Iowa Admin. Code r. 199-10.19 - Gathering line filing requirements
(1)
Filing requirements. Notice of the proposed construction of a
gathering line as defined in subrule 10.1(3) is required 30 days prior to the
commencement of construction. The notice shall include:
a. The name of the pipeline company proposing
to construct the gathering line and evidence of authority from the Iowa
secretary of state showing the company is authorized to conduct business in
Iowa.
b. The purpose of the
proposed gathering line.
c. A map
of the proposed route of the gathering line, similar to the map required in
paragraph 10.3(1)"b."
d. The design of the proposed gathering line,
similar to the information required in paragraph
10.3(1)"c."
e. The
approximate date that construction will begin.
f. A list of the permissions or approvals of
other state or local regulatory agencies required for construction of the
gathering line.
If construction is on agricultural land, an agricultural mitigation plan as required in 199-Chapter 9 or a written agreement with the landowner is to be provided to the county inspector.
(2)
Reporting
requirements. A copy of any incident, annual report, or other report
filed with the Pipeline and Hazardous Materials Safety Administration pursuant
to 49 CFR Part 191 by the owner or operator of a gathering line located in Iowa
shall be filed with the commission at the same time it is filed with the
Pipeline and Hazardous Materials Safety Administration.