6 Miss. Code. R. 4-4.5 - Application Requirements
The application must include the following:
A. A detailed description of the project and
narrative explaining how the specific improvements will affect economic
development and/or job creation in the area, together with supporting
documentation.
B.
Engineering/Architects Report: This should include a cost estimate and
timeline. Cost estimate must be submitted by an engineer or architect on their
letterhead as a signed and stamped original. The timeline should outline the
project construction from implementation to the completion of construction
.
C.
Budget Sheet
D. Memorandum of
Agreement.
E. Executed copy of the
Resolution of Authorization for DIP funds
F. Copy of building title and lease
(applicable if the project includes a building purchase construction, or
rehabilitation)
G. E-Verification
for the applicant and benefitting business
H. Detailed Map showing location of proposed
project. Maps must explicitly correspond to the proposed scope of activities
within this project.
I. The
applicant must submit one original of the application to MDA. Complete
application must be submitted with bottom tabbed dividers in between each
attachment. All documentation should have original signatures.
J. Applications can be mailed to: Mississippi
Development Infrastructure Program, Mississippi Development Authority,
Community Services Division, Post Office Box 849, Jackson, Mississippi. MDA
will evaluate the application to determine if the project meets program
criteria.