Haw. Code R. § 6-77-144 - General requirements

(a) No person may operate a new segment of pipeline, or return to service a segment of pipeline that has been relocated or replaced, until:
(1) It has been tested in accordance with this subchapter and section 6-77-166 to substantiate the maximum allowable operating pressure; and
(2) Each potentially hazardous leak has been located and eliminated.
(b) The test medium must be liquid, air, natural gas, or inert gas that is:
(1) Compatible with the material of which the pipeline is constructed;
(2) Relatively free of sedimentary materials; and
(3) Except for natural gas, nonflammable.
(c) Except as provided in section 6-77-145(a), if air, natural gas, or inert gas is used as the test medium, the following maximum hoop stress limitations apply:

Maximum hoop stress allowed as percentage of SMYS
Class location | Natural gas | Air or inert gas
| |
1 ................ I 80 | 80
2 ................ I 30 | 75
3 ................ I 30 | 50
4 ................ I 30 | 40
(d) Each joint used to tie in a test segment of pipeline is excepted from the specific test requirements of this subchapter, but each non-welded joint must be leak tested at not less than its operating pressure.

Notes

Haw. Code R. § 6-77-144
[Eff ] (Auth: HRS § 269-6) (Imp: 49C.F.R. §192.503, OCT 1, 1990)

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.