Ill. Admin. Code tit. 92, § 451.90 - Official Testing Station Requirements
a) The Station must be clean and properly
maintained so that the Station does not interfere with the operation of the
test lane or designated testing area.
b) The Station must be a permanent building
constructed so that the test lane or designated testing area is protected from
exposure to the weather. The building must have a permanent roof, contiguous
permanent walls and a permanent door or doors meeting the height and width
requirements of this Part (see Section
451.110). The floor of the
building must be a level concrete surface.
c) The building must be located on the
Station property so that a vehicle waiting to enter the building shall neither
obstruct passing vehicles nor cause unsafe congestion in any alley, street or
highway.
d) The vehicular entrance
and exit to the Station must neither be obstructed nor can a driveway be
constructed to interfere with the free movement of a vehicle either entering or
exiting the Station building.
e)
The approach to the entrance of the Station lane must be concrete, asphalt or a
comparable hard surfaced material with minimum dimensions of six feet in length
and as wide as the entrance door.
f) Failure to meet any of the requirements of
this Section will nullify the application until all requirements are
met.
Notes
Amended at 17 Ill. Reg. 12839, effective July 27, 1993