Or. Admin. Code § 340-272-0420 - Site Visits
(1) Verification
services must include site visit(s) that meet the requirements of this
rule.
(2) Site visit(s) conducted
as part of verification services for verification of CFP reports and fuel
pathway applications submitted under OAR chapter 340, division 253 must meet
the requirements of this section:
(a) Site
visits must occur after all data and CFP reports for the previous calendar year
have been attested to and submitted to DEQ, except that a site visit may be
conducted as part of a quarterly review if:
(A) No aspects of the data management systems
or accounting practices change following the site visit; and
(B) There are no significant changes to the
fuel production process or facility when the verification is for an annual fuel
pathway report;
(b) At
least one DEQ-approved lead verifier on the verification team, including the
sector specific verifier, if applicable, must at a minimum make one site visit
to each facility during each year full verification is required under OAR
340-272-0100(4).
If the responsible entity keeps records supporting a report or fuel pathway
application subject to verification under this division in a location that is
different from the fuel production facility, then such verifier(s) must at a
minimum make one site visit to the location where those records are
stored;
(c) A separate site visit
is required if a responsible entity elects to engage the services of a
verification body to provide verification services for validation of a fuel
pathway application;
(d) For
aggregators and network service providers for electric vehicle supply
equipment, the verifier(s) must make at least one site visit to the location
where the aggregator's records are stored. Additional site visits to the
entities using an aggregator are to be performed at the verifier's discretion
and must follow the requirements for sampling outlined in OAR
340-272-0425; and
(e) The following must be conducted during a
site visit:
(A) Review supporting evidence
used to develop CFP reports submitted to DEQ;
(B) Review and understand the data management
systems and accounting practices used by the responsible entity to acquire,
process, track, and report CFP data. Evaluate the uncertainty and effectiveness
of these systems; and
(C) Carry out
tasks that, in the professional judgment of the verification team, are needed
in the verification process, including the following, at minimum:
(i) Conduct interviews with key personnel,
such as process engineers, metering experts, accounting personnel, and project
operators, as well as staff involved in compiling data and preparing the CFP
reports;
(ii) Make direct
observations of production equipment, confirming diagrams for processes,
piping, and instrumentation; measurement system equipment; and accounting
systems for data types determined in the sampling plan to be high
risk;
(iii) Assess conformance with
measurement accuracy, data capture, temporary measurement method requirements,
and the monitoring plan for consistency with the requirements of OAR chapter
340, division 253; and
(iv) Review
financial transactions to confirm complete and accurate reporting.
(3) Site
visit(s) conducted as part of verification services for verification of GHG
Reporting Program emissions data reports submitted under OAR chapter 340,
division 215 must meet the requirements of this section:
(a) Site visits must occur after all data and
emissions data reports for the previous calendar year have been attested to and
submitted to DEQ;
(b) At least one
approved verifier in the verification team, including the sector specific
verifier, if applicable, must at a minimum make one site visit to each facility
for which an emissions data report is submitted during each year full
verification is required under OAR
340-272-0100(4).
The headquarters or other location of central data management must be visited
when the responsible entity is an electricity supplier or fuel supplier,
including natural gas suppliers; and
(c) The following must be conducted during a
site visit:
(A) Check that all sources
specified under OAR 340-215-0030, as applicable to
the responsible entity are identified appropriately;
(B) Review and understand the data management
systems used by the responsible entity to track, quantify, and report
greenhouse gas emissions and, when applicable, electricity and fuel
transactions. Evaluate the uncertainty and effectiveness of these systems;
and
(C) Carry out tasks that, in
the professional judgment of the verification team, are needed in the
verification process, including the following, at minimum:
(i) Conduct interviews with key personnel,
such as process engineers and metering experts, as well as staff involved in
compiling data and preparing the emissions data report;
(ii) Make direct observations of equipment
for data sources and equipment supplying data for sources determined in the
sampling plan to be high risk;
(iii) Assess conformance with measurement
accuracy, data capture, and missing data substitution requirements for
consistency with the requirements of OAR chapter 340, division 215, as
applicable; and
(iv) Review
financial transactions to confirm fuel and electricity purchases and sales, and
to confirm the complete and accurate reporting of required data such as
facility fuel suppliers, fuel quantities delivered, and the entity from which
fuel was received.
Notes
Statutory/Other Authority: ORS 468.020, 468A.050, 468A.266, 468A.271, 468A.277 & 468A.280
Statutes/Other Implemented: ORS 468A.010, 468A.015, 468A.050, 468A.265 - 468A.277 & 468A.280