Utah Admin. Code R131-1-7 - Interviews with Architectural/Engineering Firms
(1) For all projects, interviews shall be
held with no less than the top three ranked firms competing for the project
design commission. The number of firms interviewed per project may vary
according to the size and complexity of the project. Multiple interviews may be
held on smaller projects at the discretion of the Executive Director.
(2) Firms selected to be interviewed shall be
provided with as much pertinent information as possible of the job at least one
week prior to the interview.
(3)
After composite rankings or interviews are completed, the selection committee
shall select the top three and rank them in order of selection.