6 Miss. Code. R. 4-3.6 - Application Requirements
A. A certified copy
of the Resolution of Intent from the Applicant must be submitted. (All
Applicants must use the Public Notice Form provided by MDA.)
B. In order for MDA to consider eligibility
for a CAP loan, the Financial Analysis Worksheet must be completed, signed and
the original signed copy submitted in advance or along with the
application.
C. A letter on
official letterhead from the Applicant's certified public accountant, auditor
or fiscal officer verifying that the Applicant's financials reflect the ability
to repay the CAP loan. This verification must include the source of repayment
(i.e., surcharge or other verifiable means of repayment).
D. Certified Proof of Publication of the
required Public Notice of the Applicant to enter into a Loan Agreement with MDA
for CAP funds. The Resolution must be published once a week for at least four
(4) consecutive weeks in a newspaper having general circulation in the county.
The public hearing should take place after the date of the final publication.
The Resolution must have been published within the last 6 months prior to
submittal of the loan application.
E. Once the publication process is complete,
a certified copy of the minutes of the Applicant showing their decision to
proceed with the loan.
F. If
applicable, written verification that the Applicant has consulted with the
Public Service Commission regarding water and wastewater projects.
G. Fire Protection loans must be made to
enhance structural firefighting capabilities. Loans for fire trucks must
provide proof that the National Fire Protection Association standards are/will
be met.
H. If applicable, official
certification of preliminary project plans and specifications from the project
engineer and the operating railroad indicating that the project meets American
Railway Engineering and Maintenance-of way Association ("AREMA") and Federal
Railroad Administration ("FRA") standards and other necessary compliance
requirements.
I. If applicable, an
appraisal and two review appraisals, must be conducted no more than three
months prior to loan closing, on buildings and associated land to be
purchased.
J. Maps reflecting the
project location as well as detailing of the improvements.
K. Cost verifications must be on engineers'
or architects' original letterhead, signed and sealed by the firm's
representative.
L. Budget Sheet
breakdown of sources and uses of funds.
M. The Applicant's certified public
accountant, auditor or fiscal officer must furnish to MDA the most current
annual audit and the latest financial summary reflecting any additional
long-term debt or any changes in their financial position since the last annual
audit was prepared.
N. If two
separate local units of government jointly fund a project, the Applicants must
have an inter-local agreement with the Attorney General's approval.
O. If applicable, the Applicant must provide
an award letter or documentation verifying other funding sources.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.