Iowa Admin. Code r. 567-65.208 - Construction certification
(1) The owner of an
open feedlot operation who is issued a construction permit for a settled open
feedlot effluent basin or AT system as provided in rule
567-65.203 (455B,459A) shall
submit to the department a construction certification from a PE certifying all
of the following:
a. The settled open feedlot
effluent basin or AT system was constructed in accordance with the design plans
submitted to the department as part of an application for a construction permit
pursuant to rule 567-65.204 (455B,459A). If the
actual construction deviates from the approved design plans, the construction
certification shall identify all changes and certify that the changes were
consistent with all applicable standards of these rules.
b. The settled open feedlot effluent basin or
AT system was inspected by the PE after completion of construction and before
commencement of operation.
(2) A written record of an investigation for
drainage tile lines, including the findings of the investigation and actions
taken to comply with subrules 65.206(1) and 65.207(3), shall be submitted as
part of the construction certification.