N.M. Admin. Code § 19.15.16.10 - CASING AND TUBING REQUIREMENTS
A.
The operator shall equip a well drilled for oil or gas with surface and
intermediate casing strings and cement as may be necessary to effectively seal
off and isolate all water-, oil- and gas-bearing strata and other strata
encountered in the well down to the casing point. In addition, the operator
shall equip a well completed for oil or gas production with a string of
properly cemented production casing at sufficient depth to ensure protection of
oil- and gas-bearing strata encountered in the well, including the strata to be
produced.
B. The operator shall use
sufficient cement on surface casing to fill the annular space behind the casing
to the top of the hole, provided that authorized division field personnel may
allow exceptions to this requirement when known conditions in a given area
render compliance impracticable.
C.
Cementing shall be by pump and plug method unless the division expressly
authorizes some other method.
D.
Cementing shall be with conventional-type hard-setting cements to which the
operator has added additives (lighteners, densifiers, extenders, accelerators,
retarders, etc.) to suit conditions in the well.
E. Authorized division field personnel may,
when conditions warrant, allow exceptions to Subsection D of
19.15.16.10 NMAC and permit the
operator to use oil-base casing packing material in lieu of hard-setting
cements on intermediate and production casing strings; provided that when the
operator uses such materials on the intermediate casing string, the operator
places conventional-type hard-setting cements throughout all oil- and
gas-bearing zones and throughout at least the lowermost 300 feet of the
intermediate casing string. When the operator uses such materials on the
production casing string, the operator shall place conventional-type
hard-setting cements throughout all oil- and gas-bearing zones that shall
extend upward a minimum of 500 feet above the uppermost perforation or, in the
case of an open-hole completion, 500 feet above the production casing
shoe.
F. The operator shall test
casing strings and prove satisfactory as provided in Subsection I of
19.15.16.10 NMAC.
G. After cementing, but before commencing
tests Subsection I of
19.15.16.10 NMAC requires, all
casing strings shall stand cemented in accordance with one of the options in
Paragraphs (1) and (2) of Subsection G of
19.15.16.10 NMAC. Regardless of
which option the operator chooses, the casing shall remain stationary and under
pressure for at least eight hours after the operator places the cement. Casing
shall be under pressure if the operator uses some acceptable means of holding
pressure or if the operator employs one or more float valves to hold the cement
in place. The operator shall either
(1) allow
casing strings to stand cemented a minimum of 18 hours prior to commencing
tests; an operator using this option shall report on form C-103 the actual time
the cement was in place before the operator initiated tests; or
(2) in the counties of San Juan, Rio Arriba,
McKinley, Sandoval, Lea, Eddy, Chaves and Roosevelt only, allow casing strings
to stand cemented until the cement reaches a compressive strength of at least
500 psi in the "zone of interest" before commencing tests; provided however,
that the operator shall not commence tests until the cement is in place for at
least eight hours.
(a) The "zone of interest"
for surface and intermediate casing strings is the bottom 20 percent of the
casing string, but is no more than 1000 feet nor less than 300 feet of the
bottom-part of the casing unless the casing is set at less than 300 feet. The
"zone of interest" for production casing strings includes the interval or
intervals where immediate completion is contemplated.
(b) To determine that a minimum compressive
strength of 500 psi has been attained, the operator shall use the typical
performance data for the particular cement mix used in the well, at the minimum
temperature indicated for the zone of interest by Figure 107-A, Temperature
Gradient Curves. Typical performance data used shall be that data the cement
manufacturer or a competent materials testing agency furnishes, as determined
in accordance with the latest edition of API publication Recommended Practice
for Testing Well Cements, RP 10B-2.
(See Temperature Gradient - Page 17A)
H. An operator using the
compressive strength criterion in Paragraph (2) of Subsection G of
19.15.16.10 NMAC shall report the
following information on form C-103:
(1)
volume of cement slurry in cubic feet and brand name of cement and additives,
percent additives used and sequence of placement if the operator uses more than
one type cement slurry;
(2)
approximate temperature of cement slurry when mixed;
(3) estimated minimum formation temperature
in zone of interest;
(4) estimate
of cement strength at time of casing test; and
(5) actual time cement in place prior to
starting test.
I. The
operator shall test casing strings except conductor pipe after cementing and
before commencing other operations on the well. The operator shall file form
C-103 with the division for each casing string reporting the grade and weight
of pipe used. In the case of combination strings utilizing pipe of varied
grades or weights, the operator shall report the footage of each grade and
weight used. The operator shall also report results of the casing test,
including actual pressure held on pipe and the pressure drop observed on the
same form C-103.
(1) The operator shall
pressure test casing strings in wells drilled with rotary tools. Minimum casing
test pressure shall be approximately one-third of the manufacturer's rated
internal yield pressure except that the test pressure shall not be less than
600 psi and need not be greater than 1500 psi. In cases where combination
strings are involved, the above test pressure shall apply to the lowest
pressure rated casing used. The operator shall apply test pressures for a
period of 30 minutes. If a drop of more than 10 percent of the test pressure
occurs the casing shall be considered defective and the operator shall apply
corrective measures.
(2) The
operator may test casing strings in wells drilled with cable tools as outlined
in Paragraph (1) of Subsection I of
19.15.16.10 NMAC, or by bailing
the well dry in which case the hole shall remain satisfactorily dry for a
period of at least one hour before the operator commences further operations on
the well.
J. Well tubing
requirements.
(1) The operator shall tube
flowing oil wells equipped with casing larger in size than 2 7/8-inch
OD.
(2) The operator shall tube gas
wells equipped with casing larger in size than 31/2-inch OD.
(3) The operator shall set tubing as near the
bottom as practical and tubing perforations shall not be more than 250 feet
above top of pay zone.
(4) The
district supervisor of the appropriate division district office, upon
application, may grant exceptions to these requirements, provided waste will
not be caused.
(5) The district
supervisor may request that the director review an application. The operator
shall submit information and give notice as the director requests. The division
may approve un-protested applications after 20 days of receipt of the
application and supporting information. If a person protests the application,
or the director decides, the division shall set the application for
hearing.