25 Pa. Code § 89.37 - Existing structures
(a) The
operation plan shall contain a description of each existing structure proposed
to be used in connection with or to facilitate the mining operation. The
description shall include the following:
(1)
Location.
(2) Current
condition.
(3) A demonstration that
the structure is in compliance with the performance standards of this
chapter.
(b) The operation
plan shall describe how each noncomplying existing structure will be modified
or reconstructed to comply with the design and performance standards of this
chapter. The description shall include the following:
(1) Design specifications for the
modification or reconstruction of the structure.
(2) A construction schedule.
(3) Provisions for monitoring the structure
during and after modification or reconstruction.
(4) A showing that the risk of harm to the
environment or to public health or safety is not significant during the period
of modification or reconstruction.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.