(a) Preblasting
surveys will not be required if blasting is designed and conducted below the
levels of blasting vibration shown on Figure # 1 at the nearest dwelling,
school, church, commercial or institutional building neither owned nor leased
by the operator. If preblasting surveys are not conducted, the operator shall
provide a seismograph record including both the particle velocity time-history
(wave form) and the particle velocity and vibration frequency levels for each
blast.
(1) The vibration frequency shall be
displayed and analyzed over the frequency range of 2 Hz through 100
Hz.
(2) The permittee shall obtain
Department approval of the analytical method used to determine the predominant
frequency before applying this alternative criterion.
(3) If an operator who has not offered
preblasting surveys, blasts at a level exceeding the levels of vibration in
Figure #1, no additional blasting may be conducted until one of the following
applies:
(i) The operator meets the
requirements of subsections (b)-(e).
(ii) The operator demonstrates that
subsequent blasting will produce vibrations at levels below the levels of
blasting vibration shown in Figure #1.
Click to view image
Figure # 1.-Levels of blasting vibration using
a combination of velocity and
frequency.
(b) If the operator intends to conduct
blasting at vibration levels exceeding the levels of vibration in Figure # 1 at
the nearest dwelling, school, church, commercial or institutional building
neither owned nor leased by the operator, the operator shall offer preblasting
surveys. At least 30 days before commencement of blasting or resumption of
blasting in accordance with §
77.562(a)(3)(i)
the operator shall notify, in writing, the residents or owners of dwellings or
other structures located within 1,000 feet (304.8 meters) of the area where
blasting will occur of their right to request a preblasting survey and how to
request a preblasting survey. On the request to the Department or operator by a
resident or owner of a dwelling or structure that is located within 1,000 feet
(304.8 meters) of the area where blasting will occur, the operator shall
promptly conduct a preblasting survey of the dwelling or structure. If a
dwelling or structure is renovated or added to subsequent to a preblasting
survey, then, upon request by the resident or owner to the Department or
operator, a survey of the additions and renovations shall be performed by the
operator in accordance with this section. The operator shall provide the
Department with a copy of the request.
(c) The survey shall determine the condition
of the dwelling or structure and document preblasting damage and other physical
factors that could reasonably be affected by the blasting. Assessments of
structures such as pipes, cables, transmission lines and wells and other water
systems shall be limited to surface condition and readily available data.
Preblasting conditions of wells and other water systems used for human, animal
or agricultural purposes shall be ascertained to the extent possible regarding
the quantity and quality of the water.
(d) A written report of the survey shall be
prepared and signed by the person who conducted the survey. The report may
include recommendations of special conditions or proposed adjustments to the
blasting procedure which should be incorporated into the blasting plan to
prevent damage. Copies of the report shall be provided promptly to the person
requesting the survey and to the Department.
(e) Required preblasting surveys requested
more than 10 days before planned initiation of blasting shall be completed by
the operator before the commencement of blasting.
Notes
The
provisions of this § 77.562 adopted March 16, 1990, effective
3/17/1990, 20 Pa.B. 1643;
amended January 30, 1998, effective 1/31/1998, 28 Pa.B. 619.
Amended by
Pennsylvania
Bulletin, Vol 53, No. 33. August 19, 2023, effective
8/19/2023
This section cited in 25 Pa. Code §
77.108 (relating to permit for
small noncoal operations); 25 Pa. Code §
77.453 (relating to blasting
agent); 25 Pa. Code §
77.463 (relating to surface mining
near underground mining); 25 Pa. Code §
77.561 (relating to general
requirements); and 25 Pa. Code §
77.564 (relating to surface
blasting requirements).