25 Pa. Code § 89.163 - Performance standards

(a) In situ processing shall be conducted in accordance with the performance standards and design criteria of this chapter.
(b) In addition, in situ processing shall be conducted to prevent flow of the process recovery fluid:
(1) Horizontally beyond the affected area identified in the permit.
(2) Vertically into overlying or underlying acquifers.
(c) The operator shall restore the quality of affected groundwater above and below the production zone, to the approximate premining levels or better, to ensure that the potential use is not diminished.

Notes

25 Pa. Code § 89.163
The provisions of this § 89.163 adopted February 17, 1984, 14 Pa.B. 524, effective 8/4/1984, 14 Pa.B. 2860.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.