N.J. Admin. Code § 7:7A-16.8 - Additional requirements specific to an application for authorization under a general permit
(a) In addition to the requirements at
N.J.A.C. 7:7A-16.2
and
16.7, an application for authorization under a general permit
shall meet the requirements of this section.
(b)An application for authorization under a
general permit shall include the following:
1. A line delineation LOI issued under
N.J.A.C. 7:7A-4.4
or a
line verification LOI issued under N.J.A.C.
7:7A-4.5
, if an LOI of either type
has been issued. A presence/absence LOI issued under N.J.A.C.
7:7A-4.3
is not sufficient. If no
LOI has been issued, or if only a presence/absence LOI has been issued, the
application shall include all information required for an application for a
line delineation LOI or line verification LOI, covering the portion of the site
that will be affected by the general permit activity;
2. The total area, in acres, of wetlands and
State open waters on the site before the regulated activity is performed, and
the total area, in acres, of wetlands and State open waters on the site that
will remain after the regulated activity is performed. The total area of
wetlands and State open waters on the site can be approximated using a
planimeter or other mapping technique;
3. Documentation regarding when the lot that
is the subject of the general permit was created by subdivision;
4. A history of the ownership of the property
beginning June 30, 1988, to present;
5. A listing of contiguous lots that were in
common ownership with the lot on which the activities are proposed and the
ownership history of each lot beginning June 30, 1988, to present;
and
6. A compliance statement that
shall:
i. Demonstrate that the proposed
activity or project satisfies the requirements of the applicable general
permit;
ii. Demonstrate that the
proposed activity or project satisfies the requirements at
N.J.A.C.
7:7A-5.7; and
iii. Describe the characteristics of the site
and the location of all proposed regulated activities, potential impacts from
the construction process, and, as applicable, any monitoring or reporting
methods that will be used.
(c) An application for a general permit
authorization for regulated activities in an area under the jurisdiction of the
Pinelands Commission shall be submitted to the Pinelands Commission rather than
to the Department.