(2) The
repairs must meet the following requirements:
(A) Repairs to UST systems must be properly
conducted in accordance with a code of practice developed by a
nationally-recognized association or an independent testing laboratory.
1. The following codes and standards may be
used to comply with subsection (2)(A) of this rule:
A. National Fire Protection Association
Standard 30,
Flammable and Combustible Liquids Code, revised
2008. This document is incorporated by reference without any later amendments
or modifications. To obtain a copy, contact the National Fire Protection
Association, 1 Batterymarch Park, Box 9101, Quincy, MA 02269-9101, (617)
770-3000,
www.nfpa.org;
B. National Fire Protection Association
Standard 326,
Standard for the Safeguarding of Tanks and Containers for
Entry, Cleaning, or Repair, revised 2015. This document is
incorporated by reference without any later amendments or modifications. To
obtain a copy, contact the National Fire Protection Association, 1 Batterymarch
Park, Box 9101, Quincy, MA 02269-9101, (617) 770-3000,
www.nfpa.org;
C. American Petroleum Institute Publication
2200,
Repairing Crude Oil, Liquefied Petroleum Gas, and Product
Pipelines, revised 2001. This document is incorporated by reference
without any later amendments or modifications. To obtain a copy, contact the
American Petroleum Institute, 1220 L Street NW, Washington, DC 20005, (202)
682-8000,
www.api.org/stan-dards/;
D. American Petroleum Institute Standard
1631,
Interior Lining and Periodic Inspection of Underground Storage
Tanks, revised 2001. This document is incorporated by reference
without any later amendments or modifications. To obtain a copy, contact the
American Petroleum Institute, 1220 L Street NW, Washington, DC 20005, (202)
6828000,
www.api.org/standards/;
E. National Leak Prevention Association
Standard 631,
Spill Prevention, Minimum 10-Year Life Extension of
Existing Steel Underground Tanks by Lining Without the Addition of Cathodic
Protection, revised 1999. This standard may only be used for interior
lining application and inspection, not for integrity testing of the steel
shell. This document is incorporated by reference without any later amendments
or modifications. To obtain a copy, contact the National Leak Prevention
Association, (815) 301-2785,
www.nlpa-online.org; and
F. Fiberglass Tank and Piping Institute
T-95-1,
Remanufacturing of Fiberglass Plastic (FRP) Underground Storage
Tanks, Revised 1995. This document is incorporated by reference
without any later amendments or modifications. To obtain a copy, contact the
Fiberglass Tank and Piping Institute,
http://www.fiberglasstankandpipe.com;
(B) Repairs to
fiberglass-reinforced plastic tanks may be made by the manufacturer's
authorized representatives or in accordance with a code of practice developed
by a nationally-recognized association or an independent testing
laboratory;
(C) Metal pipe sections
and fittings that have released a regulated substance as a result of corrosion
or other damage must be replaced. For cathodically protected metal piping, the
entire length of electrically-continuous metal pipe must be replaced.
Non-corrodible pipes and fittings may be repaired in accordance with the
manufacturer's specifications;
(D)
Repairs must be done by a person who is properly registered with the Missouri
Department of Agriculture and who has a financial responsibility mechanism that
complies with the requirements of 2 CSR 9030.085;
(E) Repaired tanks and/or piping must be
tightness tested in accordance with release detection methods listed in
10 CSR
26-2.043(1)(D) and
10 CSR
26-2.044(1)(B) within thirty (30)
days following the date of the completion of the repair, unless tested using
another method determined by the department to be no less protective of human
health and the environment.
(F)
Repairs of UST systems, or any portion of a UST system, required to be
double-walled, must be tested to confirm the integrity of both walls of the
repaired tank or piping system within thirty (30) days following the completion
of any repair;
(G) Repairs to any
required containment sumps must be tested using a method specified in
10 CSR
26-2.035(1)(B) within thirty (30)
days following the completion of any repair;
(H) Within thirty (30) days following any
repair to spill or prevention equipment, the repaired spill or overfill
prevention equipment must be tested in accordance with
10 CSR
26-2.030 to ensure it is operating properly;
(I) Within six (6) months following the
repair of any cathodically protected UST system, the cathodic protection system
must be tested with the methods of operation and maintenance of corrosion
protection in
10 CSR 26-2.031(1)(B) and
(C) to ensure that it is operating properly.
Repair may include, but is not limited to, adjustments, maintenance,
replacement, or changes to cathodic protection equipment and/or tank
repairs;
(J) If a tank is repaired
by installation of an interior lining, the lining must be properly maintained
and inspected, in accordance with
10 CSR
26-2.021(3)(A), for the life of the
tank; and
(K) UST system owners and
operators must maintain records demonstrating compliance with this rule for
each repair for the remaining operating life of the UST system.