25 Pa. Code § 77.526 - Treatment facilities
(a) At a
minimum, facilities and measures for treating discharges from disturbed areas
shall be designed, constructed and maintained to treat the runoff from a
10-year, 24-hour precipitation event and groundwater contribution. Treatment
facilities for process water shall be adequate to treat the total volume of
process water plus additional water contribution to the system. Facilities and
measures for treating discharges shall be based on good engineering
design.
(b) The design, construction
and maintenance of a treatment facility does not relieve an operator of the
responsibility to comply with effluent standards as provided for in §
77.522 (relating to effluent
standards).
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.