N.M. Admin. Code § 19.2.100.53 - COMMINGLING AND OFF-LEASE STORAGE OF OIL AND GAS ON STATE TRUST LANDS
A. Commingling
prohibited: Unless approved pursuant to Subsection B of
19.2.100.53 NMAC, the commingling,
confusion or the intercommunication of oil or gas production from any state
well with any production from any other well, whether state or non-state, by
the use of common tankage facilities or central delivery points, is strictly
prohibited.
B. Commingling allowed -
off-lease storage:
(1) Commingling of oil and
gas production, including downhole commingling, if properly metered or
allocated and accounted for, may be permitted within the discretion of the
commissioner only after the commissioner's receipt of a written application
containing the information specified in Subsection C of
19.2.100.53 NMAC and an
application fee as set forth in the schedule of fees.
(2) Off-lease storage of production may be
permitted if properly metered or allocated and accounted for, within the
discretion of the commissioner only after the commissioner's receipt of a
written application containing the information specified in Subsection C of
19.2.100.53 NMAC and an
application fee as set forth in the schedule of fees.
C. Application for permission to commingle or
off-lease store production. Applications for permission to commingle or
off-lease store production shall be directed to the commissioner and shall
include:
(1) formal application stating the
type of permission desired and the reasons therefor, accompanied by an
application fee as set forth in the schedule of fees;
(2) plat showing the location of leases,
wells, flow lines, metering facilities and common tankage. All plats and
diagrams should differentiate between surface and underground pipe;
(3) a list of the involved leases arranged by
their state land office lease number, their legal description and including
state beneficiaries;
(4) a
designation of the pool from which each well produces;
(5) an economic analysis of proposed
operation showing profit or loss to the state of New Mexico;
(6) schematic diagram of entire system from
production manifold to pipeline connection showing position of all components
of flow stream;
(7) description of
the operating sequence explaining the complete operation;
(8) the applicant's proposal for allocating
or metering production so that all production is properly accounted for at the
well; and
(9) any other pertinent
data that will assist the commissioner in deciding upon the
application.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.