Or. Admin. Code § 860-023-0151 - Annual Report on Electric Reliability
(1) On or before May 1 of each year, an
electric company must file with the Commission a report that includes the
information set forth in section (2) of this rule for the reporting period. The
electric company must file the report in electronic form. The electric company
must make electronic copies of the report available to the public upon request.
For paper copies requested by the public, the electric company may charge a
reasonable cost for production of the copy.
(2) The annual Electric Service Reliability
Report must contain:
(a) The results of the
calculated SAIDI, SAIFI, and MAIFIE indices required by OAR
860-023-0111. The electric
company must also report this information on a system-wide basis compared with
the previous four years' performance, and on a reliability reporting area basis
compared with the previous four years' performance.
(b) A summary of system-wide and reliability
reporting area sustained interruption causes compared to the previous four-year
performance. Cause categories to be evaluated include:
(A) Loss of Supply - Transmission;
(B) Loss of Supply - Substation;
(C) Distribution - Equipment;
(D) Distribution - Lightning;
(E) Distribution - Planned;
(F) Distribution - Public;
(G) Distribution - Vegetation;
(H) Distribution - Weather (other than
lightning);
(I) Distribution -
Wildlife;
(J) Distribution -
Unknown; and
(K) Distribution -
Other.
(c) A listing of
the Major Events experienced during the reporting period, including reliability
reporting area involved; operating areas involved; dates involved; TMED
applied; interruption causes; and SAIDI, SAIFI, and CAIDI impacts to customers
for the Event on both a reliability reporting area basis and a system-wide
basis.
(d) A listing of the TMED
values that will be used for each reliability reporting area for the
forthcoming annual reporting period compared with the previous four years of
TMED values.
(e) A summary of the
characteristics of the systems covered under OAR
860-023-0091(4)
and estimation methodologies covered by OAR
860-023-0101(3)
and 860-023-0111(3)
for the collection of interruption data, calculation of reliability
information, and facilitation of interruption restoration and mitigation.
(f) A summary addressing the
changes that the electric company has made or will make in the collection of
data and the calculation, estimation, and reporting of reliability information.
The electric company must explain why the changes occurred and explain how the
change affects the comparison of newer and older information.
(g) A map showing the reliability reporting
areas and operating- areas.
(h) A
listing of circuits by reliability reporting area and substation, indicating
circuit voltage and number of customers connected.
(3) This rule is effective beginning January
1, 2012.
Notes
Stat. Auth.: ORS 183, 756 & 757
Stats. Implemented: ORS 757.020