Kan. Admin. Regs. § 5-40-72 - Construction inspection reports

The engineer responsible for the inspection required by K.A.R. 5-40-71 shall, within 30 days of the completion of the construction, repair, or modification of the dam and its appurtenances, submit to the chief engineer an inspection report containing the following items:

(a) Anotice of completion showing the date on which construction, repair, or modification of the dam and its appurtenances was completed;
(b) a statement indicating one of the following:
(1) The dam and its appurtenances were constructed, repaired, or modified substantially in accordance with the permit and the approved plans and specifications; or
(2) the completed work varied from the permit and the approved plans and specifications. A description of each variation shall be provided;
(c) a final survey of the completed dam and its appurtenances, including the following:
(1) A profile of the top of the dam;
(2) a profile of the centerline of the auxiliary spillway or service spillway;
(3) a cross section at the control section of the auxiliary spillway or service spillway;
(4) a cross section of the dam at its deepest point;
(5) a cross section of the dam at the primary spillway if that section is not near the deepest section of the dam;
(6) the locations and elevations of the inlet and the outlet of the primary spillway;
(7) the location and elevation of each drain outlet; and
(8) the final elevation and coordinates of each permanent benchmark; and
(d) a summary or a copy of the daily inspection logs if required by the permit.

Notes

Kan. Admin. Regs. § 5-40-72
Authorized by K.S.A. 2006 Supp. 82a-303a; implementing K.S.A. 2006 Supp. 82a-301a and 82a-303a; effective May 18, 2007.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.