Or. Admin. Code § 629-630-0920 - Small Forestland Owner Minimum Option; Harvesting on Features Identified in the Slopes Model and Stream Adjacent Failures
(1) Western
Oregon, Designated Debris Flow Traversal Areas for harvest type 1, harvest type
2 or harvest type 3 operations. For forestlands in Western Oregon that are
managed under the small forestland owner minimum option, operators shall not
harvest timber within 50 percent of the length of the designated debris flow
traversal area for each harvest type 1, harvest type 2, or harvest type 3 unit.
The State Forester will:
(a) Assist small
forestland owners in determining designated debris flow traversal areas in a
planned harvest unit, prioritizing vegetation retention requirements for Type
SSBT streams over Type F streams.
(b) Exempt small forestland owners from the
designated debris flow traversal areas requirements for harvest type 4
units.
(2) Operators
shall retain all trees within 25 feet slope distance on either side of the
active channel identified in OAR
629-630-0920(1),
or center of the draw if no channel is present for areas identified by the
slopes model as designated debris flow traversal areas.
(3) Changes in stream classification for a
stream, based on field surveys for fish-use consistent with OAR
629-635-0200, shall not change
the department's maps used for notifications of operations that identify
designed debris flow traversal areas.
(4) Operators shall submit a written plan,
described in OAR 629-630-0925, for timber harvest
units containing designated debris flow traversal areas, except for harvest
type 4 units.
(5) Cable yarding,
which may require cutting, but not removal, of trees, is permitted through
designated debris flow traversal areas, but the number, size, and location of
yarding corridors shall be designed to minimize impacts to the integrity of
designated debris flow traversal areas. The operator shall not remove trees cut
for yarding corridors unless these are deemed safety hazards.
(6) Western Oregon, Designated Sediment
Source Areas. For forestlands in Western Oregon that are managed under the
small forestland owner minimum option, landowners are exempt from the rule
requirements for timber harvesting in designated sediment source areas and
slope retention areas.
(7)
Statewide, Stream Adjacent Failures. Operators shall extend the riparian
management areas, described in OAR
629-643-0100 and OAR
629-643-0120, on all identified
stream adjacent failures, as defined in OAR
629-600-0100. The riparian
management area shall encompass the perimeter of the stream adjacent failure,
defined in OAR 629-600-0100, however, the width
of the riparian management area shall only extend to the lesser of:
(a) The distance of 30 feet from the outer
edge of the small forestland owner minimum option; or
(b) The distance to the slope break, defined
as 20 percent or greater reduction in slope gradient.
(8) The landowner representative shall submit
a written plan, described in OAR
629-605-0170(13),
for timber harvest units where yarding is planned to occur within stream
adjacent failures.
(9) The
landowner shall submit a written plan that describes how the number, size, and
location of yarding corridors were selected to minimize impacts to the
integrity of stream adjacent failures.
(10) Cable yarding, which may require
cutting, but not removal, of trees, is permitted through stream adjacent
failures, but the number, size, and location of yarding corridors shall
minimize impact to the integrity of the feature. The operator shall not remove
trees cut for yarding corridors unless these are deemed safety
hazards.
(11) The operator shall
make all riparian management area width measurements using the slope distance
and shall measure them from the edge of the active channel or channel migration
zone.
(12) The department shall
publish Forest Practices Technical Guidance to assist operators in identifying
channel migration zones.
Notes
Statutory/Other Authority: ORS 527.710, Section 2(1), Chapter 33, Oregon Laws 2022
Statutes/Other Implemented: ORS 527.715, 527.765, Section 2(2), Chapter 33, Oregon Laws 2022, Section (10), Chapter 33, Oregon Laws 2022
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.