25 Pa. Code § 89.55 - Collection channels
(a) A channel
or ditch that is used to collect or transport waters, or both, into wastewater
treatment facilities shall be constructed to safely pass the peak runoff from a
precipitation event with a 10-year recurrence interval, or a larger event as
specified by the Department.
(b)
Channel design shall incorporate:
(1) Channel
linings to safely pass the design velocities.
(2) Adequate freeboard.
(3) Energy dissipators when necessary.
Notes
This section cited in 25 Pa. Code § 89.173 (relating to performance standards).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.