N.M. Admin. Code § 19.8.35.8 - SUBMISSION AND PROCESSING OF REQUESTS FOR VER DETERMINATIONS
A. The director
will be responsible for making a determination on valid and existing rights for
lands protected under
19.8.2.201 NMAC, with the
exception of federal lands in protected features listed in Subsection F of
19.8.2.201 NMAC. A determination
on valid existing rights not subject to the review of the director would be the
responsibility of OSM.
B. A request
for a valid and existing right must be submitted to the director, consistent
with the provisions of Subsection A of
19.8.35.8 NMAC, if the request
concerns the operation of a surface coal mine on the basis of valid existing
rights under
19.8.2.201 NMAC or wish to confirm
the right to do so. This request may be submitted before preparing and
submitting an application for a permit or boundary revision for the
land.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.