25 Pa. Code § 105.231 - Permit applications for construction or modification of channel changes and dredging for facility construction and maintenance
(a)
Construction or modification of
channel changes. Construction or modification of channel changes
includes the following:
(1) In addition to the
information required by §
105.13 (relating to permit
applications-information and fees), permit applications under this subchapter
for the construction or modification of channel changes shall contain the
following information:
(i) The location and
length of the proposed channel change.
(ii) A stream profile for a reasonable
distance upstream and downstream of the proposed change, showing bed slopes,
normal water surface and depths, flood water surfaces, existing obstructions
and the location of public and industrial water supply intake.
(iii) Cross-channel sections necessary to
indicate the scope of the proposed work.
(iv) Estimates of flood frequencies and flood
flows at the site of the proposed channel change, including information
reasonably available regarding actual rainfall and flood flow records on the
stream.
(v) A description of the
purposes of the proposed channel change.
(vi) A plan for the disposal of excavated
material.
(vii) Proof of title or
adequate flowage and other easements for lands included in the site of the
proposed channel change.
(2) The Department may require additional
information or waive one or more of the requirements of paragraph (1) in
specific cases.
(b)
Dredging. Dredging includes the following:
(1) In addition to the information required
by § 105.13, permit applications for dredging for facility construction
and maintenance under this subchapter shall contain the following information:
(i) The location and area of the proposed
dredging.
(ii) A stream profile for
a reasonable distance upstream and downstream of the proposed dredging showing
normal water surface and depths.
(iii) A description of the equipment to be
employed in the dredging operation and a plan for the disposal of the dredge
soil.
(iv) Proof of title or
easements for lands included in the site of the proposed dredging.
(2) The Department may require
additional information or waive one or more of the requirements of paragraph
(1) in specific cases.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.