Chapter 74:56:01 - Underground storage tanks (UST)
- § 74:56:01:01 - Definitions
- § 74:56:01:02 - Underground storage tank defined
- § 74:56:01:03 - Applicability
- § 74:56:01:04 - Performance standards for new UST systems - General requirements
- § 74:56:01:05 - Performance standards for new UST systems - Tanks
- § 74:56:01:06 - Performance standards for new UST systems - Piping
- § 74:56:01:07 - Performance standards for new UST systems - Spill and overfill protection
- § 74:56:01:08 - Performance standards for new UST systems - Installation requirements and submission of proof of compliance with requirements
- § 74:56:01:09 - Upgrading of existing UST systems - General requirements and deadlines
- § 74:56:01:10 - Upgrading of existing USTs - Specific requirements
- § 74:56:01:10.01 - Replacement of existing UST systems - Tanks
- § 74:56:01:10.02 - Replacement of existing UST systems - Piping
- § 74:56:01:10.03 - Installation of under-dispenser sumps
- § 74:56:01:11 - Notification requirements for UST systems
- § 74:56:01:12 - Completion of certification of compliance form for UST systems
- § 74:56:01:13 - Spill and overfill control
- § 74:56:01:14 - Operation and maintenance of cathodic protection
- § 74:56:01:15 - Operation and maintenance of cathodic protection - Criteria for taking tests
- § 74:56:01:16 - Operation and maintenance of cathodic protection - Recordkeeping
- § 74:56:01:17 - Compatibility
- § 74:56:01:18 - Repairs allowed - General requirements
- § 74:56:01:19 - Repairs allowed - Lining
- § 74:56:01:20 - Repairs allowed - Fiberglass-reinforced plastic tank systems
- § 74:56:01:21 - Repairs allowed - Piping
- § 74:56:01:22 - Repairs allowed - Recordkeeping
- § 74:56:01:23 - Maintenance and availability of records
- § 74:56:01:23.01 - Periodic testing of spill prevention equipment and containment sumps - General requirements
- § 74:56:01:23.02 - Periodic operation and maintenance walkthrough inspections
- § 74:56:01:24 - Release detection for all UST systems - General requirements and deadlines
- § 74:56:01:25 - Release detection requirements for regulated substance UST systems - Excluding hazardous substances
- § 74:56:01:26 - Release detection requirements - Tank tightness testing and inventory reconciliation
- § 74:56:01:27 - Release detection requirements - Vapor monitoring
- § 74:56:01:28 - Release detection requirements - Groundwater monitoring
- § 74:56:01:29 - Release detection requirements - Automatic tank monitoring
- § 74:56:01:30 - Release detection requirements - Secondary containment with interstitial monitoring
- § 74:56:01:31 - Release detection requirements - Manual tank monitoring
- § 74:56:01:32 - Release detection requirements - Hazardous substance UST systems
- § 74:56:01:33 - Release detection requirements - Other
- § 74:56:01:34 - Release detection requirements for pressure piping
- § 74:56:01:35 - Release detection requirements for suction piping
- § 74:56:01:36 - Release detection requirements for piping - Regulated hazardous substances
- § 74:56:01:37 - Release detection requirements for piping - Authority of department to approve
- § 74:56:01:38 - Recordkeeping
- § 74:56:01:38.01 - Training of owners and operators
- § 74:56:01:39 - [Repealed] Release notification plan
- § 74:56:01:40 - Reporting of suspected releases
- § 74:56:01:41 - Reporting of spills and overfills
- § 74:56:01:42 - Release investigation and confirmation
- § 74:56:01:43 - Off-site impacts and source investigation
- § 74:56:01:44 - General requirements for corrective action for releases from UST systems
- § 74:56:01:45 - Initial abatement requirements and procedures for releases from UST systems
- § 74:56:01:46 - Additional abatement requirements for hazardous substances
- § 74:56:01:47 - Free product removal
- § 74:56:01:48 - Additional site investigation for releases from UST systems
- § 74:56:01:49 - Soil and groundwater cleanup for releases from UST systems
- § 74:56:01:50 - Reporting of releases from UST systems.Repealed
- § 74:56:01:51 - Reporting of hazardous substance releases from UST systems
- § 74:56:01:52 - Temporary removal from use
- § 74:56:01:53 - Temporary closure
- § 74:56:01:53.01 - Bringing UST systems back into service
- § 74:56:01:54 - Permanent closure
- § 74:56:01:55 - Postclosure requirements
- § 74:56:01:56 - Failure to comply
- § 74:56:01:57 - Field constructed tanks/airport hydrant systems
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.