25 Pa. Code § 78a.88 - Mechanical integrity of operating wells
(a) Except for wells that have been granted
inactive status, the operator shall inspect each operating well at least
quarterly to ensure it is in compliance with the well construction and
operating requirements of this chapter and the act. The results of the
inspections shall be recorded and retained by the operator for at least 5 years
and be available for review by the Department and the coal owner or
operator.
(b) At a minimum,
inspections shall determine:
(1) The
well-head pressure or water level measurement.
(2) The open flow on the annulus of the
production casing or the annulus pressure if the annulus is shut in.
(3) If there is evidence of gas escaping from
the well and the amount escaping, using measurement or best estimate of
quantity.
(4) If there is evidence
of progressive corrosion, rusting or other signs of equipment
deterioration.
(c) For
structurally sound wells in compliance with §
78a.73(e)
(relating to general provision for well construction and operation), the
operator shall follow the reporting schedule outlined in subsection
(e).
(d) For wells exhibiting
progressive corrosion, rusting or other signs of equipment deterioration that
compromise the integrity of the well, or the well is not in compliance with
§
78a.73(e), the
operator shall immediately notify the Department and take corrective actions to
repair or replace defective equipment or casing or mitigate the excess pressure
on the surface casing seat or coal protective casing seat according to the
following hierarchy:
(1) The operator shall
reduce the shut-in or producing back pressure on the casing seat to achieve
compliance with §
78a.73(e).
(2) The operator shall retrofit the well by
installing production casing to reduce the pressure on the casing seat to
achieve compliance with §
78a.73(e). The
annular space surrounding the production casing must be open to the atmosphere.
The production casing shall be either cemented to the surface or installed on a
permanent packer. The operator shall notify the Department at least 7 days
prior to initiating the corrective measure.
(3) Additional mechanical integrity tests,
including, but not limited to, pressure tests, may be required by the
Department to demonstrate the integrity of the well.
(e) The operator shall submit an annual
report to the Department identifying the compliance status of each well with
the mechanical integrity requirements of this section. The report shall be
submitted on forms prescribed by, and available from, the Department or in a
similar manner approved by the Department.