Utah Admin. Code R131-4-507 - Qualifications of Contractors

(1) Pre-Bidding Requirements. The following documents must be on file with the board before the bidding documents for a project may be issued to prospective bidders.
(a) If the type of work involved with the project requires a contractor's license, a photocopy of the bidder's current Utah contractor's license showing date issued, expiration date, bid limit amount or similar restriction, and the class of work for which licensed;
(b) A statement from the bidder's surety stating that it will bond the bidder for an amount at least equal to the estimated cost of the contract as determined by the executive director. This requirement can be met by having the surety file an annual statement with the board showing the bonding limit it has established for the bidder.
(2) A form of surety statement and, when applicable, a form for prequalification, are available at the principal office of the board.
(3) Project Specific Requirements. The board may include additional qualification requirements in the solicitation documents as may be appropriate for a specific project.