Mich. Admin. Code R. 339.5208 - Installation and reinstallation of boilers

Rule 208.

(1) An owner shall ensure that the installation of a new boiler or a reinstalled boiler meets the requirements of these rules; the ASME boiler and pressure vessel code, 2019 edition, the NBIC 2019 edition, and ASME CSD-1 2018. The ASME code requirement for the completion of a P4B data report for the installation of mechanically assembled boiler external piping is not required. Witnessing of the pressure test required by the NBIC part 1, section 2, paragraph 2.10.2, is not required.
(2) Where applicable, the boiler installation must comply with R 408.30901 to R 408.30998; R 408.30701 to R 408.30796; and R 408.30801 to R 408.30880.
(3) The NBIC code, part 1, section 2, paragraph 2.4.4, is enforced by R 408.30701 to R 408.30796.
(4) The NBIC code, part 1, section 3, paragraph 3.6.1, is enforced by R 408.30901 to R 408.30998.

Notes

Mich. Admin. Code R. 339.5208
2023 MR 8, Eff. 5/3/2023