N.M. Admin. Code § 19.15.16.14 - DEVIATION TESTS AND WELLBORE SURVEYS; VERTICAL, DEVIATED AND DIRECTIONAL WELLS
A.
Vertical and deviated well bores.
(1)
Deviation tests required. An
operator shall test a vertical or deviated well that is drilled or deepened at
reasonably frequent intervals to determine the deviation from the vertical. The
operator shall make the tests at least once each 500 feet or at the first bit
change succeeding 500 feet. The operator shall file with the division along
with its form C-104 a tabulation of deviation tests run that is sworn to and
notarized.
(2)
Excessive
deviation. When the deviation averages more than five degrees in a
500-foot interval, the operator shall include the calculations of the hole's
maximum possible horizontal displacement. When the maximum possible horizontal
displacement exceeds the distance to the appropriate unit's nearest outer
boundary line the operator shall run a directional survey to establish the
location of the well's completed interval.
(3)
Unorthodox well locations.
If the results of the directional survey of a vertical or deviated well
indicate that the completed interval is more than 50 feet from the approved
surface location and closer than the minimum setback requirements to the
applicable unit's outer boundary, then the well is considered unorthodox. To
obtain authority to produce the well, the operator shall file an application
with the division's Santa Fe office, and shall follow the process outlined in
Subsection C of
19.15.15.13 NMAC to obtain
approval of the unorthodox well location.
(4)
Directional survey
requirements. Upon the director's request, the operator shall
directionally survey a vertical or deviated well. The operator shall file
directional surveys run on a well, in division-approved format, with the
division upon the well's completion. The division shall not approve a form
C-104 for the well until the operator has filed the directional
surveys.
B.
Directional well bores.
(1)
Directional drilling. The appropriate division district office may
grant a permit to directionally drill a well bore if every point of the
completed interval is projected to be located at a distance greater than or
equal to the minimum setback distance from the applicable spacing unit's outer
boundaries or at an unorthodox well location the division previously
approved.
(2)
Unorthodox well
locations. If all or part of a directional well's completed interval is
projected to be located less than the minimum distance from the outer boundary
of the well's spacing unit, the well's location is considered unorthodox. To
obtain approval for the well's location, the operator shall file an application
in the division's Santa Fe office in accordance with Subsection C of
19.15.15.13 NMAC.
(3)
Directional surveys
required. An operator shall run a directional survey on each well
drilled pursuant to Subsection B of
19.15.16.14 NMAC. The operator
shall file a directional survey, in division-approved format, with the division
upon the well's completion. The division shall not approve a form C-104 for the
well until the operator files the directional survey. The well's location will
be considered unorthodox if the directional survey indicates that part of a
well's completed interval, as drilled, is located more than 50 feet from its
projected location and closer to an outer boundary of the spacing unit than
applicable minimum setback distance. For previously approved unorthodox well
locations, the well's as-drilled location is unorthodox if the directional
survey indicates that any part of the completed interval is located more than
50 feet (or, if less, twenty-five percent of the previously authorized
distance) closer to the outer boundary of the spacing unit than the approved
location.
C.
Directional survey specifications. Directional surveys that
19.15.16.14 NMAC requires shall
have shot points no more than 200 feet apart and shall be run by competent
surveying companies. The division shall allow exceptions to the minimum shot
point spacing provided the survey's accuracy is still within acceptable
limits.
Notes