlet to the particulate matter emission control system, or operating parameters for the air pollution control system. The director will require a new trial burn to substantiate compliance with the regulatory performance standards unless this demonstration can be made through other means. | 3 |
| b. Modification of any stack gas emission limits specified in the permit, or modification of any conditions in the permit concerning emergency shutdown or automatic waste feed cutoff procedures or controls | 3 |
| c. Modification of any other operating condition or any inspection or recordkeeping requirement specified in the permit | 2 |
| 6. Burning different wastes: | |
| a. If the waste contains a POHC that is more difficult to burn than authorized by the permit or if burning of the waste requires compliance with different regulatory performance standards than specified in the permit. The director will require a new trial burn to substantiate compliance with the regulatory performance standards unless this demonstration can be made through other means. | 3 |
| b. If the waste does not contain a POHC that is more difficult to burn than authorized by the permit and if burning of the waste does not require compliance with different regulatory performance standards than specified in the permit. | 2 |
| Note: See subsection 11-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes | |
| 7. Shakedown and trial burn: | |
| a. Modification of the trial burn plan or any of the permit conditions applicable during the shakedown period for determining operational readiness after construction, the trial burn period, or the period immediately following the trial burn | 2 |
| b. Authorization of up to an additional 720 hours of waste burning during the shakedown period for determining operational readiness after construction, with the prior approval of the director. | 11 |
| c. Changes in the operating requirements set in the permit for conducting a trial burn, provided the change is minor and has received the prior approval of the director | 11 |
| d. Changes in the ranges of the operating requirements set in the permit to reflect the results of the trial burn, provided the change is minor and has received the prior approval of the director | 11 |
| 8. Substitution of an alternative type of nonhazardous waste fuel that is not specified in the permit | 1 |
| M. Containment Buildings. | |
| 1. Modification or addition of containment building units: | |
| a. Resulting in greater than 25% increase in the facility's containment building storage or treatment capacity. | 3 |
| b. Resulting in up to 25% increase in the facility's containment building storage or treatment capacity. | 2 |
| 2. Modification of a containment building unit or secondary containment system without increasing the capacity of the unit. | 2 |
| 3. Replacement of a containment building with a containment building that meets the same design standards provided: | |
| a. The unit capacity is not increased. | 1 |
| b. The replacement containment building meets the same conditions in the permit. | 1 |
| 4. Modification of a containment building management practice. | 2 |
| 5. Storage or treatment of different wastes in containment buildings: | |
| a. That require additional or different management practices. | 3 |
| b. That do not require additional or different management practices. | 2 |
| N. Corrective Action: | |
| 1. Approval of a corrective action management unit pursuant to section 11-264-552. | 3 |
| 2. Approval of a temporary unit or time extension for a temporary unit pursuant to section 11-264-553. | 2 |
FOOTNOTE: 1Class 1 modifications requiring prior department approval."
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.