Nev. Admin. Code § 618.394 - Plan for erection or dismantling of tower crane: Submission; contents; maintenance on location; meeting for review
1. Except in an
emergency, at least 15 working days before a tower crane is erected or
dismantled, the prime contractor for the project which requires the use of a
crane to erect or dismantle a tower crane shall submit to the Enforcement
Section for its review a plan for the erection or dismantling of the tower
crane.
2. The plan required
pursuant to subsection 1 must set forth:
(a)
The recommendations of the manufacturer of the tower crane for the erection or
dismantling of the crane;
(b) The
weight of each component of the tower crane which must be lifted during the
erection or dismantling of the crane;
(c) A diagram of the riggings which shows the
points of attachment of the riggings to the crane and the size and capacity of
the hardware used to attach the riggings to the crane;
(d) Any point of potential interference
between the crane, the load and existing structures;
(e) Any special requirement for supporting
the outriggers and tracks of the crane, including a statement addressing any
conditions of the ground;
(f) A
study which shows:
(1) The location of the
crane which will be used to erect or dismantle the tower crane in plan and
profile view that specifically notes the locations of the initial lift and
final placement of the components of the tower crane;
(2) The configuration of the boom,
counterweights and attachments for the lift of each component; and
(3) The maximum lifting capacity of the crane
as specified on the load rating chart of the crane and the actual weight of the
anticipated loads;
(g) A
description of the sequence of steps to be followed to erect or dismantle the
tower crane and any special requirements for the safe execution of each
step;
(h) The procedure for
communication and assignment of responsibility among:
(1) The members of the crew which erects or
dismantles the tower crane;
(2) The
person who supervises the erection or dismantling of the tower crane;
and
(3) The operator of the tower
crane and the operators of any machinery which is required to erect or
dismantle the tower crane;
(i) A description of the manner in which the
clear zone required pursuant to NAC
618.397 will be
maintained;
(j) The name of any
person who will operate the tower crane or any other crane used to erect or
dismantle the tower crane;
(k) A
copy of the certificate of operation of each crane used to erect or dismantle
the tower crane ; and
(l) A copy of
any instructions provided by the manufacturer of the tower crane being erected
or dismantled in which the manufacturer describes the sequence of steps to be
followed to safely erect or dismantle the tower crane.
3. A copy of the plan required pursuant to
subsection 2 must be maintained at the location where the tower crane is
erected or dismantled.
4. The prime
contractor shall ensure that a meeting is conducted at the location where the
tower crane will be erected or dismantled immediately before the tower crane is
erected or dismantled to review the plan and the manner in which a clear zone
will be established. The following persons shall attend the meeting:
(a) The members of the crew which erects or
dismantles the tower crane;
(b) The
person who supervises the erection or dismantling of the tower crane;
(c) The operator of the tower crane and the
operators of any machinery which is required to erect or dismantle the tower
crane;
(d) A representative of the
prime contractor;
(e) A
representative of the owner of the tower crane, if the owner of the tower crane
is not already represented at the meeting; and
(f) A representative of the owner or lessee
of the property upon which the tower crane will be erected or
dismantled.