Or. Admin. Code § 690-217-0020 - Requirements and Due Dates for Pump Tests
(1) For water right applications received on
or after December 20, 1988, a pump test as described in OAR 690-217-0005 to
690-217-0055 is required before a certificate of water right will be issued.
The results of the test shall be submitted on the pump test report
form.
(2) For water right permits
or certificates with priority dates before December 20, 1988, a pump test as
described in OAR 690-217-0005 to 690-217-0055 and subsequent pump test
requirements every ten years shall be waived unless required by the Director .
The Director may require pump tests as provided in ORS
537.772 in specific cases or
areas as determined to be necessary. Such areas may include, but are not
limited to, critical ground water areas or serious water management problem
areas as defined in OAR
690-085-0020.
(3) If a landowner owns multiple wells
producing from the same aquifer and has tested one of those wells, he may
request exemptions for all other of those wells which are within five miles of
the tested well and which produce water from the same aquifer. If a well is
more than five miles from the tested well, or produces from a different
aquifer, it must be tested separately. Requests for exemptions shall be in
writing and include water well reports or other documentation showing the water
producing zones for each well.
(4)
In cases where a well provides the source of water for more than one water
right permit or certificate, it shall be indicated on the pump test report that
the pump test applies to multiple water rights. The permit or certificate
numbers of all the water rights the pump test applies to shall be listed on the
pump test report .